Loading...
HomeMy WebLinkAbout20091020 Ver 1_More Info Received_20100329Gyamfi, Joseph From: Chris Manes [chris.manes@wolverton-assoc.com] Sent: Monday, March 29, 2010 3:17 PM To: Gyamfi, Joseph; Barnett, Kevin Cc: Jeff Belyea Subject: RE: Marion Wal-Mart Additional Information Joseph, Attached to this email is a PDF of the revised sheets that we spoke of on the telephone. The PDF includes a revises sheet 3 out of the O&M agreement depicting the proper depth readings in the forebay and main pond. The other two sheets are the revised supplement form showing the temporary pool volumes only and correcting the pool elevations. If you need any additional information please feel free to give me a call. Thanks, Chris Manes, P.E., CPESC Site Department Wolverton & Associates, Inc. 6745 Sugarloaf Parkway Suite 100 Duluth, GA 30097 770-447-8999 phone 770-447-9070 fax chris. manes(cDwolverton-assoc. com www.wolverton-assoc.com From: Jeff Belyea Sent: Monday, March 29, 2010 1:59 PM To: Chris Manes Subject: FW: Marion Wal-Mart Additional Information Q@?r?od?p MAR ^ Q ?010 DEng- Wets ER Q M W YrE11<At?AMD?IRAgCN From: Gyamfi, Joseph [mailto:joseph.gyamfi@ncdenr.gov] Sent: Monday, March 29, 2010 1:06 PM To: Jeff Belyea Cc: Barnett, Kevin; Gyamfi, Joseph Subject: RE: Marion Wal-Mart Additional Information Hi Jeff, I have reviewed the information received on February 10, 2010. Here are the missing information: (1) Sections I and II of the Supplement Form; (2) Detailed percent impervious calculations of the drainage areas on the site; (3) Pond design/sizing information including surface area, average depth, temporary pool (water quality) volume required versus provided, drawdown time, sizing of the emergency spillway, etc. (4) Page 3 of the Operation & Maintenance agreement must be revised. Sediment shall be removed when the pool depth reads 9ft (in the main pool) and Oft (in the forebay). Please let us know when you can get the above information to us, else we must write a request for additional information so as to restart the clock from our end. We will need a hardcopy in the mail, but you can email me (and 1 copy Kevin) the requested information so I can continue with the review. Let me know if you have any questions. Thanks. Joseph From: Jeff Belyea [mailto:jeff.belyea@wolverton-assoc.com] Sent: Thursday, March 25, 2010 4:27 PM To: Gyamfi, Joseph Cc: Barnett, Kevin Subject: RE: Marion Wal-Mart Additional Information Joseph, Anything you can do to expedite this would be greatly appreciated. Thank you for your assistance. Jeff Belyea, P.E. Site Department Wolverton & Associates, Inc. 6745 Sugarloaf Parkway Suite 100 Duluth, GA 30097 770-447-8999 phone 770-447-9070 fax ieff. belvea()-wolverton-assoc. com www.wolverton-assoc.com From: Gyamfi, Joseph [mailto:joseph.gyamfi@ncdenr.gov] Sent: Thursday, March 25, 2010 4:24 PM To: Jeff Belyea Cc: Barnett, Kevin Subject: RE: Marion Wal-Mart Additional Information Jeff, I'll try and get the file so I can review the information we received recently. That way, we can all be assured that you have provided us with all the requested documents and so there's no additional information we may need. I'll put it on my calendar and take a look at it early next week. I hope this helps. Have a great day. Joe --------------------- --------------------- Joseph Gyamfi, P.E., P.Eng. Environmental Engineer NCDENR/DWQ 401/Express Permitting Unit 2321 Crabtree Blvd., Suite 250, Raleigh, NC 27604 Phone: (919) 715-3473 Fax: (919) 733-6893 Website: http://h2o.enr.state.nc.us/ncwetlands/index.htmi 2 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: How I will remediate the problem: The.embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 9 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 4 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Sediment Removal Bottom Permanent Pool Elevation 1408 1404 1 --------------- - FOREBAY Cft Min. Sediment Storage Pool ----- Sediment Removal Elevation 1399 ----------- Volum Bottom Elevation MAIN POND 1-ft Storage Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit