HomeMy WebLinkAbout20100096 Ver 1_DCM Permit_20100418'rcbakfrMA6ti rkCV4d --M*:^NS«}?S^'}?bh"Y:, ...-.. ?`°.4KitaYPK?S: Kz{ CK ??iC?$
Permit Class Permit Number
NEW
44-10
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and
Coastal Resources Commission
trmit
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
Excavation and/or filling pursuant to NCGS 113-229
Issued to James E. Silance, 566 Haws Run Rd., Jacksonville, NC 28540
Authorizing development in
Onslow
County ate. to Chadwick Bay, at 216 Shell Drive, in
Sneads Ferry as requested in the permittee's application dated 9/28/09. including the
attached workplan drawing (2), 1 dated 9/29/09 and 1 dated received in Wilmington on 10/27/09
This permit, issued on April 28, 2010 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
Shoreline Stabilization
1) The alignment of the authorized bulkhead and wingwall shall be staked by the permittee and
approved by a representative of the Division of Coastal Management within a maximum of 30 days
prior to the start of any construction. Failure to initiate construction within 30 days, or erosion of the
shoreline by adverse weather conditions shall require the alignment to be restaked by the permittee
and re-approved by DCM within a maximum of 30 days prior to the new expected start of
construction.
2) The authorized bulkhead and wingwall shall be located landward of the normal high water level and
all Coastal Wetlands at the time of construction.
(See attached sheet for Additional Conditions)
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
September 4, 2014
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DENR and the
Chairman of the Coastal Resources Commission.
Vkt?f
Xi mes H. Gregson, Director
vision of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
James E. Silance Permit # 44-10
Page 2 of 2
ADDITIONAL CONDITIONS
3) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the
structure.
4) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal sheet piles or other
suitable materials approved by department personnel. No excavation landward of the authorized
alignment is permitted except for that which may be required for the construction of the bulkhead wall,
riprap, deadmen cables, etc.
5) All backfill material shall be clean and free of any pollutants except in trace quantities.
6) All backfill material shall be obtained from a high ground source and confined behind the permitted
bulkhead.
Sedimentation and Erosion Control
7) In order to protect water quality, runoff from construction shall not visibly increase the amount of
suspended sediments in adjacent waters.
8) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to
ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence,
diversion swales or berms, etc.). At a minimum, a silt fence shall be properly installed immediately
landward of the bulkhead cap immediately following completion of backfilling activities.
9) All disturbed areas shall be properly graded and provided a ground cover sufficient to restrain erosion
within thirty days of project completion.
General
10) No vegetated wetlands shall be filled outside the area indicated on the attached workplan drawing.
11) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (910) 796-7215 prior to the commencement of any
such activity for this determination. The permittee is further advised that many non-water
dependent activities are not authorized within 30 feet of the normal high water level.
NOTE: The N.C. Division of Water Quality has assigned the proposed project DWQ Project No. 10
0096
NOTE: The U.S. Army Corps of Engineers has assigned the proposed project COE Action Id. No. SAW-
2009-02162
ter ¦!-1
APPLICATION for -?r-
Major Dovolopmont Permit
(last revised 12127106)
North Carolina DIVISION OF COASTAL MANAGEMENT
1. Primary Applicant/ Landowner Information
Business Name Project Name (if applicable)
Applicant 1: First Name MI
F, Last Name
-
Applicant 2: First Name MI Last Name
If additional applicants, please attach an additional page(s) with names listed.
Mailing Address PO Box City State
ZIP
assqi) Country
0. 6, A, Phone No.
3$9 0010 ext. FAX No.
- -
Street Address (if different from above) City State ZIP
Email
2. AgentJContractor Information
Business Name
Agent/ Contractor 1: First Name
Rpe?Elzlr MI
A. Last Name
Agent/ Contractor 2: First Name MI Last Name
Mailing Address
1
V% PO Box City State
TA. C.
7
ZIP
asq( .0 Phone No. 1
COO -3a7 - 347.5 ext. Phone No. 2
- - ext.
FAX No.
3;0- o13-5 Contractor #
Street Address (if different from above) City state ZIP
Email
<Form continues on backs OCT 2 7 2009
DCM WILMINGTON. C
Form DCM MP-1 (Page 2 of 4)
APPLICATION for
Major Development Permit
3. Project Location
County (can be multiple) Street Address State Rd. #
Subdivision Name City State Zip
61110241>6 VERZY C. '-160
- as
Phone No. Lot No.(s) (if many, attach additional page with list)
- - ext. , N/, ,
a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project
c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site.
