Loading...
HomeMy WebLinkAbout20020334 Ver 2_Certification of Completion_20100409Gahagan & Bryant Associates of NC, PLLC 295-A North Green Meadows Drive Dutch Square Industrial Park Wilmington, NC 28405-3933 (910) 313-3338 Fax (910) 313-6822 info 9 gba-inc.com CxBA ENGINEERS * SURVEYORS April 7, 2010 VIA: FEDERAL EXPRESS k US APR 0 9 2010 401 Oversight/Express Permitting Unit DEW - WATER QUALITY N.C. Department of Water Quality WETLANDS AND STORM.ATER BRANCH 1650 Mail Service Center Raleigh, NC 27699-1650 Subject: Project Name: Hampstead Marina Maintenance Project DWG Project No.: 02 0334 V2 To Whom It May Concern: Enclosed please find the fully executed Certification of Completion for the above- referenced project. Should you have any questions or concerns, please do not hesitate to contact our office. Sincerely, ?' a_ Chris L. Gibson, PE Vice President CLG/mhi Enclosure - Original Certification of Completion TAMPA, FL HOUSTON, TX LOS ANGELES, CA NOVATO, CA PHILADELPHIA, PA BALTIMORE, MD WILMINGTON, DE (813) 831-4408 (832) 518-2112 (310) 521-8127 (415) 883-7683 (215) 425-6283 (410) 682-5595 (302) 652-4948 Certification of Completion DWQ Project No.: 02. Y 7i County: (Oo n? Applicant: Ak-)n Lj 2 UGut'-P/1 ??dl L-L Project Name: G?MbS)'e?iA k6rCl. AlA'n? 46At.a Pr???Pr-F Date of Issuance of Wetland Permit: w, y 2? OV 9 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification 1, H. A l lic1 V V o -kn , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporti g materials. Signature: Date: ?- Q ZO Agent's Certification ( I i??Il PAS i„r© 69 A If /V& ??4ereby state that, to the best of my abilities, d4RRr@a#d Ulgence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the apc}v??ons and other supporting materia ' Signature: Date: L'ZO)o 41? 4 1 If this project was designed by a Certified Professional lG. as a duly registered Professional (lVkAeb i.e., Engineer; Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Perrnittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial com nce and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, 4fiq otl?upporting erials. Signature: Registration No. 0, 61-7 3 Date v