No. (do be provided by DWQ) WDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be god out, prided and submited. The Requked Rems Chwdst (Pad fit) must be printed, fined out end submitted afong with a# of the requited h mtaNon. Project name ;,Grandview SlaWri Wth,Wal-Mart Supercenter#1 Contact person Bo Murphy' y Phone number Oy3?b4 7858^ ; 7777777 Date 1 11 91201 0 Drainage area number 1- fond 1 ?o? warE9 a Ste Characteristics Drainage area 1 8 f 9,937: }? Impervious area, post-development 1,019,740;f? % Impervious 56-03% Design rainfall depth 1.Oin Storage Volume: Non-SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5` runoff volume Pre-development 1-yr, 24-hr runoff Post-development 1-A 24-hr runoff Minimum volume requited Volume provided Peak Flow Calculations Is the preWpost control of the lyr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall Intensity: t-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pn:lPost 1-yr, 24-hr peals flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx, at the perm. pool elevation) Top of 10ft vegetated shelf elevation Bottom of 10ft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment deanout, bottom elevation Sediment storage provided Is there additional volume stored above the state-required temp. pool? Elevation of the top of the additional volume 84,064 fe OK 67 533a ga OK, volume provided is equal to or in excess of volume required. „fta fta y (Y or N) ':3'f in 0.35: (unitless) Q;67+ (unftless) 0;13'itllhr OK 11.84 folsec 5.34 ftalsec -6.50 felsec ' 140859` fmsl 140t1 fmsf 1392.00'1 tm? 1408'50' imel 1407.50 fins) Data not needed for calculation option #1, but OK I provided. -01*w 77, 1398.00;1msl Data not needed for calculation option #1, but OK I provided. 1.00 ft n (Y or N) fmsl Form SW401-Wat Detention Basin-Rev.8-9117= Parts L & It. Design Summary. Page 1 of 2 Permit No. (to be provided by AWC? Volumes Volume, temporary pool 87,633; ft OK Volume, permanent pool, V 214,051' ftg Volume, forebay (sum of forebays if more than one forebay) 44-" 335' ft' Forebay % of permanent pod volume 20.7% %s OK SAIDA Table Data Design TSS removal ?? ?s`t 90? % Coastal SAIDA Table Used? n (Y or N) Mountain/Piedmont SAIDA Table Used? y (Y or N) SAIDA ratio 259 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) (Y or N) Vol nie, permanent pod, V,,,_pm 214,057 fe Area provided, permanent pod, Ap,,,,,,w 49,419 fiz Average depth calculated 4.33' ft OK Average depth used in SAIDA, d., (Round to nearest 0.5ft) 0; it OK Calculation option 2 used? (See Figure 10-2b) J (Y or N) Area provided, permanent pod, A.„-,,a 49,419 fr Area, bottom of 10ftvegetated shelf, A%,w 41,744 ft Area, sediment deanout, top elevation (bottom of pond), A a j,,,w 7,904 f'lz 'Depth' (distance b/w bottom of 1 Oft shelf and top of sediment) 8.50 ft Average depth calculated it Average depth used In SAIDA, d,v, (Round to nearest 0.5ft) ; ft Drawdown Calculations Drawdown through orifice? y ,' (Y or N) Diameter of office (if circular) ^5.00' in Area of orifice (if-non-droular) km2 Coefficient of discharge (Co) A.6Y (unitless) Driving head (Hj 1.50! ft Drawdown through weir? n "(Y or N) Weir type (unittess) Coefficient of discharge (C„) - (unitless) Length of weir (L) ft Driving head (H) ft PreAevelopment 1-yr, 24-hr peak flow 11;84 felsec Post development 1-yr, 24-hr peak flow 534felsec Storage volume discharge rate (through discharge orifice or weir) 0,4B; fe/sec Storage volume drawdown time 2.00; days OK draws down In 2-5 days. Additional information Vegetated side slopes 3 A OK Vegetated shelf slope 10':1 OK Vegetated shelf width 10.0 ft OK Length of flowpath to width ratio 3 :1 OK Length to width ratio 4T:1 OK Trash rack for overflow & orifice? y s (Y or N) OK Freeboard provided 1Q:0:ft OK Vegetated filter provided? n (Y or N) OK Recorded drainage easement provided? X (Y or N) OK Capures all runoff at ultimate build-out? y (Y or N) OK Drain mechanism for maintenance or emergencies is: 6 In[ m drawdpwn pipe with' gate vi66. Form SW401-Wet Detention BasUrRev.8-9117109 Parts 1. & II. Design Sumn+ary, Page 2 &f2