Loading...
HomeMy WebLinkAboutNCC190627_NOT Closeout Documents_20201105Sedimentation/Construetion Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources. Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 County: Cumberland Project: Park Place -Phase Two (Lot 31) Person financially responsible: Caviness and Cates Building and Development. Project #: Inc. - Patrick Raynor, CFO Address: 639 Executive Place. Suite 400, Fayetteville. NC 28305 I. Project Location: Painters Mill Drive, Seventy -First Pictures: No 2. Weather and soil conditions: Dry, workable soils 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A, and rules? Yes 5. Violations: River basin: Cape Fear CUMBE-2019-138 Initial inspection: No If no, check violations below: 6. Is the site in compliance with the NPDES Permit? N/A Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes. where? (check all that apply) Degree of damage: S. Contact made with (name): No one Title: Inspection report: Sent Report Date given/sent: April 23.2020 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance with the SPCA and released. A Certificate of Coverage was not obtained for this project. As of April 1.2019, per the General Permit NCG010000 for Construction Stormwater conditions, it is now required for a Certificate of Coverage to be obtained, after the Letter of Approval is received for a project. This should occur before the project commences and for all future projects. Please go to this link where you can learn about the process involved with getting a Certificate of Coverage and about the additional changes with the new General Permit. : https://deq. ne.gov/about/divisions/energy-m i neral-I and-resources/energy-mi neral-land-permits /stormwater-perm i is/construct ion-sw Reported by: Melissa Joyner Others present: Date of inspection: April 21, 2020 Time arriving on site: 3:20 PM Time leaving site: 3:30 PM cc: