Loading...
HomeMy WebLinkAboutNCC190623_NOT Closeout Documents_20201105Sedinientation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910)433-3300 Park Place - Phase Two (Lots 30 & County: Cumberland Project: 32-35) River basin: Cape Fear Person financially responsible: Caviness and Cates Building and Project i#: CUMBE-2019-151 Development, Inc. - Patrick Raynor, CFO Address: 639 Executive Place. Suite 400. Fayetteville. NC 28305 1. Project Location: Painters Mill Drive, Seventy First Pictures: No 2. Weather and soil conditions: Dry, workable soils 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: Initial inspection: No If no, check violations below: 6. Is the site in compliance with the NPDES Permit? N/A Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No one Title: Inspection report: Sent Report Date given/sent: April 212020 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance with the SPCA and released. A Certificate of Coverage was not obtained for this project. As of April L 2019. per the General Permit NCG010000 for Construction Stormwater conditions. it is now required for a Certificate of Coverage to be obtained, after the Letter of Approval is received for a project. This should occur before the project commences and for all future projects. Please go to this link where you can learn about the process involved with getting a Certificate of Coverage and about the additional changes with the new General Permit. : https://deq.nc.gov/about/divisions/energy-mineral-land-resources/energy-mineral-land-perm its /stormwater-permits/construct ion-sw Reported by: Melissa Joyner Date of inspection: April 21, 2020 cc: Others present: Time arriving on site: 3:30 PM Time leaving site: 3:40 PM