HomeMy WebLinkAboutNCC190882_Notice of Termination_20201105Action History (UTC-05:00) Eastern Time (US & Canada)
Subrrit by Anonymous User 11/5/2020 10:07:03 AM (NOT Submittal)
Approve by Georgoulias, Bethany 11/5/2020 2:07:32 PM (NOT Request Review- NCC190882)
• The task was assigned to Georgoulias, Bethany. The due date is: November 10, 2020 5:00 PM
11/5/2020 10:07 AM
1 �
NORTH CAROLINA
Enrlronmenral Quallly
Certificate of NCC190882
Coverage (COC) Enter the Certificate of Coverage Nmber
No.*
Information associated with this permit
Project Name
Greenwood Cliff Temporary Parking Lot
Address
1132 Greenwood Cliff, Charlotte, NC
County
Mecklenburg
Latitude
35.2113
Longitude
-80.8394
Permittee Listed
Pappas Properties, LLC
Legally Responsible
Michael Moore
Individual
NC Reference No.
NCG01-2019-0882
E&SC Plan ID
LDGP-2019-00129
Original NOI
13195
Tracking No.
Date COC Issued
7/9/2019
Prior Rescission
Date populates only if OOCwas already rescinded at tirre of subaittal.
Date
Reason for Rescission/Termination Request:
Reason for F Project Closed -Out
Termination of r Sale (Another Owner/Operator will apply for a new COC)
Coverage * O Mistake or Invalid Coverage
r Other
Addional We inforrration about the basis of this request, if needed.
Explanation
Supporting upload Supporting Docurrentation if applicable.
Documentation Mist beFDFforrrat
Project Close-out Information:
Final Close-out 9/24/2019
Inspection Approval
Project Close-out EC_Gradinglnspection4Mobile_20190925_050057... 109.03KB
Approval Mast be RYforrrat
Documentation
North Carolina General Statute 143-215.66 (1) provides that:
Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other
documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement
of a material fact in a rulemaking proceeding or contested case underthis Article; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules ofthe
Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand
dollars ($10,000).
17 I, as an authorized representative, hereby request rescission of coverage under
the NPDES Stormwater Permit for the subject facility. I am familiar with the
information contained in this request and to the best of my knowledge and
belief such information is true, complete and accurate.
*This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a
president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B,
Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B,
Item (6) of that permit.
Signature
Type Name* Michael Moore
Title * VP of Construction
Organization* Pappas Properties, LLC
Date * 11 /05/2020
Email for mmoore@pappasproperties.com
Confirmation *
Contact Telephone* 704-716-3905
NOT Certification NOT Certification Form - NCC190882 - Greenwood
Form Cliff Temporary Parking Lot 11.5.2020.pdf
Mast be R F Fbrrrat
Is this COC Already Ensure this CCChas not been rescinded since subrrittal!
Rescinded?
Original Permittee CCd on Wification BTails
Email mmoore@pappasproperties.com
Original Site Contact CCd on Kbtificaiton Bmils
Email mmoore@pappasproperties.com
611.63KB