Loading...
HomeMy WebLinkAboutNCC190890_Notice of Termination_20201104Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 11/4/2020 1:13:32 PM (NOT Submittal) Approve by Georgoulias, Bethany 11/4/2020 1:23:49 PM (NOT Request Review- NCC190890) • The task was assigned to Georgoulias, Bethany. The due date is: November 9, 2020 5:00 PM 11/4/2020 1:13 PM 1 � NORTH CAROLINA Enrlronmenral Quallly Certificate of NCC190890 Coverage (COC) Enter the Certificate of Coverage Ninber No.* Information associated with this permit Project Name Riverbend Grading and E&SC Plan for Final Closure - Additional Area Address 473 Horseshoe Bend Beach Road, Mount Holly, NC County Gaston Latitude 35.3600 Longitude -80.9691 Permittee Listed Duke Energy Carolinas, LLC Legally Responsible Christopher Varner Individual NC Reference No. NCG01-2019-0890 E&SC Plan ID GASTO-2019-023 Original NOI 13138 Tracking No. Date COC Issued 7/9/2019 Prior Rescission Date populates only if COCwas already rescinded at tirre of submttal. Date Reason for Rescission/Termination Request: Reason for F Project Closed -Out Termination of r Sale (Another Owner/Operator will apply for a new COC) Coverage * r Mistake or Invalid Coverage r Other Add final We inforrration about the basis of this request, if needed. Explanation Project is complete Supporting Upload Supporting DDcunentation if applicable. Documentation Mist beFDFfornat Project Close-out Information: Final Close-out 10/21/2020 Inspection Approval Project Close-out 10-21-2020 Closure Inspection Report (GASTO- Approval 245.66KB 2019-023).pdf Documentation Mast be FDFforrrat North Carolina General Statute 143-215.613 (i) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). 17 I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature W. vw'ew Type Name* Christoper Varner Title * Senior Project Manager Organization* Duke Energy -Coal Combustion Products Date * 11/04/2020 Email for chris.varner@duke-energy.com Confirmation * Contact Telephone* 8284787104 NOT Certification NCG01-eNOT-Certification-Form-20190508- Form 282.7KB DEMLR-SW.pdf Mast be FDF Forrrat Is this COCAlready Ensure this OOChas not been rescinded since subrrittal! Rescinded? Original Permittee CCdonKlotificationErrails Email Chris.Varner@duke-energy.com Original Site Contact 0Cd on Wificaiton Errails Email Brad. Loveland@duke-energy.com