HomeMy WebLinkAboutNCC190623_NOT Closeout Documents_20201105Sedinientation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094
(910)433-3300
Park Place - Phase Two (Lots 30 &
County: Cumberland Project: 32-35) River basin: Cape Fear
Person financially responsible: Caviness and Cates Building and Project i#: CUMBE-2019-151
Development, Inc. - Patrick Raynor, CFO
Address: 639 Executive Place. Suite 400. Fayetteville. NC 28305
1. Project Location: Painters Mill Drive, Seventy First
Pictures: No
2. Weather and soil conditions: Dry, workable soils
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes
5. Violations:
Initial inspection: No
If no, check violations below:
6. Is the site in compliance with the NPDES Permit? N/A
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): No one Title:
Inspection report: Sent Report Date given/sent: April 212020
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance with the SPCA and
released.
A Certificate of Coverage was not obtained for this project. As of April L 2019. per the
General Permit NCG010000 for Construction Stormwater conditions. it is now required for a
Certificate of Coverage to be obtained, after the Letter of Approval is received for a project.
This should occur before the project commences and for all future projects. Please go to this
link where you can learn about the process involved with getting a Certificate of Coverage
and about the additional changes with the new General Permit. :
https://deq.nc.gov/about/divisions/energy-mineral-land-resources/energy-mineral-land-perm its
/stormwater-permits/construct ion-sw
Reported by: Melissa Joyner
Date of inspection: April 21, 2020
cc:
Others present:
Time arriving on site: 3:30 PM Time leaving site: 3:40 PM