I received your letter dated March 30, 2010 requesting additional information for the PCN
Application regarding Mr. Carroll Jones property at Sapphire Ridge in Jackson County North
Carolina.
After speaking with the local DNR representative, I changed the type of approval sought
from Non-404 Jurisdictional General Permit TO 401 Water Quality Certification-Regular.
I also obtained a letter from Mr. Jones authorizing me to act as his agent.
Attached to this letter are:
• A revised PCN Form
• A letter from Mr. Jones
• Two Vicinity maps
• A Bank stabilization drawing (suggested by local DNR)
Please call me if you need additional information.
Sincerely,
Edgens Architect, PLLC
ZZ - ? fl
Sam Edgens, AIA
P . O . B O X 21 40 . H I G H L A N D S, N O R T H CAROLINA . 2 8 7 4 1
,+ . ?`g ?,
?a
April 7, 20 10
Mr. Ian McMillan
Acting Supervisor
401 Oversight/Express permitting Unit
1650 Mail Service Center
Raleigh, NC 27699-1650
RE: Agent Applicant
Dear Mr. McMillan,
I, Carroll Jones, do hear by authorize Mr. Sam Edgens, AIA to represent me as my agent
with regard to completion of the Division of Water Quality Pre-Construction Notification
(PCN) Form.
Thank you,
Carroll P. Jones
Mr. Carroll P. Jones
710 Whitemere Court
Atlanta, GA. 30327
Y,I?Y- a s2 -7 1-111
y- J- 7-9- lU3 ?/
, ma
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Edgens Architects, PLLC
Sam Edgens
PO Box 2140
Highlands, North Carolina 28741
Division of Water Quality
Coleen H. Sullins
Director
March 30, 2010
Dee Freeman
Secretary
DWQ Project # Not Assigned
Jackson County
Subject Property: Jones Residence
Agent Authorization, Non-404 Jurisdictional General Permit Verification
RETURN OF PCN APPLICATION
Dear Mr. Edgens:
On March 29, 2010, the Division of Water Quality (DWQ) received the PCN application dated
March 19, 2010 for the above referenced project. The DWQ has determined that your application was
incomplete and/or provided inaccurate information as discussed below.
Additional Information Requested:
1. DWQ will need confirmation the US Army Corps of Engineers Asheville Regulatory
Office determined that this particular creek is Non-404 jurisdictional and not regulated
under Section 404 of the Clean Water Act.
2. Your signature on page 10 of 10 is not valid without an authorization letter from the
applicant.
Thank you for your attention. If you have any questions, please contact Ian McMillan or me in our
Central Office in Raleigh at (919) 733-1786.
Sincerely,
Ian McMillan, Acting Supervisor
401 Oversight/Express Permitting Unit
401 Oversight/Express Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
Location: 2321 Crabtree Blvd., Raleigh, North Carolina 27604
Phone 919-733-17861 FAX: 919-733-6893
Internet: http:l/h2o.enr.state.ne.us/ncwetlands/
NorthCarolina
?aturalI
An Equal Opportunity', Affirmative Action Employer
IJM/ jd
Enclosure: PCN dated March 19, 2010
cc: USACE Asheville Regulatory Field Office
Carroll P Jones, 710 Whitemere Ct., Atlanta GA 30327
File Copy
Filename: Jones Residence(Jackson)_PCNRetU_Authorization
20100303
W A
O
TFROG
1 l >
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.3 Dec 10 2008
Pre-Construction Notification PCN Form
A. Applicant Information
1. Processing
Q r-
1 a. Type(s) of approval sought from the
Corps: 1 - IO
Section 404 Permit ? Section 10 Permit
1 b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: N/A
1 c. Has the NWP or GP number been verified by the Corps? ? Yes ® No
1 d. Type(s) of approval sought from the DWQ (check all that a pl
401 Water Quality Certification - Regular Non-404 Jurisdictional General Permit
? 401 Water Quality Certification - Express ? Riparian Buffer Authorization
le. Is this notification solely for the record
because written approval is not required? For the record only for DWQ 401
Certification:
? Yes ® No For the record only for Corps Permit:
® Yes ? No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program. ? Yes ® No
1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h
below. ? Yes ® No
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ? No
2. Project Information
2a. Name of project: Jone Residence
2b. County: Jackson
2c. Nearest municipality / town: Cashiers
2d. Subdivision name: Sapphire Ridge
2e. NCDOT only, T.I.P. or state
project no: 0
Ilk
3. Owner Information Ini M AR 2 92010
3a. Name(s) on Recorded Deed: Carroll P. Jones
3b. Deed Book and Page No. 1ERaMWCH
3c. Responsible Party (for LLC if
applicable):
3d. Street address:
D
710 Whitemere Court
3e. City, state, zip: Atlanta, GA 30327.
