HomeMy WebLinkAbout20201437 Ver 1_Pre-Filing Meeting Request_20201008ID#* 20201437 Version* 1
Regional Office* Fayetteville Regional Office - (910) 433-3300
Reviewer List* Chad Turlington
Pre -Filing Meeting Request submitted 10/8/2020
......................................................................................................................................................................................................................................................................................
Contact Name * Joey Lawler
Contact Email Address* jlawler@smeinc.com
Project Name* Line 1 Section 2 HDD - LT to Rose Lake
Project Owner*
Project County*
Owner Address:
Piedmont Natural Gas
Cumberland
Street Address
9751 Southern Pine Blvd
Address Line 2
aty
Charlotte
Fbstal / Zip Code
28273
Is this a transportation project?* r Yes r No
State / Province / Region
NC
Country
USA
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Chad Turlington
Please give a brief project description below.
Piedmont Natural Gas needs to replace a damaged segment of 12-inch
diameter Line 5 natural gas pipeline with a new segment that will be
installed by horizontal directional drill (HDD) within their existing 50-foot
wide easement.
This site is located between Black Creek Court and Rose Hill Road in
Fayetteville, Cumberland County. The segment of pipe proposed for
replacement is located beneath a pond and adjacent wetland area. The
pond was likely constructed at the headwaters of an unnamed tributary to
Rose Lake.
The project may require pre -construction written approval under
Nationwide Permit No. 12 and General Water Quality Certification No. 4133.
Please give a couple of dates you are available for a meeting.
10/30/2020
Please attach the documentation you would like to have the meeting about.
Line 5 Section 2 HDD - UT to Rose Lake.pdf 320.83KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
,7o Y L.4W1'I'l
Submittal Date 10/8/2020
G66gle Earth
ell
1.4
4L
ag Ila
e
<)
IVA
- fI - 6- . I .
005�e2-2020-03 Line 5 Sec 2 Dig 3 - .
qr A
W4 6 GO
m
ar ack
Pln
Hedge� UO
--.- -. f
T C)
LO
6.
2
CD
40
CD
S
00
Rose Lake
Cj
is e:
2000 ft or i