HomeMy WebLinkAboutNCC190661_NOT Closeout Documents_20201027North Carolina Department of Environmental Quality
Land Resources: 127 Cardinal Drive Extension, Wilmington, NC 28405 (910) 796-7215
County: New Hanover Project: NCSPA 2019 Raise Line over the Cape River basin: Cape Fear
Person financially responsible. DUKE ENERGY PROGRESS LLC - Thomas C Project #: NEWHA-2019-026
Williams, Manager of Transmission Engineering
Address: 410 S. Wilmington Street, Raleigh, NC 27601
I. Project Location: Watercraft Ferry & Clarendon, Wilmington,
Pictures: No Town Creek
2. Weather and soil conditions: 70s rain Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the;ite in compliance with the NPDES Permit? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name):
Inspection report: Sent Report
9. Corrective action needed.
I0. Comments: File closed.
Reported by: Brian Lambe
Date of inspection: May 19, 2020
cc:
Title:
Date given/sent: May 19, 2020
Others present:
Time arriving on site. 8.30 AM Time leaving site: 8:50 AM