HomeMy WebLinkAboutNCC190620_NOT Closeout Documents_20201103Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094
(910) 433-3300
Peartree West. Section One, Part
County: Cumberland Project: Two - Lot 28 River basin: Cape Fear
Person fnancially responsible: Caviness and Cates Building and Development. Project 4: CUMBF-2019-147
Inc. - Patrick Raynor, CFO
Address: 639 Executive Place, Suite 400. Fayetteville, NC 28305
1. Project Location: Hunting Lodge Road, Rockfish Twsp
Pictures: No
2. Weather and soil conditions: Dry, workable soils Initial inspection: No
3. Is site currently under notice of violation? No
4. is the site in compliance with S.P.C.A. and rules? Yes If no. check violations below:
5. Violations:
6. Is the site in compliance with the NPDES Permit? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes. where? (check all that apply)
Degree of damage:
S. Contact made with (name): No one Title:
Inspection report: Sent Report Date given/sent: April 10, 2020
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance with the SPCA and
released. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities should be requested by the permittee via a Notice of Termination.
Please note that this correspondence must be uploaded as part of completing the Notice of
Termination process.
Reported by: Melissa Joyncr Others present:
Date of inspection: April 07. 2020 Time arriving on site: 10:05 AM Time leaving site: 10:15 AM
cc: