HomeMy WebLinkAboutNCC204725_ESC Approval Submitted_20201021ROY COOPER
Governor
MICHAELS. REGAN
-Sicrdory
S. DANIEL SMITH
Director
213 3 Garden View Lane
Matthews, North Carolina 28104
RRINUMM
afZ1TtT1T-T=V=7 1111
LETTER OF APPROVAL
W ... ;J A i I frb &I ILA W" 40 t-YWA * 4"-
RE: Project Name: Windsong Subdivision
Acres Approved: 18.24
Project ID: UNION-2020-047
County: Union
City- Indian Trail
Address: Fairview Road
River Basin: Yadkin-PeeDee
Stream Classification: Other
Submitted By: Wellspring Carolina Investments, LLC
Date Received by LQS -- December 27, 2019
Plan Type: New
This office has reviewed the subject erosion and sedimentation control plaa. We find the plan to be acceptable
with modifications and hereby issue this letter of Approval with Modifications and Performance Reservations.
The Modifications Required for Approval are, listed on the attached page. This plan approval shall expire three
(3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by
Title 15A NCAC 4B .0 129.
As of March 1, 2019, all new construction activities are required to complete and submit an electronic Notice
of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction
Stormwater General Permit. This form IIA41%
activity on the above named project. The NOI forrii may be accessed at deq.nc.gov/NCGO I. Please direct
questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at
Paul.clark@ncdenr.gov. After you submit a complete and correct N01 Form, a COC will be emailed to you
within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO I permit.
However, on or after May 1, 2019, a $100 fee will be charged annually, This fee is to be sent to the DEMLR
Stormwater Central Office staff in Raleigh.
Title 15A NCAC 4B .0 1 18(a) and the NCGO I permit require that the, following documentation be kept on file
at the job site: -
The approved E&SC plan as well as any approved deviation.
GAE2.1 North Carolina Department of Enviromqent4_qLialjt on -En 'li of, -ergy, Mineral and Land Resources
Mooresville Regional Office 1 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115
QP
7046631699
Letter of Approval with Modifications and Performance Reservations
Wellspring Carolina Investments, LLC
January 6, 2020
Page 2 of 3
Also, this letter gives the notice required by G. S. 113 A-6 1. 1 (a) of our right of periodic inspection to insure
compliance with the approved plan.
[ON'rIT.
7W tm "I i I C ''•01 M-- J TIM on,
natural resources and adjoining properties. If, following the commencement of this project, the erosion and
sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act
of 1973 (North Carolina General Statute I 13A-5 I through 66), this office may require revisions to the plan and
implementation of the revisions to insure compliance with the Act.
7 a I Ul UIES P-man7t;-VT
laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -
disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. In addition, it would be helpful if you notify this office of the proposed
starting date for this project. Please notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sin
Y, 4444
Christopher Graybeal
Assistant Regional Engineer
Land Quality Section
Modifications Required for Approval and Performance Reservations
NCGOI Fact Sheet
c: HensonFoley
Attention: Timothy D. Foley, PE
8712 Lindholm, Drive Suite 202A
Huntersville, North Carolina 28078
ur• '•.'�
Letter of Approval with Modifications and Performance Reservations
Wellspring Carolina Investments, LLC
January 6, 2020
Page 3 of 3
MODIFICATIONS AND PERFORMANCE RESERVATIONS
Project Name: Windsong Subdivision
Project ID- UNION-2020-047
County: Union
1. Additional measures may be required - The applicant is responsible for the control of sediment on -
site. If the approved erosion and sedimentation control measures prove insufficient, the applicant
must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC
4B .0 115]