HomeMy WebLinkAboutWQ0019504_Staff Report_20201008,s State of North Carolina
Division of Water Resources
Water Quality Regional Operations Section
Environmental Staff Report
Quality
To: ❑ NPDES Unit ® Non -Discharge Unit Application No.: WQ0019504
Attn: Vivien.ZhonR&NCDENR.gov Facility name: City of Belmont WTP
County: Gaston
From: Mari a.Schutte&NCDENR.gov
Mooresville Regional Office
Note: This form has been adapted from the non -discharge facilily staff report to document the review of both non -
discharge and NPDES permit applications and/or renewals. Please complete all sections as they are applicable.
I. GENERAL AND SITE VISIT INFORMATION
1. Was a site visit conducted? ® Yes or ❑ No
a. Date of site visit: 10-02-2020.
b. Site visit conducted by: Maria Schulte.
c. Inspection report attached? ❑ Yes or ® No, Sent in separate email and available in BIMS.
d. Person contacted: Joseph Roy(WTP-ORC) by Email and their contact information: (704) 825-2625 or
jroy_kcityofbelmont.org.
e. Driving directions: From MRO travel to I-77 S: Exit onto I-485 W: take exit 12 and follow round -about to stay
on Moores Chapel Road. Turn right onto Moores Chapel Loop, Right onto 74 W, Left onto Catawba S., Right
onto 12ti` St, Right onto 10ti` St.
2. Discharge Point(s): NA — this is a non -discharge permit.
Latitude: Longitude:
Latitude: Longitude:
3. Receiving stream or affected surface waters:
Classification:
River Basin and Sub -basin No.
Describe receiving stream features and pertinent downstream uses:
IL PROPOSED FACILITIES: NEW APPLICATIONS
1. Facility Classification: (Please attach completed rating sheet to be attached to issued permit)
Proposed flow:
Current permitted flow:
2. Are the new treatment facilities adequate for the type of waste and disposal system? ❑ Yes or ❑ No
If no, explain:
3. Are site conditions (soils, depth to water table, etc.) consistent with the submitted reports? ❑ Yes ❑ No ❑ N/A
If no, please explain:
4. Do the plans and site map represent the actual site (property lines, wells, etc.)? ❑ Yes ❑ No ❑ N/A
If no, please explain:
FORM: WQROSSR 04-14 Page 1 of 4
5. Is the proposed residuals management plan adequate? ❑ Yes ❑ No ❑ N/A
If no, please explain:
6. Are the proposed application rates (e.g., hydraulic, nutrient) acceptable? ❑ Yes ❑ No ❑ N/A
If no, please explain:
7. Are there any setback conflicts for proposed treatment, storage and disposal sites? ❑ Yes or ❑ No
If yes, attach a map showing conflict areas.
8. Is the proposed or existing groundwater monitoring program adequate? ❑ Yes ❑ No ❑ N/A
If no, explain and recommend any changes to the groundwater monitoring program:
9. For residuals, will seasonal or other restrictions be required? ❑ Yes ❑ No ❑ N/A
If yes, attach list of sites with restrictions (Certification B)
Describe the residuals handling and utilization scheme:
10. Possible toxic impacts to surface waters:
11. Pretreatment Program (POTWs only):
III. EXISTING FACILITIES: MODIFICATION AND RENEWAL APPLICATIONS
1. Are there appropriately certified Operators in Charge (ORCs) for the facility? ❑ Yes ❑ No ® N/A
WWTP ORC: SI ORC: Certificate #: This is a distribution permit for Class A material
and currently Certified Operators are not required for all distribution activities: however, the Permittee contracts
with US Biosolids Inc. (formerly Southern Soil Builders) for land application events.
2. Are the design, maintenance and operation of the treatment facilities adequate for the type of waste and disposal
system? ® Yes or ❑ No
If no, please explain:
Description of existing facilities: Alum residuals are stored onsite in a 400,000 g tank until land applied or
properly disposed. In August 2020 disposal was managed by Eagle Dynamic Solutions. LLC out of Georgia. The
last land application event was in 2016.
Proposed flow:
Current permitted flow: NA — This is a Class A WTP Distribution Permit for 200 Dry Tons annually. They only
produce around 25 Dry Tons/Yr., but have capacity in the holding tank for approx. 3 years of storage between
distribution/application events.
Explain anything observed during the site visit that needs to be addressed by the permit, or that may be important
for the permit writer to know (i.e., equipment condition, function, maintenance, a change in facility ownership,
etc.)