Natural ?Manmade ?Unknown
e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed {
WYes ?No work falls within. iE
I oNSLot.,-,) coot'y'?
4. Site Description
a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.)
? ? o0o s /FT
c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or i
75 X oZG? NWL (normal water level)
(if many lot sizes, please attach additional page with a list) l t j/L (?NHW or ?NWL
e. Vegetation on tract
op11L T12?t
L-A ?,J N G MA-6bE.S
,
f. Man-made features and uses now on tract
I
P1sk , Doc y , c.ovaytec? & Duet'. 13om-LAFt Foe pw.:6oopA - %35,E.
g. Identify and describe the existing land uses adiacent to the proposed project site.
RE-610F--w r l AL.
h. How does local government zone the tract? L Is the proposed project consistent with the applicable zoning?
R (Attach zoning compliance certificate, if applicable)
Ryes ?No ?NA
j. Is the proposed activity part of an urban waterfront redevelopment proposal? ?Yes [9No
k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ?Yes 5(No ?NA
If yes, by whom?
1. Is the proposed project located in a National Registered Historic District or does it involve a ?Yes J$No ?NA
National Register listed or eligible property?
RECEIVED
<Form continues on next page>
OCT 2 2 2009
DCM WiLMINGTON, NC
Form DCM MP-1 (Page 3 of 4)
APPLICATION for
Major Development Permit
m. (i) Are there wetlands on the site? ®Yes ?No
(ii) Are there coastal wetlands on the site? ?Yes ®No
(iii) If yes to either (i) or (ii) above, has a delineation been conducted? ?Yes ®No
(Attach documentation, if available)
n. Describe existing wastewater treatment facilities.
,rir) v n1 ? C.1. P A L. 6sa) i`}Z
o. Describe existing drinking water supply source.
MO t4l C-A PAL
p. Describe existing storm water management or treatment systems.
-
5. Activities and Impacts
a. Will the project be for commercial, public, or private use? ?Cmmercial ?Public/Govemment
CgPrivate/Community
b. Give a brief description of purpose, use, and daily operations of the project when complete.
I NSTALL. k7cx:)Q keTpt 11.4 ?KICB, QRov t of p>ko v ecr%o a t oR
F-OTO ZEE %A OME St-,,E.
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored. %z A U- vc) L1. ?? 1 N:STA
JsttNG ?l?S2ATo12.?
"Pi ry7m iyQ 6 S M A U. '" %pw-1L ?1p k (fit) t PM Ert`C t? 11.L. 3 1. r"'C o tit Jp>3
tv t?'tl=. t.?t1T11? CDMPI,??U,
d. List all development activities you propose.
R66oc.'t Ai?c0 Pc.?v??s WITH ? A)N1r1C? tJ?Ll.. 11 bk TR4LLR-001,.
e. Are the proposed activities maintenance of an existing project, new work, or both?
tN?E?J ?D2?G
f. What is the approximate total disturbed land area resulting from the proposed project? 59Sq.Ft or ?Acres
o'Z.GOC7
g. Will the proposed project encroach on any public easement, public accessway or other area ?Yes No ?NA
that the public has established use of?
h. Describe location and type of existing and proposed discharges to waters of the state.
SKEET IFLIDLJ
i. Will wastewater or stormwater be discharged into a wetland? ?Yes PSNo ?NA
If yes, will this discharged water be of the same salinity as the receiving water? ?Yes ?No ?NA
j. Is there any mitigation proposed? ?Yes Wo ?NA
If yes, attach a mitigation proposal.
V r: V
<Form continues on back>
OCT 2 7 2009
Form DCM MP-1 (Page 4 of 4)
APPLICATION for
Major Development Permit
6. Additional Information
In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application
package to be complete. Items (a) - (f) are always applicable to any major development application. Please consult the application
instruction booklet on how to properly prepare the required items below
a. A project narrative.
b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
Name C A R (DoN-l VOhl .31 e 5 i /h? Phone No.
Address r. Sax '/af3 joaaRu) mr- aa'/a!a 9/0-a_5!2- Z) 7S
Name m 1 C.t-} PkQ- LJ. ACL0 Phone No.
Address o"L 14 6kJeXL D2_ 51st qW J=t-QQg NL 9 gyp- 3A>- a7 /S
Name Phone No.
