HomeMy WebLinkAboutNCC193125_Notice of Termination_20201109Action History (UTC-05:00) Eastern Time (US & Canada)
Subrrit by Anonymous User 11/9/2020 8:51:25 AM (NOT Submittal)
Approve by Georgoulias, Bethany 11/9/2020 3:16:06 PM (NOT Request Review- NCC193125)
• The task was assigned to Georgoulias, Bethany. The due date is: November 12, 2020 5:00 PM
11/9/2020 8:51 AM
1 �
NORTH CAROLINA
Enrlronmenral Quallly
Certificate of NCC193125
Coverage (COC) Enter the Certificate of Coverage Nmber
No.*
Information associated with this permit
Project Name
Stonewater Subdivision Lot 138
Address
1505 Margrave, Wake Forest, NC
County
Wake
Latitude
35.9293
Longitude
-78.5031
Permittee Listed
Stellar Blu Construction, Inc
Legally Responsible
Kimberly Walters
Individual
NC Reference No.
NCG01-2019-3125
E&SC Plan ID
SEC-020565-2019
Original NOI
19312
Tracking No.
Date COC Issued
12/11/2019
Prior Rescission
Date populates only if OOCwas already rescinded at tirre of subaittal.
Date
Reason for Rescission/Termination Request:
Reason for F Project Closed -Out
Termination of r Sale (Another Owner/Operator will apply for a new COC)
Coverage * O Mistake or Invalid Coverage
r Other
Addional Mxe inforrration about the basis of this request, if needed.
Explanation
Supporting upload Supporting Docurrentation if applicable.
Documentation Mist beFDFforrrat
Project Close-out Information:
Final Close-out 7/2/2020
Inspection Approval
Project Close-out SEC-020565-2019 Certificate of
Approval 163.59KB
Completion_Lot 138_7-2-20. pdf
Documentation
Mist be FL7Fforrrat
North Carolina General Statute 143-215.66 (1) provides that:
Anyperson who knowinglymakes anyfalse statement, representation, or certification in anyapplication, record, report, plan, or other
documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement
of a material fact in a rulemaking proceeding or contested case underthis Article; orwho falsifies, tampers with, or knowinglyrenders
inaccurate anyrecording or monitoring deice or method required to be operated or maintained under this Article or rules of the
Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine notto exceed ten thousand
dollars ($10,000).
17 I, as an authorized representative, hereby request rescission of coverage under
the NPDES Stormwater Permit for the subject facility. I am familiar with the
information contained in this request and to the best of my knowledge and
belief such information is true, complete and accurate.
*This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a
president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B,
Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B,
Item (6) of that permit.
Signature
Type Name* Kimberly Walters
Title * President
Organization* Stellar Blu Construction
Date * 11 /09/2020
Email for beth@greenpointelandcorp.com
Confirmation *
Contact Telephone* 9194578402
NOT Certification NCG01-eNOT-Certification-Form-20190508-
Form DEMLR-SW Lot138Stonewater_Signed.pdf
Mist be Ft7F Forrrat
Is this COC Already Ensure this CCChas not been rescinded since subrrittal!
Rescinded?
Original Permittee CCdonNotificationErrails
Email kimberly@stellarbluconstruction.com
Original Site Contact CCd on Notificaiton Bmils
Email kimberly@stellarbluconstruction.com
362.14KB