HomeMy WebLinkAbout110011_Inspection_202011050 Division of Water Resources
❑ Division of Soil and Water Conservation
❑ Other Agency
Facility Number: 110011 Facility Status: Active Permit: AWC110011 ❑ Denied Access
Inspection Type: Compliance Inspection
Reason for Visit: Routine
Date of Visit: 11/05/2020 Entry Time
Farm Name: Lyndel Farm
Owner: Nancy Bonham
Mailing Address: 90 Bonham Rd
Physical Address: 90 Bonham Rd
10:00 am
Inactive Or Closed Date:
County: Buncombe Region: Asheville
Exit Time: 11:00 am Incident #:
Owner Email: +1ccows@bellsouth.net
Phone: 828-684-6046
Arden NC 287048709
Arden NC 28704
Facility Status: 0 Compliant ❑ Not Compliant Integrator:
Location of Farm: Latitude: 35° 27' 21" Longitude: 82' 35' 41"
Take Hwy. 191 South to Avery Creek Road. Turn left onto Pennsylvania Road, then left onto Bonham Road. Go to the dead end.
Question Areas:
Dischrge & Stream Impacts
Records and Documents
Certified Operator: Judith L Bonham
Secondary OIC(s):
Waste Col, Stor, & Treat 0 Waste Application
Operator Certification Number: 997082
On -Site Representative(s): Name Title Phone
24 hour contact name Lynn Bonham 828-606-8645
Primary Inspector:
Inspector Signature:
Secondary Inspector(s):
Timothy R Fox
Phone: 828-296-4500
Date:
Inspection Summary:
Tim Fox with ARO inspected the site. Lyn Bonham was present during the inspection.
3 waste anaylsis samples were provided. Calibration records will be due in 2021.
Certified operators will have until Decemebr 31, 2021 to obtain (6) CE training hours for the
3 year period 2018 through 2020.
We discussed the current staus of the annual reporting requirements and I will send a copy of the
new mortality form.
Page 1 of 5
Permit: AWC110011
Inspection Date: 11/05/20
Regulated Operations
Cattle
Owner: Nancy Bonham Facility Number: 110011
Inspection Type: Compliance Inspection Reason for Visit: Routine
Design Capacity Current promotions
Cattle -Milk Cow 200 I 189
Total Design Capacity: 200
Total SSLW: 280,000
Waste Structures
Effective Built Closed Designated Observed
Type Identifier Date Date Date Freeboard Freeboard
Waste Pond 01 03/24/2005 )5/30/1989 1 27.60
Page 2 of 5
Permit: AWC110011 Owner: Nancy Bonham Facility Number:
Inspection Date: 11/05/20 Inspection Type: Compliance Inspection Reason for Visit:
110011
Routine
Discharges & Stream Impacts
Yes
No NA NE
1. Is any discharge observed from any part of the operation?
❑
0 ❑
❑
Discharge originated at:
Structure
❑
Application Field
❑
Other
❑
a. Was conveyance man-made?
❑
0 ❑
❑
b. Did discharge reach Waters of the State? (if yes, notify DWQ)
❑
0 ❑
❑
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does discharge bypass the waste management system? (if yes, notify DWQ)
❑
0 ❑
❑
2. Is there evidence of a past discharge from any part of the operation?
❑
0 ❑
❑
3. Were there any observable adverse impacts or potential adverse impacts to Waters of the
❑
0 ❑
❑
State other than from a discharge?
Waste Collection, Storage & Treatment
Yes
No NA NE
4. Is storage capacity less than adequate?
❑
0 ❑
❑
If yes, is waste level into structural freeboard?
❑
5. Are there any immediate threats to the integrity of any of the structures observed (I.e./ larc
❑
0 ❑
❑
trees, severe erosion, seepage, etc.)?
6. Are there structures on -site that are not properly addressed and/or managed through a
❑
MEI
❑
waste management or closure plan?
7. Do any of the structures need maintenance or improvement?
❑
MEI
❑
8. Do any of the structures lack adequate markers as required by the permit? (Not applicablE
❑
0 ❑
❑
to roofed pits, dry stacks and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
❑
❑
❑
maintenance or improvement?
Waste Application
Yes No NA NE
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ 0 ❑ ❑
maintenance or improvement?
11. Is there evidence of incorrect application?
❑ 0 ❑ ❑
If yes, check the appropriate box below.
Excessive Ponding?
❑
Hydraulic Overload?
❑
Frozen Ground?
❑
Heavy metals (Cu, Zn, etc)?
❑
PAN?
❑
Is PAN > 10%/10 lbs.?
❑
Total Phosphorus?
❑
Failure to incorporate manure/sludge into bare soil?
❑
Outside of acceptable crop window?
❑
Evidence of wind drift?
❑
Application outside of application area?
❑
Crop Type 1
Corn (Silage)
Page 3 of 5
Permit: AWC110011 Owner: Nancy Bonham Facility Number: 110011
Inspection Date: 11/05/20 Inspection Type: Compliance Inspection Reason for Visit: Routine
Waste Application Yes No NA NE
Crop Type 2 Fescue (Hay, Pasture)
Crop Type 3 Small Grain (Wheat, Barley,
Oats)
Crop Type 4
Crop Type 5
Crop Type 6
Soil Type 1
Soil Type 2
Soil Type 3
Soil Type 4
Soil Type 5
Soil Type 6
14.
Do the receiving crops differ from those designated in the Certified Animal Waste
❑
0 ❑
❑
Management
Plan(CAWMP)?
15.
Does the receiving crop and/or land application site need improvement?
❑
0 ❑
❑
16.
Did the facility fail to secure and/or operate per the irrigation design or wettable acre
❑
0 ❑
❑
determination?
17.
Does the facility lack adequate acreage for land application?
❑
0 ❑
❑
18.
Is there a lack of properly operating waste application equipment?
❑
0 ❑
❑
Records and Documents
Yes
No NA NE
19. Did the facility fail to have Certificate of Coverage and Permit readily available?
❑
0 ❑ ❑
20. Does the facility fail to have all components of the CAWMP readily available?
❑
0 ❑ ❑
If yes, check the appropriate box below.
WUP?
❑
Checklists?
❑
Design?
❑
Maps?
❑
Lease Agreements?
❑
Other?
❑
If Other, please specify
21. Does record keeping need improvement?
❑
❑ ❑
If yes, check the appropriate box below.
Waste Application?
❑
Weekly Freeboard?
❑
Waste Analysis?
❑
Soil analysis?
❑
Waste Transfers?
❑
Weather code?
❑
Rainfall?
❑
Stocking?
❑
Page 4 of 5
Permit: AWC110011
Inspection Date: 11/05/20
Owner: Nancy Bonham Facility Number: 110011
Inspection Type: Compliance Inspection Reason for Visit: Routine
Records and Documents
Crop yields?
120 Minute inspections?
Monthly and 1" Rainfall Inspections
Sludge Survey
22. Did the facility fail to install and maintain a rain gauge?
23. If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipmen
(NPDES only)?
24. Did the facility fail to calibrate waste application equipment as required by the permit?
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check the
appropriate box(es) below:
Failure to complete annual sludge survey
Failure to develop a POA for sludge levels
Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge?
27. Did the facility fail to secure a phosphorous loss assessment (PLAT) certification?
Yes No NA NE
❑ ❑ ❑
❑■❑❑
❑■❑❑
Page 5 of 5