Address
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates.
PE2m„-r CcamA) -* S4085
h. Signed consultant or agent authorization form, if applicable.
L Wetland delineation, if necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
1 7. Certification and Permission to Enter on Land
1 understand that any permit issued in response to this application Will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in oDnnection with evaluating information related to this permit application and follow-up
monitoring of the project.
I further certify that the information provided in this application is truthful to the best of my knowledge.
Date Print Name 19C E/6H7-D[
Signature
Please indicate application attachments pertaining to your proposed project.
KDCM MP-2 Excavation and Fill Information ?DCM MP-5 Bridges and Culve
?DCM MP-3 Upland Development
?DCM MP-4 Structures Information OCT 2 7 2009
DUA WILMINGTON, NC
Form DCM MP-2
EXCAVATION and FILL
(Except for bridges and culverts)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet.
Access Other
Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding
(NLW or Breakwater shoreline
NWL stabilization
Length
Width
Avg. Existing NA NA
Depth
Final Project NA NA
Depth
1. EXCAVATION 19This section not applicable
a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated.
cubic yards.
c. (i) Does the area to be excavated include coastal wetlands/marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
?CW ?SAV ?SB
?WL ?None
(ii) Describe the purpose of the excavation in these areas:
d. High-ground excavation in cubic yards.
12. DISPOSAL OF EXCAVATED MATERIAL 1KThis section not applicable
a.
area.
b. Dimensions of diSDosal area.
c. (i) Do you claim title to disposal area?
?Yes ?No ?NA
(ii) If no, attach a letter granting permission from the owner.
e. (i) Does the disposal area include any coastal wetlands/marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
?CW ?SAV ?SB
?WL ?None
(ii) Describe the purpose of disposal in these areas:
d. (i) Will a disposal area be available for future maintenance?
?Yes ?No ?NA
(ii) If yes, where?
f. (1) Does the disposal include any area in the water?
?Yes ?No ?NA
(ii) If yes, how much water area is affected?
5 11
RECEN ED
OCT 2 7 2009
DCM WILMINGTON, C
3. SHORELINE STABILIZATION ?This section not applicable
(If development is a wood groin, use MP-4 - Structures)
a. Type of shoreline stabilization:
Bulkhead ?Riprap ?Breakwater/Sill ?Other:
c. Average distance waterward of NHW or NWL:
e. Type of stabilization material:
g. Number of square feet of fill to be placed below water level.
Bulkhead backfill Riprap
Breakwater/Sill Other
i. Source of fill material.
b. Length:
Width:
d. Maximum distance waterward of NHW or NWL:
f. (1) Has there been shoreline erosion during preceding 12
months?
?Yes ®No ?NA
(ii) If yes, state amount of erosion and source of erosion amount
information.
h. Type of fill material.
4. OTHER FILL ACTIVITIES KThis section not applicable
(Excluding Shoreline Stabilization)
a. (i) Will fill material be brought to the site? ?Yes ?No ?NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW),
If yes,
(ii) Amount of material to be placed in the water
(iii) Dimensions of fill area
(iv) Purpose of fill
submerged aquatic vegetation (SAV), shell bottom (SB), or
other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
?CW ?SAV ?SB
?WL ?None
(ii) Describe the purpose of the fill in these areas:
5. GENERAL
a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline,
controlled? backhoe, or hydraulic dredge)?
__ _ -5 10- F EMC; _ 13 RcY1-kos %Z IT" y VaRc "i b9tZ ?
c. (i) Will navigational aids be required as a result of the project?
?Yes %No ?NA
(ii) If yes, explain what type and how they will be implemented.
ti (amnnt`.2
d. (I) Will wetlands be crossed in transporting equipment to project
site? ?Yes ®No ?NA
(ii) If yes, explain steps that will be taken to avoid or minimize
environmental impacts.
AL /3,6J6HToL
Date Applicant Name
Project Name Applicant Signature OCT 2 7 2009
a"®f''°M ®e 1 M4'NG4: 118s k:.e,
t
f
r 3
V
3
- 3
E I
R-ECENED
?vti S Hilt .
OCT 2 7 2009
DCNA iNiLMINGT W NC
o l " 3jj i
t
1
E
r
t ,
-
F `
Jd
f
s r
? g
I
i RECEVVED
OCT 2 7 2009
GTON, NC
I