3f. Telephone no.: 404-252-2784 APR 2 6 2010
3g. Fax no.: DENR -MATER OUAUTY
3h. Email address: carroll@1-binc.com ATERDRANCH
Page I of 10
Il PIhl r.._.... ?.. _..:_.. 4 O n....,..,... 1...._ 4A 'Irma ?., ....:., ..
I J
it
r.
. ? ?{'. .. `fit` n
i
4. Applicant Information (if different from owner)
4a. Applicant is: ® Agent ? Other, specify:
4b. Name: Sam Edgens
4c. Business name
(if applicable): Edgens Architects, PLLC
4d. Street address: P.O. Box 2140
4e. City, state, zip: Highlands, NC. 28741
4f. Telephone no.: 828-526-2413
4g. Fax no.: SAME
4h. Email address: sam@edgensarchitects.com
5. Agent/Consultant Information (if applicable)
5a. Name:
5b. Business name
(if applicable):
5c. Street address:
5d. City, state, zip:
5e. Telephone no.:
5f. Fax no.:
5g. Email address:
Page 2 of 10
nnwl rl__ .. %?.. ?..:..., 4 n M,,,,,.....t,- qn nnno ?.....,:,, ..
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID): Lot 24
1 b. Site coordinates (in decimal degrees): Latitude: Longitude: -
(DD.DDDDDD) (-DD.DDDDDD)
1c. Property size: 2.47 acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to
proposed project: b4bjt ?Lake
2b. Water Quality Classification of nearest receiving water:
2c. River basin: sture
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Wooded with a few homes nearby
3b. List the total estimated acreage of all existing wetlands on the property:
0
3c. List the total estimated linear feet of all existing streams (interm
450 feet ittent and perennial) on the property:
3d. Explain the purpose of the proposed project:
Residential
3e. Describe the overall project in detail, including the type of equipment to be used:
Residential. Backhoes
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past?
Comments:
? Yes ®No ? Unknown
4b. If the Corps made the jurisdictional determination, what type
of determination was made?
? Preliminary ? Final
4c. If yes, who delineated the jurisdictional areas?
Name (if known): Agency/Consultant Company:
Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5. Project History
5a. Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past? ? Yes ? No ® Unknown
5b. If yes, explain in detail according to "help file" instructions.
6. Future Project Plans
6a. Is this a phased project? ? Yes ® No
6b. If yes, explain.
_to
Page 3 of 10
nn6i r....... %/.....:.... .1 O n......../.1..... 4 o nr%n0 ?..-..:..w
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
? Wetlands ® Streams - tributaries ? Buffers
? Open Waters ? Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ - non-404, other) (acres)
Temporary
W1 ? P ? T ? Yes ? Corps
? No ? DWQ
W2 ? P ? T ? Yes ? Corps
? No ? DWQ
W3 ? P ? T ? Yes ? Corps
? No ? DWQ
W4 ? PEI T ? Yes ? Corps
? No ? DWQ
W5 ? P ? T ? Yes ? Corps
? No ? DWQ
W6 ? P ? T ? Yes ? Corps
? No ? DWQ
2g. Total wetland impacts
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact
number - (PER) or (Corps - 404, 10 stream length
Permanent (P) or intermittent DWQ - non-404, width (linear
Temporary (T) ut%ftye4WL (INT)? other) (feet) feet)
S1 )(P OJT Culvert 1t^%VM)n A. XPER $(
WQ 2 20
? p
S2 ? P ? T s
? PER
? Corps
? INT ? DWQ
S3 ? P ? T ? PER ? Corps
? INT ? DWQ
S4 ? P ? T ? PER ? Corps
? INT ? DWQ
S5 ? P ? T ? PER ? Corps
? INT ? DWQ
S6 ? P ? T ? PER ? Corps
? INT ? DWQ
3h. Total stream and tributary impacts
3i. Comments:
?. • 2t •tv
Page 4 of 10
rielki f---- 4f% nf%f%O
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of waterbody
impact number - (if applicable) Type of impact Waterbody type Area of impact (acres)
Permanent (P) or
Temporary
01 ?P?T
02 ?P?T
03 ?P?T
04 ?P?T
4f. Total open water impacts
4g. Comments:
6. Pond or Lake Construction
If and or lake construction proposed, then complete the chart below.
