HomeMy WebLinkAboutNCC190507_NOT Closeout Documents_20201105North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094
(910) 433-3300
County: Cumberland Project: Palestine Point Subdivision (Lot 9) River basin: Cape Fear
Person financially responsible: H&H Constructors, Inc. - Brian Walker, Division Project #: CUMBE-2019-140
Manager & Agent
Address: 2919 Breezewood Avenue, Suite 400, Fayetteville, NC
1. Project Location: Esau Street & Proverbs Street, Carvers
Pictures: No Creek
2. Weather and soil conditions: sunny Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name):
Inspection report: Gave Report
9. Corrective action needed:
Title:
Date given/sent: January 22, 2020
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is released. Termination of
coverage under the NPDES General Stormwater Permit for Construction Activities should be
requested by the permittee via a Notice of Termination.
Reference: COC NCC190507
Reported by: Lori Britt Others present:
Date of inspection: January 21, 2020 Time arriving on site: 8:10 AM Time leaving site: 8:15 AM
cc: