Loading...
HomeMy WebLinkAboutNCC192013_NOT Closeout Documents_20201021North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 County: Scotland Project: Laurinburg -Richmond 230KV-City of River basin: Lumber Person financially responsible: DUKE ENERGY PROGRESS LLC - Thomas C Project N: SCOTL-2020-003 Williams, Manager of Transmission Engineering Address: 410 S. Wilmington Street, Raleigh, NC 27601 1. Project Location: NC Hwy 43-Weyerhauser Road, Laurinburg Pictures: No 2. Weather and soil conditions: Clear Soil Workable 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: 6. Is the site in compliance with the NPDES Permit? Yes Describe: Initial inspection: No If no, check violations below: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Rick Saggo Inspection report: Sent Report 9. Corrective action needed: 10. Comments: In compliance and stable. Close Project. Reported by: Nicholas Mills Date of inspection: October 16, 2020 cc: Title: Site Supervisor Date given/sent: October 19, 2020 Others present: Time arriving on site: 1:00 PM Time leaving site: 1:30 PM