5a. 5b. 5c. 5d. 5e.
Wetland Impacts (acres) Stream Impacts (feet) Upland
Pond ID Proposed use or purpose (acres)
number of pond
Flooded Filled Excavated Flooded Filled Excavated Flooded
P1
P2
5f. Total
5g. Comments:
5h. Is a dam high hazard permit required?
? Yes ? No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If an impacts require mitigation, then you MUST fill out Section D of this form.
6a.
? Neuse ? Tar-Pamlico ? Other:
Project is in which protected basin? ? Catawba ? Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number - Reason Buffer Zone 1 impact Zone 2 impact
Permanent (P) or for Stream name mitigation (square feet) (square feet)
Temporary impact required?
61 ?P?T ?Yes
? No
B2 ?P?T ?Yes
? No
B3 ?P?T ?Yes
? No
6h. Total buffer impacts
6i. Comments:
Page 5 of 10
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State? ? Yes ? No
2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps
2c. If yes, which mitigation option will be used for this
project?
pro ? Mitigation bank
El Payment to in-lieu fee program
? Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter) Type Quantity
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. ? Yes
4b. Stream mitigation requested: linear feet
4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 6 of 10
nnkl r__..... ?? _ 4 o n _._6 _ 4 n nnna ?? _ _
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation? ? Yes ? No
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
Zone 6c.
Reason for impact 6d.
Total impact
(square feet)
Multiplier 6e.
Required mitigation
(square feet)
Zone 1 3 (2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
Page 7 of 10
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified ? Yes ® No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
? Yes ? No
Comments:
2. Stormwater Management Plan
2a. What is the overall percent imperviousness of this project? N/A %
2b. Does this project require a Stormwater Management Plan? ? Yes ® No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Typical residential project
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, na rrative description of the plan:
® Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program
? DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project? Jackson County
? Phase II
3b. Which of the following locally-implemented stormwater management programs ? NSW
? USMP
apply (check all that apply): ® Water Supply Watershed
? Other:
3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ® No
attached?
4. DWQ Stormwater Program Review
? Coastal counties
? HQW
4a. Which of the following state-implemented stormwater management programs apply ? ORW
(check all that apply): ? Session Law 2006-246
? Other: ?
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? ? Yes ® No
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No
5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No
Page 8 of 10
nnki r.._.... 11......:- 4 O n.........."-- en nnno v
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1a. Does the project involve an expenditure of public (federal/state/local) funds or the ? Yes ® No
use of public (federal/state) land?
1 b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State ? Yes ? No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
? Yes
? No
letter.)
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b. Is this an after-the-fact permit application? ? Yes ® No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No
additional development, which could impact nearby downstream water quality?
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
Septic system
Page 9 of 10
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or
habitat? ? Yes ® No
5b. Have you checked with the USFWS concerning Endangered Species Act
impacts? ? Yes ® No
5c. If yes, indicate the USFWS Field Office you have contacted. ?
Raleigh
? Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
Local DNR
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
? Yes ® No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ® No
8b. If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination?
Sam Edgens 24 03/19/10
Applicant/Agent's Printed Name Applicant/Agen Signature
(Agent's signature is valid only if an authorization letter from the applicant
is provided.) Date
4,
Page 10 of 10
nr+e1 r......., a.., ... 4 o n.. ?. An nnno i. .:..
Is 'Lo-148 I~
• 4 YAL? C'%4
c4k3rx
s? ?4iul
pp '? f r ?r3i9 14
,?'?? yJ+ /??',? - •x q,r r ? 4r?n, •'?? F'„-^, _?' 4, -.-x 'rr .'?y'??r ?i }. ?' ,n ?`??l'??3J`. y?' # ?? T
JS,,ty h •'7 I'?f ?' M .C - 'fib' ..4'. ?rl-y 'M?.'y p S' - } ti .1.?' ?? y„.
tt ? ??:.:. i t ?'2`a Y ?F ! •rt _,? ? ? t3 ?9YlG°' ??f?`{ f?v nr?i Ir a ?i?:
04
j1p
it of i,--- r e T »:. ,,* ?.• Fti ?j){- r't ,,{',?
