Loading...
HomeMy WebLinkAbout20081615 Ver 5_CAMA Minor Mod Email_20200825Strickland, Bev From: Snider, Holley Sent: Tuesday, August 25, 2020 5:13 PM To: Coats, Heather Cc: Mairs, Robb L; King, Morella s (morella.sanchez-king@ncdenr.gov); Benson, Tyler G Subject: RE: [External] Topsail Beach Minor Mod Good afternoon Heather, The DWR has reviewed the proposal by TI Coastal to modify the existing permit to complete the construction of the Town of Topsail Beach's renourishment project (DWR20081615) this winter utilizing dredged spoil material from Banks Channel located within the project limits for the Town of Surf City renourishment project (DWR20052016 v1 & v2). The proposed beach fill placement and dredged footprint are consistent with the two(2) previous permit authorizations. Therefore, the DWR will not require written approval for the one-time utilization of the dredged spoil material from Banks Channel (within the limits of the Town of Surf City project) to complete the Topsail Beach project. However, if it is the desire of the Town of Topsail Beach to utilize the spoil material within the limits of the Surf City project for future events, the DWR would recommend that Topsail Beach modify their existing permit to include these areas. Please feel free to call or email me if you have any questions or I may be of assistance to you in any way. Sincerely, Holley Snider .., ,��((((°>•... ..><((((°>. Environmental Specialist II Division of Water Resources North Carolina Department of Environmental Quality Phone: (910) 796-7304 1lpparjmrnt{ of �n�nronmpiisl gciallYy 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties From: Mairs, Robb L Sent: Wednesday, August 5, 2020 4:17 PM To: Snider, Holley <holley.snider@ncdenr.gov> Subject: FW: [External] Topsail Beach Minor Mod Fyi From: Coats, Heather Sent: Wednesday, August 5, 2020 4:13 PM To: Hair, Sarah E CIV CESAW CESAD (US) <Sarah.E.Hair@usace.army.mil>; Mairs, Robb L <robb.mairs@ncdenr.gov>; Dunn, Maria T. <maria.dunn@ncwildlife.org>; Deaton, Anne <anne.deaton@ncdenr.gov>; Harding, Kimberlee k <Kimberlee.Harding@ncdenr.gov> Cc: Dail, Jason <lason.dail@ncdenr.gov>; MacPherson, Tara <tara.macpherson@ncdenr.gov>; Howell, Jonathan <ionathan.howeII@ncdenr.gov> Subject: FW: [External] Topsail Beach Minor Mod Hello everyone, I hope you made it through the storm okay. I'm thankful it's past us and at least moved through fairly quickly. Please see the attached request for the Town of Topsail Beach to conduct additional dredging with associated beach nourishment this upcoming winter. Dredging will primarily be a continuation of the last project, although they are requesting to extend the distal dredging limits within Banks Channel north from Station 210+00 to 245+00, as was authorized for the Town of Surf City's project. Channel dimensions would remain at 200' in width and at a proposed dredge depth of -10' MLW +2' overdredge allowance. Other dredging to be completed includes Banks Channel from Station 24+00 (north to 245+00), Topsail Creek, the Cut Through Channel and Banks Side Channel 2. The total dredge volume is calculated to be approximately 900,000 cubic yards of sand. Approximately 900,000 cubic yards of sand remains within the proposed dredge template if excavated to permitted depths, with an additional 630,000 cubic yards +/- of volume within the overdredge depth template. Beach fill would primarily consist of beach berm fill only to an elevation of +5' NAVD 88, with a small section of dune construction proposed at the southern end of the project south of Drum Street, starting at Station 17+50 and tying into the dune constructed in last year's project. The new dune would be constructed with a 25' dune crest with a 5:1 slope on the waterward side of the dune and a 3:1 slope on the landward side. Note that while this maintains the "trough" or "valley" in between the existing frontal dune and the proposed "starter dune", the applicant's engineer has acknowledged the concerns that were raised with the previous dune construction, but has asked further consideration of the planned design pending the outcome of this turtle season, should no adverse impacts to turtle nesting be documented as a result of the last project. The ACE's AID# is SAW-2013-00404. DWR's project number is #2008 1615. Please review the attached request and let me know if you have any questions, comments or concerns by August 26. Hard copies are also available and can be sent upon request. Thanks, Heather Heather Coats Beach & Inlet Management Project Coordinator Division of Coastal Management North Carolina Department of Environmental Quality 910 796 7302 office heather. coats(cDncdenr.gov 127 Cardinal Drive Extension Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Jamie Pratt [mailto:lcpratt@ticoastal.com] Sent: Tuesday, July 14, 2020 4:20 PM To: Chris Gibson <clgibson@ticoastal.com> Cc: Coats, Heather <heather.coats@ncdenr.gov> Subject: Re: [External] Topsail Minor Mod ternal email. Do not click links or open attachments unless u verify. Send sDicenim Pmafl aq an attar ment Hey Heather - Attached is the compiled minor mod request, including the updated plans and extra geotech information for the northern section of Banks Channel, from 210+00 to 245+00. I'm headed to the office this evening to print the hard copies --I'll go ahead and do 5 full sets including the cover letter, updated plans, geotech. Its not a lot more to print and bind those extra sheets. I can deliver them tomorrow morning, along with the check. Thanks! Jamie On Tue, Jul 14, 2020 at 1:14 PM Chris Gibson <clgibson o,ticoastal.com> wrote: Thanks Heather, Just an FYI on the potential issues. 1. We already have a clause in the contracts about permit compliance and dredging depth in particular. There is no pay for dredging before permitted depth. 2. On the the dune template. Jean Beasley and I have been keeping in touch all summer. All of the nests in TB have been on the front slope or top flat of the new dune.