HomeMy WebLinkAboutNCS000335_06_2020 Org ChartORGANIZATION
The main office of responsibility for complying with the Seymour Johnson NPDES Permit NCS000335 requirements is the Civil Engineering Installation Management Flight. The base Storm
Water Manager is responsible for coordinating, implementing, and addressing all minimum measure goals.
4.1. Responsible Party Contact List: Provide a list or table of each measurable goal and the contact information for the person and/or position that are responsible for implementation
of each goal listed. Contact information for existing positions must include name, position, title and a contact phone and fax number.
The following table lists the contacts for SJAFB personnel who are responsible for the Storm Water Management Program goals include: a. Public Education and Outreach; b. Public Involvement
and Participation; c. Illicit Discharge and Elimination; d. Pollution Prevention and Good Housekeeping, e. Construction Site Runoff Controls, f. Post Construction Controls.
TABLE 4-1. CONTACT INFORMATION
Title/Unit
Phone/ Fax
Contact Person
E-mail
Minimum Measures
4 CES/CEIE, Storm Water Quality Program
722-5168/ 722-5179
Mr. Ronnie Wilson
ronnie.wilson@us.af.mil
1. Public Education & Outreach
2. Public Involvement & Participation
3. Illicit Discharge & Elimination
4. Pollution Prevention & Good Housekeeping
5. Construction Site Runoff Controls
6. Post Construction
4 CES/CEIE, Environmental Management Leader
722-5168/ 722-5179
Mr. Jeff D’Agostino
jeffrey.dagostino.1@us.af.mil
1. Public Education & Outreach
2. Public Involvement & Participation
3. Illicit Discharge & Elimination
4. Pollution Prevention & Good Housekeeping
5. Construction Site Runoff Controls
6. Post Construction Controls
4 CES/CEI, Installation Management Flight Chief
722-5168/ 722-5179
Ms. Jodi Fussell
jodi.fussell.1@us.af.mil
1. Public Education & Outreach
2. Public Involvement & Participation
3. Illicit Discharge & Elimination
4. Pollution Prevention & Good Housekeeping
5. Construction Site Runoff Controls
6. Post Construction Controls
4 CES/CEN, Engineering Flight Chief
722-5145
Mr. Brian Joyner
brian.joyner@us.af.mil
1. Construction Site Runoff Controls
2. Post Construction Controls
4 CES/CEOHE
HEAVY REPAIR
722- 5162
Mr. Paul Walker
paul.walker.11@us.af.mil
1. Construction Site Runoff Controls
2. Post Construction Controls
4 Med Group
722-1871
Mr. Michael Hartsfield
michael.e.hartsfield.civ@mail.mil
1. Post Construction Controls
4.2. Organizational Chart: Provide an organizational chart that shows where the responsible parties listed above fit into the structure of your organization.
Figure 4-1. CES Organizational Chart
4.3. Signing Official: A principal executive officer shall sign the application and permit application report; ranking elected official or duly authorized representative. Provide
the name, position and a brief explanation of why the signing official is the appropriate person to sign the permit application.
Mr. Dennis Goodson is the Deputy Base Civil Engineer for the 4th Fighter Wing, 4th Civil Engineering Squadron (CES). The Installation Civil Engineering Squadron (via 4 CES/CEI) has
overall responsibility of the installation’s environmental program (AFI 32-1067). 4 CES/CEI (Installation Management Flight) in CES is the installation commander’s organization for
ensuring the storm water program is in compliance with the base National Pollutant Discharge Permit (NPDES) NCS000335.
Air Force Instructions 32-1067 (pg10) instructs and directs the Office of Primary Responsibility (OPR) for the SWP document, applying for permits, ensuring compliance, and establishing
local procedures for the storm water program to be the Civil Engineering, Installation Management Flight (CEI).
5. CO-PERMITTING INFORMATION
An MS4 may work with another MS4 or group of MS4s to develop and implement the Phase II storm water program within their jurisdictional area. If subject MS4s are working jointly on
development and implementation of all required minimum measures, then those entities may apply for a single NPDES permit as co-permittees.
The Seymour Johnson AFB MS4 is working with the City of Goldsboro’s MS4 (Mr. Marty Anderson, 919-580-4377) and CWEP to ensure available public awareness information and public involvement
opportunities are provided to city and to base personnel.
6. RELIANCE ON OTHER GOVERNMENT ENTITY TO SATISFY ONE OR MORE PERMIT OBLIGATIONS
If you are relying on another government entity to satisfy one or more permit obligation and are not applying as co-permittees, provide the following information on each entity and the
permit obligation:
6.1. Name of the entity(s):
The NCDEQ Division of Energy, Mineral, and Land Resources, Erosion and Sediment Control Program
The City of Goldsboro and Clean Water Education Partnership
6.2. Measures Implemented:
Phase II Construction Minimum Measure: Sedimentation and Erosion Control are met via General Permit NCG010000 Requirements. This program includes state review of procedures for public
input, sanctions to ensure compliance, requirements for construction site operators to implement appropriate erosion and sediment control practices, review of site plans that incorporates
consideration of potential water quality impacts, and procedures for site inspections and enforcement of control measures.
Phase II Public Awareness and Outreach - City of Goldsboro is a member of the Clean Water Education Partnership (CWEP), which provides public awareness information and some public involvement
activities to members of Goldsboro including SJAFB. CWEP usually runs one television campaign per fiscal year, utilizing both network broadcast and cable television outlets. CWEP
shows its television spots in area cinemas as funding allows. CWEP typically develops and alternates two radio spots - one “action” spot and one “awareness” spot - for each radio campaign.
CWEP usually runs one radio campaign per fiscal year during the summer. CWEP also has a website that provides storm -water awareness information and videos (https://www.facebook.com/TJCOG/videos/1
662066950482225/) to educate citizens about protecting water quality in the Tar-Pamlico, Neuse and Cape Fear River Basins.
https://www.facebook.com/NCcleanwater
6.3. Contact Information for the Responsible Party:
Name - Dennis G. Goodson
Address - 1095 Peterson Ave, Seymour Johnson AFB NC 27531
Phone Number - (919) 722-5142