5. ?4t
.;F it
??:"" ? `.? ,? r xrr14G•' ?R ?-:,41?'???m ? t*.7t1 / ...?
A 14,
jail
x 'rr,?, ???; '? ,?+,"„_;!? ?' •`? ?_ 3 ?. ,s`.. ? R?? ,? _ +?n ._ , r.P?..' ='C?? 'a';' ?-fit ,'aJjfr,?'?"`- ')``?'? ?' '? j
,'4,y4 `>t fF ? ,may ?i. r ?i'?,•i'Y .?E`tP'- S•,,,???..?' ??? .,}??t rr ?:.,, f+P„La'?f k. ?;" ,,?6'?!. N ?t
??? ?y ?- ??wy,??, r' iq' •??_ 7'r?,cl .7? ??_4? , a `•r `?' ? ,}?~ ?"•' T ? 'ny? ; (./r..?. :? ????{?p? ^?.3'??s?,?y] ti ,?c
impt r? _. .Y . S , ryfp???.pdra yf? s )"mac
C; ,.. Y 6? s - _ +L ',..?' t?" ,jl€}?r?'"- `'?•''# q?Ii w 1#'$•`?'?+r?"?.''ZprY'14,,.;yj
Y l.?M.i JR'4?J.: ?'4? ?1'y :??1. ..y,.`+S ?r 4?+? l:k '•
r_(t'r % 'wra •: -t p?tr , c.: +?i?p?'?.w ,<?j(?S? ?C`D"? ,•Y::r?.??rtibcr t?f 'y
xs " r. .741 ? tl.. ': ?dt., _ ?*. "w ?.y,? ?i .'f??{? ? + '4-. 1 ?F'+1?.? '+ ?..<?TV+?.7r?jl,??r'f?s ? ? ?'r? •
- '??L'?'` ? ?' -r ? ?`'??.-. ?" ° +??i? )??.'aeii' :' SV „+I?.? _ "? y `? ? CCU' .4 r>iq"?; it?''? • i Stdt r? ? ?^?i?-y?C`?
" ?1`? :` f?"'> •!t-,? .. ., ... .? r•r * Nr"* rt .,jam :C a, s '.,"SF s a
091
a ry +I .? y :' .? ??q'"•,• q z ?. ` ? r 4 ?,y,
?-
07f '?"... ." ,? ?, ?„ 'Pd R ': ,#'? RtE"_ ?, < i' -`?r,• „?`x r • y`.
`t iar Nth Cashiers J
+e-?-g?a lw- ?w'CS ?
W
f? ,j *4° 'n 4~•3g,.i..F`•,'h? L'? F' A. + `^4w?',:q
T o qti> y' ?tq{was n R,r .` ,ry?} ,rR -i ty ?i , Q!„?J"5 llye
t?# i •.??1.\? ,a: , ;0E7 rth/. '?-'?' ` *f r?-'"r,r?.. ?C 4 s3:, :??r,45.'... Y C•t.' ,
'?!"? }?A r iss:>. ? _ i? '*•r? , ? ",? f.ay? ?"..; c ?t?' -? ?j"?ti?',,•r",? t,,y?,;??''E ?. ''? ?'` ?w??.r^q.?,,,
R+ ry{? tC$K`ty ??r,' s .t ?? r t 1 4? { IT
l???,
J,.?? '?• "a?Sy,? vs?,?
!` ?' rte] '?`?• ~? "may, s'' .t 4: -`!?,go} .r'','}?t$?r ?`'??'?gz ??' r f?a_ `?'i O
pf" ?yy, J+ ? ah n Th :?
s?; ro ? / ?•, ?,?,, ? ? _ Y ?'?j???..? ?, ?f ,1?Frt? ?.? ?'??Y _ ??"r .? rtb ya'E
??'?4w •?'£r. d`?? ty,? r ?;"? `?Y? ;? T..-. N a?o'? .??'i?h-Dc. ;'?a$"I?'?,?,,jr .?' s?J1Rt.?:a14s<r?s4?' ?+ .'fie' ?4
`. b, ?.. ??-'- ? ? ?` ? .'I ? k `t .?`,$o f..h_ r-v ?Y ) . a; 4?'f,?'. G? t" : - ?„a• "+F'y'fd Y'.., N,?r` .t ::1i• ?y.jr !i t?.
