Loading...
HomeMy WebLinkAboutNCS000335_06_2020 Org ChartORGANIZATION The main office of responsibility for complying with the Seymour Johnson NPDES Permit NCS000335 requirements is the Civil Engineering Installation Management Flight. The base Storm Water Manager is responsible for coordinating, implementing, and addressing all minimum measure goals. 4.1. Responsible Party Contact List: Provide a list or table of each measurable goal and the contact information for the person and/or position that are responsible for implementation of each goal listed. Contact information for existing positions must include name, position, title and a contact phone and fax number. The following table lists the contacts for SJAFB personnel who are responsible for the Storm Water Management Program goals include: a. Public Education and Outreach; b. Public Involvement and Participation; c. Illicit Discharge and Elimination; d. Pollution Prevention and Good Housekeeping, e. Construction Site Runoff Controls, f. Post Construction Controls. TABLE 4-1. CONTACT INFORMATION  Title/Unit Phone/ Fax Contact Person E-mail Minimum Measures  4 CES/CEIE, Storm Water Quality Program 722-5168/ 722-5179 Mr. Ronnie Wilson ronnie.wilson@us.af.mil 1. Public Education & Outreach 2. Public Involvement & Participation 3. Illicit Discharge & Elimination 4. Pollution Prevention & Good Housekeeping 5. Construction Site Runoff Controls 6. Post Construction  4 CES/CEIE, Environmental Management Leader 722-5168/ 722-5179 Mr. Jeff D’Agostino jeffrey.dagostino.1@us.af.mil 1. Public Education & Outreach 2. Public Involvement & Participation 3. Illicit Discharge & Elimination 4. Pollution Prevention & Good Housekeeping 5. Construction Site Runoff Controls 6. Post Construction Controls  4 CES/CEI, Installation Management Flight Chief 722-5168/ 722-5179 Ms. Jodi Fussell jodi.fussell.1@us.af.mil 1. Public Education & Outreach 2. Public Involvement & Participation 3. Illicit Discharge & Elimination 4. Pollution Prevention & Good Housekeeping 5. Construction Site Runoff Controls 6. Post Construction Controls  4 CES/CEN, Engineering Flight Chief 722-5145 Mr. Brian Joyner brian.joyner@us.af.mil 1. Construction Site Runoff Controls 2. Post Construction Controls  4 CES/CEOHE HEAVY REPAIR 722- 5162 Mr. Paul Walker paul.walker.11@us.af.mil 1. Construction Site Runoff Controls 2. Post Construction Controls  4 Med Group 722-1871 Mr. Michael Hartsfield michael.e.hartsfield.civ@mail.mil 1. Post Construction Controls   4.2. Organizational Chart: Provide an organizational chart that shows where the responsible parties listed above fit into the structure of your organization. Figure 4-1. CES Organizational Chart  4.3. Signing Official: A principal executive officer shall sign the application and permit application report; ranking elected official or duly authorized representative. Provide the name, position and a brief explanation of why the signing official is the appropriate person to sign the permit application. Mr. Dennis Goodson is the Deputy Base Civil Engineer for the 4th Fighter Wing, 4th Civil Engineering Squadron (CES). The Installation Civil Engineering Squadron (via 4 CES/CEI) has overall responsibility of the installation’s environmental program (AFI 32-1067). 4 CES/CEI (Installation Management Flight) in CES is the installation commander’s organization for ensuring the storm water program is in compliance with the base National Pollutant Discharge Permit (NPDES) NCS000335. Air Force Instructions 32-1067 (pg10) instructs and directs the Office of Primary Responsibility (OPR) for the SWP document, applying for permits, ensuring compliance, and establishing local procedures for the storm water program to be the Civil Engineering, Installation Management Flight (CEI). 5. CO-PERMITTING INFORMATION An MS4 may work with another MS4 or group of MS4s to develop and implement the Phase II storm water program within their jurisdictional area. If subject MS4s are working jointly on development and implementation of all required minimum measures, then those entities may apply for a single NPDES permit as co-permittees. The Seymour Johnson AFB MS4 is working with the City of Goldsboro’s MS4 (Mr. Marty Anderson, 919-580-4377) and CWEP to ensure available public awareness information and public involvement opportunities are provided to city and to base personnel. 6. RELIANCE ON OTHER GOVERNMENT ENTITY TO SATISFY ONE OR MORE PERMIT OBLIGATIONS If you are relying on another government entity to satisfy one or more permit obligation and are not applying as co-permittees, provide the following information on each entity and the permit obligation: 6.1. Name of the entity(s): The NCDEQ Division of Energy, Mineral, and Land Resources, Erosion and Sediment Control Program The City of Goldsboro and Clean Water Education Partnership 6.2. Measures Implemented: Phase II Construction Minimum Measure: Sedimentation and Erosion Control are met via General Permit NCG010000 Requirements. This program includes state review of procedures for public input, sanctions to ensure compliance, requirements for construction site operators to implement appropriate erosion and sediment control practices, review of site plans that incorporates consideration of potential water quality impacts, and procedures for site inspections and enforcement of control measures. Phase II Public Awareness and Outreach - City of Goldsboro is a member of the Clean Water Education Partnership (CWEP), which provides public awareness information and some public involvement activities to members of Goldsboro including SJAFB. CWEP usually runs one television campaign per fiscal year, utilizing both network broadcast and cable television outlets. CWEP shows its television spots in area cinemas as funding allows. CWEP typically develops and alternates two radio spots - one “action” spot and one “awareness” spot - for each radio campaign. CWEP usually runs one radio campaign per fiscal year during the summer. CWEP also has a website that provides storm -water awareness information and videos (https://www.facebook.com/TJCOG/videos/1 662066950482225/) to educate citizens about protecting water quality in the Tar-Pamlico, Neuse and Cape Fear River Basins. https://www.facebook.com/NCcleanwater 6.3. Contact Information for the Responsible Party: Name - Dennis G. Goodson Address - 1095 Peterson Ave, Seymour Johnson AFB NC 27531 Phone Number - (919) 722-5142