Loading...
HomeMy WebLinkAboutNCC192770_Notice of Termination_20201021Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 10/21/2020 2:58:16 PM (NOT Submittal) Approve by Georgoulias, Bethany 10/21/2020 4:02:06 PM (NOT Request Review- NCC192770) • The task was assigned to Georgoulias, Bethany. The due date is: October 26, 2020 5:00 PM 10/21/2020 2:58 PM 1 � NORTH CAROLINA Enrlronmenral Quallly Certificate of NCC192770 Coverage (COC) Enter the Certificate of Coverage Nmber No.* Information associated with this permit Project Name Dollar General Asheboro Address US Hwy 220, Asheboro, NC County Randolph Latitude 35.7309 Longitude -79.8075 Permittee Listed Vanguard Ventures LLC Legally Responsible George Venters Individual NC Reference No. NCG01-2019-2770 E&SC Plan ID RANDO-2020-004 Original NOI 18396 Tracking No. Date COC Issued 11/19/2019 Prior Rescission Date populates only if OOCwas already rescinded at tirre of subaittal. Date Reason for Rescission/Termination Request: Reason for F Project Closed -Out Termination of r Sale (Another Owner/Operator will apply for a new COC) Coverage * O Mistake or Invalid Coverage r Other Addional We inforrration about the basis of this request, if needed. Explanation Supporting Upload Supporting Docurrentation if applicable. Documentation Mist beFDFforrrat Project Close-out Information: Final Close-out 10/14/2020 Inspection Approval Project Close-out 10.14.20 Asheboro Final EC Inspection.pdf 24.55KB Approval Mist be FDFforrrat Documentation North Carolina General Statute 143-215.66 (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules ofthe Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). 17 I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* George Venters Title * member/manager Organization* Vanguard Ventures Date * 10/21 /2020 Email for gventers@vanguardpg.com Confirmation * Contact Telephone* 919-459-2602 NOT Certification Asheboro NOT Form.pdf 29.57KB Form Mist be FDF Format Is this COC Already Ensure this CCChas not been rescinded since submttal! Rescinded? Original Permittee CCd on Wification Errails Email gventers@vanguardpg.com Original Site Contact CCd on Notificaiton Bmils Email adavis@vanguardpg.com