* ? ' r ? _ ??•' ?y ;Zx' `???????` a. ,,QTY 3x i y ?'Cky?.w?`1 Al e. ?•.?r, 'fa0 `
r, ?+?' 1"? i s A + e \^.r y. .ik!'Y'"' ? ?Y??{-4"'yp-. ". '."a 'Y?.`4? ?,b v i ?•.? `'???
_'. A r
?„? " .a` ?.? dir. -+1?.`"' .. ?? ? _ ? '?t?? w? ? _ ?. `? •,?;. ?' _ ,,,n.:, u+-^ ,
,y ? A? ? Y afi ,., 'r 'c•^"'? ? ? .e ti's ?A ? ! • ? $*.r, r "1? ?t Tl
5?;?? a . t s'K sel; R la?? ?J ?? Y 'i..° "'!? :?i " ` y `•?'^ s'`,? ? .a ?y ?1s
A?' fir yr t y T ?- ' ?y?lk' it" ±. ?F=s4
? •- ? ?'? y ?r????I'?'r?r " r? i.1r t'S» - ,vim a"??'.,•.- ?• -? _,?`y, .' _ - c "a'}•
i i 7.% ?. ^4<r? a y?'t. ?_? '?4 ?- ?`?f 'P •• L [+?n' _.r??i??
?y'1+r ?
,' ^?'° r iy. s?. q yr X
yy'<l??, ? p?' ? .,a? rl ? s Y ? ??. ??? . ,?,.AArT? A" ' ?.AF ,?T e • ? ? S.- 4r"
6i'?:.?..+si ??,.ar,? +?r .._??? . .. R•? bD ??•?•, .•t}' tii4 it .-J_. ? Nti?. w
V
? 2
`? ? ?
? 3
? v
? ? ? ?
???
?? ?
Q?
???
???,
??
??
17
271
1. f ./'(, `?? ,\ `{4 \... t f- Od • ( ` _.
?? / 7., 1\ d... g f j \
:?? ; ? r t--. ? ? • `o??\ , 4e?? ..?? `~ r?i r' 1 rl'? ?` '`? ,,. f ?' : ? ` t ' 4
lit'
40
j ,
r..'' I 4000
t ? 3 s?•V',,1 , It ,"?', .
r (Jl ' ? 7,, ?'? ? j r ?' ?,1 ?-..",--?\?? ? t•-„ `--,-?..?'/ ? ----,? t ?ti ", '? .\_,,??`b l? 1' i, -
i
! l x!r._f /i 1' /% /r 1 • . tit f ?, f r
It I--
fee
?? \tt rr \! \?} ?I i ~ ~? ///L f I,(rL tal#
i)
? f r??l1 I a?
1 y y? r!?
S , -?/ J i ! r'??,._-^ -„ `/' f I "`s,_f' ! ? k ?< '•? 1 s ,? 1. -`\ -\.' ^-, 4-. .r, ti .._ ?.\J• ?.,s•.
?,? ? w f rI ? ?\?? ! ??/ f ^, f'I f t `k ?_/' I p I { t Pi • ?` r i? ak6 s `k, ? `\.._ /\ ? `- ?r ? , tip. } } 1 ? .,' _ ????
At \, y1 .. :.^` '.?I ?', ?.?1'".,,,,,';S? ,r ` (? a i
'\-- ,.Y r' ~'? t r / /i ,f lj%' tf ). /' ?'i ° v f ? ,!? .f i / ! '? J i' ---" ? j??i1 1 p •° + ,.. r, ?? ? / i? ? r -..
` k??--:,?,,•1• I' r ?f /? ?/P r ? S 7.I / t `1?! C 1k'+-?„ ?. I.t '/ t? !`? 1 ?r>??' r'?1 ?'_' r/i? ? {'? °dp .'
` 4° a ,? Is i it , i? ' .l?I I?r 4 ? ? (... v 1• ??? ??? { ., ?, t,._..,? / (,
,( ?.,`?I -fit } ?'+ a. `?''-lfl `? • ti :"=? + d? 71
1
/ ri _ } S I [ t R n,, i 5? `?. v? ?•,?? ??? j r ! i ,? J - Y t I :..._,? / t• ,?
T N ? 7 I
41?.0
211
^ x
1,4
y ;y 4
;n f p , } '? y:?'- ? .? „~` ''ar ,•??8? 289
?y •
•
/. r .?
y v _ ? ? r 1/ r _ ? ?«
?PYn9?rt (C)1897, Maptech. Inc. `
f;
? ?. .? ? ?.
??