HomeMy WebLinkAbout20170149 Ver 3_PreFiling Email 30-Day Clock Reached Email_20201105Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Thursday, November 5, 2020 12:02 AM
To: richard.harmon@woodplc.com
Cc: Homewood, Sue
Subject: Pre -Filing Time Clock has been reached for Raw Water Intake and Conveyance Duke
Energy Marshall Steam Station - Raw Water Intake and Conveyance Duke Energy
Marshall Steam Station - 20170149 Ver 3
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Raw Water Intake
and Conveyance Duke Energy Marshall Steam Station that you submitted on 10/5/2020. The ID number for that project is
20170149, Version 3.
Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be
accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses are not monitored.
ID#* 20170149
Version* 3
Regional Office* Winston-Salem Regional Office - (336) 776-9800
Reviewer List* Sue Homewood
Pre -Filing Meeting Request submitted 10/5/2020
Contact Name * Richard Harmon
Contact Email Address* richard.harmon@woodplc.com
Project Name* Raw Water Intake and Conveyance Duke Energy Marshall Steam Station
Project Owner* Duke Energy Carolinas, LLC
Project County* Catawba
Owner Address: Street Address
526 South Church Street,
Address Line 2
mail Code 13k
aty State / Frovince / Region
Charlotte North Carolina
Rbstal/Zip Code Country
28202 USA
Is this a transportation project? * r Yes r No
Type(s) of approval sought from the DWR:
r- 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
W Individual Permit W Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Please list all existing project ID's associated with this projects.*
DWR # 20170149 v2
Do you know the name of the staff member you would like to request a meeting with?
Sue Homewood
Please give a brief project description below.*
Duke Energy at the Marshall Steam Station is proposing to install a raw
water intake, conveyance pipe, and airburst supply piping at the Marshall
Steam Plant located at 8320 NC-150 in Sherrills Ford, Catawba County,
North Carolina on Lake Norman. The proposed project is located on Duke
Energy properties, with the surrounding shoreline classified as public
infrastructures according to Duke Energy - Catawba-Wateree Federal
Energy Regulatory Commission (FERC) Shoreline Management Plan
(SMP). The 12-inch diameter high -density polyethylene water conveyance
pipe and intake screens are part of the groundwater remediation program
at the Marshall Steam Station.
The groundwater remediation program consists of groundwater extraction
and clean water infiltration. The new intake is designed to accommodate
the flows for the infiltration system as well as to provide water for dust
suppression at the facility that will be necessary during additional remedial
activities. The water for dust control will be used on haul roads, in ash
removal activities, in soil borrow areas and in the landfill construction and
operation activities. For the water used within the ash basin and landfill it
ultimately, if not absorbed, would go to a NPDES permitted system. For
other areas of the project there will not be any run-off from the dust control
operation going offsite. NPDES permit NC0004987 is being modified to
allow for groundwater that is being pumped from the extraction wells for
remediation to be discharged to an on -site wastewater treatment system
prior to discharging from NPDES permitted outfall 002.
To eliminate surface (land and lakebed) disturbance and to facilitate the
distance and depth of the intake screen array's targeted location in the
Lake, the piping will be installed via horizontal directional drill (HDD). The
HDD bore will require an excavated shallow "bore launch" pit roughly 8ft x
8ft x 4ft in which to launch and control the borehead, resulting in
approximately 10 cubic yard of excavation at the pit. The pit will be
backfilled with approximately 10 cubic yard of NCDOT No. 57 stone to
match surrounding and pre -construction lakebed slope and elevation.
Please give a couple of dates you are available for a meeting.
11 /5/2020
Please attach the documentation you would like to have the meeting about.
Marshall Plant Water Intake USACE Review
8.98MB
Request 09232020 final_.pdf
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
c/lfr9�lL'f�� � �lX�d
Submittal Date 10/5/2020