Loading...
HomeMy WebLinkAboutWQ0037665_Sanitary Sewer Design Calculations_20200715SANITARY SEWER DESIGN CALCULATIONS Us/py91�9%; SEAL = 034014 — STOCKBRIDGE AT TANGLEWOOD ELIZABETH CITY, NORTH CAROLINA SEPTEMBER 10, 2014 PREPARED FOR: H S B, LLC LAND PLANNING SOLUTIONS 5857 HARBOUR VIEW BLVD. STE. 202 SUFFOLK VA. 23435-2657 0 757.935.9014 F 757.935.9015 5857 Harbour View Boulevard, Suite 202 Suffolk, Virginia 23435 0. 757.935.9014 E 757.935.9015 www.landplanningsolutions.com STOCKBRIDGE AT TANGLEWOOD Elizabeth City, North Carolina Phase II - Sanitary Sewer Design March 18, 2015 SANITARY NARRATIVE Project Description Heamdon Stockbridge Builders (HSB), LLC (formerly SAT-DEV, LLC) is developing a 46.98 acres that is located on the eastern part of the Tanglewood property. The proposed project, Stockbridge at Tanglewood (SAT) Phase I1 is a 129 lot single-family residential subdivision (R-8 zoned). The SAT site is currently a farm field with no improvements with phase I partially developed. The sanitary sewer flows from Phase II of this development will be collected via new 8" gravity mains to the existing Pump Station developed in phase I located within the development. Proiected Sanitary Sewer Flows The ultimate flows used for the design of the SAT pump station are based on the proposed uses in the development and the Daily Flow For Design values provided in 15A NCAC 2T .0114. See summary below: Average Flow Average Daily Design Flow for Pump Station Unit Quantity per unit (GPD) Flow (GPD) Stockbridge Commercial Acres 40 1,000 40,000 Stockbridge Multi -Family (2 Bdrm) Units 180 240 43,200 Stockbridge Subdivision (3 Bdrm) Lots 425 360 153,000 Total 236,200 The initial flows used for the design of the SAT pump station and for the State Sewer Permit are based on the proposed uses in Phase I as shown below: Stockbridge at Tanglewood PHASE I September 10, 2014 Stockbridge Commercial Acres 10 1,000 10,000 Stockbridge Multi -Family (2 Bdrm) Units 0 240 0 Stockbridge Subdivision (3 Bdrm) Lots 118 360 42,480 Total 52,480 Phase II will add 129 residential lots and increase the flow to the pump station by 32.25 gpm on average. PHASE II Stockbridge Subdivision 3 Bdrm Lots 129 360 46,440 Total 46,440