Loading...
HomeMy WebLinkAboutNCC190661_NOT Closeout Documents_20201027North Carolina Department of Environmental Quality Land Resources: 127 Cardinal Drive Extension, Wilmington, NC 28405 (910) 796-7215 County: New Hanover Project: NCSPA 2019 Raise Line over the Cape River basin: Cape Fear Person financially responsible. DUKE ENERGY PROGRESS LLC - Thomas C Project #: NEWHA-2019-026 Williams, Manager of Transmission Engineering Address: 410 S. Wilmington Street, Raleigh, NC 27601 I. Project Location: Watercraft Ferry & Clarendon, Wilmington, Pictures: No Town Creek 2. Weather and soil conditions: 70s rain Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the;ite in compliance with the NPDES Permit? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed. I0. Comments: File closed. Reported by: Brian Lambe Date of inspection: May 19, 2020 cc: Title: Date given/sent: May 19, 2020 Others present: Time arriving on site. 8.30 AM Time leaving site: 8:50 AM