Loading...
HomeMy WebLinkAboutNCC190882_Notice of Termination_20201105Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 11/5/2020 10:07:03 AM (NOT Submittal) Approve by Georgoulias, Bethany 11/5/2020 2:07:32 PM (NOT Request Review- NCC190882) • The task was assigned to Georgoulias, Bethany. The due date is: November 10, 2020 5:00 PM 11/5/2020 10:07 AM 1 � NORTH CAROLINA Enrlronmenral Quallly Certificate of NCC190882 Coverage (COC) Enter the Certificate of Coverage Nmber No.* Information associated with this permit Project Name Greenwood Cliff Temporary Parking Lot Address 1132 Greenwood Cliff, Charlotte, NC County Mecklenburg Latitude 35.2113 Longitude -80.8394 Permittee Listed Pappas Properties, LLC Legally Responsible Michael Moore Individual NC Reference No. NCG01-2019-0882 E&SC Plan ID LDGP-2019-00129 Original NOI 13195 Tracking No. Date COC Issued 7/9/2019 Prior Rescission Date populates only if OOCwas already rescinded at tirre of subaittal. Date Reason for Rescission/Termination Request: Reason for F Project Closed -Out Termination of r Sale (Another Owner/Operator will apply for a new COC) Coverage * O Mistake or Invalid Coverage r Other Addional We inforrration about the basis of this request, if needed. Explanation Supporting upload Supporting Docurrentation if applicable. Documentation Mist beFDFforrrat Project Close-out Information: Final Close-out 9/24/2019 Inspection Approval Project Close-out EC_Gradinglnspection4Mobile_20190925_050057... 109.03KB Approval Mast be RYforrrat Documentation North Carolina General Statute 143-215.66 (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules ofthe Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). 17 I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Michael Moore Title * VP of Construction Organization* Pappas Properties, LLC Date * 11 /05/2020 Email for mmoore@pappasproperties.com Confirmation * Contact Telephone* 704-716-3905 NOT Certification NOT Certification Form - NCC190882 - Greenwood Form Cliff Temporary Parking Lot 11.5.2020.pdf Mast be R F Fbrrrat Is this COC Already Ensure this CCChas not been rescinded since subrrittal! Rescinded? Original Permittee CCd on Wification BTails Email mmoore@pappasproperties.com Original Site Contact CCd on Kbtificaiton Bmils Email mmoore@pappasproperties.com 611.63KB