3. Are the site conditions (e.g., soils, topography, depth to water table, etc.) maintained appropriately and adequately
assimilating the waste? ❑ Yes or ❑ No NA — This is a WTP non-503 residuals permit, specific fields and
maps are not required.
If no, please explain:
4. Has the site changed in any way that may affect the permit (e.g., drainage added, new wells inside the compliance
boundary, new development, etc.)? ❑ Yes or ® No
If yes, please explain:
5. Is the residuals management plan adequate? ® Yes or ❑ No
If no, please explain:
6. Are the existing application rates (e.g., hydraulic, nutrient) still acceptable? ❑ Yes or ® No
If no, please explain: Change with % Solids and application site. Lab analyses are due for all parameters prior to
the next distribution/land application event.
7. Is the existing groundwater monitoring program adequate? ❑ Yes ❑ No ® N/A
If no, explain and recommend any changes to the groundwater monitoring program:
FORM: WQROSSR 04-14 Page 2 of 4
8. Are there any setback conflicts for existing treatment, storage and disposal sites? ❑ Yes or ® No
If yes, attach a map showing conflict areas.
9. Is the description of the facilities as written in the existing permit correct? ® Yes or ❑ No
If no, please explain:
10. Were monitoring wells properly constructed and located'? ❑ Yes ❑ No ® N/A
If no, please explain:
11. Are the monitoring well coordinates correct in BIMS? ❑ Yes ❑ No ® N/A
If no, please complete the following (expand table if necessary):
Monitoring Well
Latitude
Longitude
C
C
C
C
C I II
C I II
12. Has a review of all self -monitoring data been conducted (e.g., DMR, NDMR, NDAR, GW)? ❑ Yes or ❑ No
Please summarize any findings resulting from this review: NA — Residuals Reportingis s required annually. There
has been no residuals application conducted under this permit since 2016.
Provide input to help the permit writer evaluate any requests for reduced monitoring, if applicable.
13. Are there any permit changes needed in order to address ongoing BIMS violations? ❑ Yes or ® No
If yes, please explain:
14. Check all that apply:
® No compliance issues ❑ Current enforcement action(s) ❑ Currently under JOC
❑ Notice(s) of violation ❑ Currently under SOC ❑ Currently under moratorium
Please explain and attach any documents that may help clarify answer/comments (i.e., NOV, NOD, etc.)
If the facility has had compliance problems during the permit cycle, please explain the status. Has the RO
been working with the Permittee?
Is a solution underway or in place?
Have all compliance dates/conditions in the existing permit been satisfied? ❑ Yes ® No ❑ N/A
If no, please explain: Residuals analyses will be due prior to a land application activity. All non -hazardous
sampling requirements are due once per permit cycle and metals and nutrient data are due annually when land
applying_
15. Are there any issues related to compliance/enforcement that should be resolved before issuing this permit?
❑ Yes® No ❑ N/A
If yes, please explain:
16. Possible toxic impacts to surface waters: This is a ND distribution of WTP Alum residuals. There should
be no impact to surface waters if managed appropriately.
17. Pretreatment Program (POTWs only):
FORM: WQROSSR 04-14 Page 3 of 4
IV. REGIONAL OFFICE RECOMMENDATIONS
1. Do you foresee any problems with issuance/renewal of this permit? ❑ Yes or ® No
If yes, please explain:
2. List any items that you would like the NPDES Unit or Non -Discharge Unit Central Office to obtain through an
additional information request:
Item
Reason
Highlight in Cover letter
that analyses are due prior
to distribution or land
application.
See comments in item III.6. and III.14. above.
3. List specific permit conditions recommended to be removed from the permit when issued:
Condition Reason
4. List specific special conditions or compliance schedules recommended to be included in the permit when issued:
Condition Reason
5. Recommendation: ❑ Hold, pending receipt and review of additional information by regional office
❑ Hold, pending review of draft permit by regional office
❑ Issue upon receipt of needed additional information (Only, if new waiver is needed.)
® Issue
❑ Deny (Please state reasons: )
6. Signature of report preparer: Maria Schutte — October 8'2020 DocuSi ned b :
Signature of regional supervisor: I p olol H P','"
Date: 10 . 8 . 2020 F161 FB69AWMA3...
V. ADDITIONAL REGIONAL STAFF REVIEW ITEMS
Update BIMS information for US Biosolids Inc. (formerly Southern Soil Builders).
FORM: WQROSSR 04-14 Page 4 of 4