Loading...
HomeMy WebLinkAbout20190847 Ver 2_Pre-Filing Meeting Request_20201012ID#* 20190847 Version* 2 Regional Office* Washington Regional Office - (252) 946-6481 Reviewer List* Robert Tankard Pre -Filing Meeting Request submitted 10/12/2020 Contact Name * Doug Dorman Contact Email Address* dougdaec@gmail.com Project Name* Scotch Bonnett Marina Project Owner* Peter O'Brien Project County* Dare Owner Address: Street Address 51684 NC 12 Hwy Address Line 2 PO Box 460 aty State / Province / Region Frisco NC Rbstal / Zip Code Country 27936 USA Is this a transportation project? * r Yes r No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F- 401 Water Quality Certification - Regular Express r- Individual Permit F- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Please list all existing project ID's associated with this projects.* DWR Project No. 19-0847, CAMA Major Permit 232-86 Do you know the name of the staff member you would like to request a meeting with? Chris Pullinger Please give a brief project description below.* Repair and/or replace existing bulkheads. Fill 9,500 square feet of existing man made basin to provide grass recreational area for Scotch Bonnet Mariana and Campground quests. Please give a couple of dates you are available for a meeting. 11 /2/2020 11 /9/2020 11 /12/2020 11 /13/2020 Please attach the documentation you would like to have the meeting about. O'Brien CAMA Maj.pdf 233.36KB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature ,, 5 ���"!mat"W�"V Submittal Date 10/12/2020 y r r r r r h i SEC ti1P i r r r r r J, A r r r r r r r r r r r EXISTING / 4rr�rrrrrrrrr BLDG r r r rrrrrrrrrrrrrrr 8 K9STING r r r r r r r r r LDG ��Grrrrrrrrrrrrr \ L P-R-OPAII�ILL rrrrrr \\ o_-S�1 U-Yrrrr EXISTIN rrrrrrrrrrr�rr BLDG RQPQ-SED--���� \ UFi,EADrrrr°�rrrrr EICISTIN \ r r r r 2Br STORE zo 22 r 18 17 1$--19 a STING \ a BOAT RAMP 30' DCM BUFFER LINE — EXISTING GRAVEL 75' AEC LIN \ r i SCOTCH BONNET MARINA & CAMPGROUND PETER ®BRIEN 51684 NC 12 HWY FRISCO — DARE COUNTY — NORTH CAROLINA 30' 0' 60' 120' 180' ATLANTIC ENV/RONMENTAL CONSUL 7ANTS LL C GRAPHIC SCALE 1 "= 60' P.O. 90.Y 3266, 1(17TY H,4WK, N.C. 27949 (252)261-7707, e-mail dougdoec®gmoil. com FILE: OBRIEN 2020 DATE: 10/12/20 REVISED: