HomeMy WebLinkAboutNCC190269_NOT Closeout Documents_20201021North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094
(910) 433-3300
FB-PAAF Shark Ramp Repairs PHS II
County: Cumberland Project:
Person financially responsible: US Army Public Works Department - Monica
Stephenson, Directorate
Address: 2175 Reilly Road, Stop A, Fort Bragg, NC
1. Project Location: Surveyor Street, Fort Bragg
Pictures: No
2. Weather and soil conditions: sunny/workable soils
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes
5. Violations:
6. Is the site in compliance with the NPDES Permit? Yes
Describe:
River basin: Cape Fear
Project #: CUNME-2019-120
Initial inspection: No
If no, check violations below:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): Larry D. Carter Title:
Inspection report: Sent Report Date given/sent: October 09, 2020
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance with the SPCA and
released. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities should be requested by the permittee via a Notice of Termination_
Please note that this correspondence must be uploaded as part of completing the Notice of
Termination process.
Reported by: Penny Markle Others present: Latanya Reed
Date of inspection: October 07, 2020 Time arriving on site: 12:49 PM Time leaving site: 12:55 PM
cc: