Loading...
HomeMy WebLinkAbout20171158 Ver 1_Notice of Initial Credit Release_20201005Strickland, Bev From: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil> Sent: Monday, October 5, 2020 11:25 AM To: Wiesner, Paul; worth@restorationsystems.com; Reid, Matthew; Baumgartner, Tim; John Hamby Cc: Tugwell, Todd J CIV USARMY CESAW (US); Haywood, Casey M CIV (USA); Davis, Erin B; Wilson, Travis W.; Leslie, Andrea J; Bowers, Todd; Smith, Ronnie D CIV USARMY CESAW (USA); McLendon, C S CIV USARMY CESAW (USA); Jones, M Scott (Scott) CIV USARMY CESAW (USA) Subject: [External] Notice of Initial Credit Release/ NCDMS Warren Wilson College Site/ SAW-2017-01557/ Buncombe Co. Attachments: Warren Wilson College_100019_STR_FB 05_Initial Release.pdf Follow Up Flag: Follow up Flag Status: Completed External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to reoort.soam(cDnc.2ov Good morning The 15-Day Record Drawing and Mitigation Plan Addendum review for the Warren Wilson College Mitigation Site (SAW- 2017-01557) ended September 25, 2020. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review followed the streamlined review process. There were no objections to issuing the initial credit release and the revised assets have been approved at 10,050.933 cold SMUs. Please find attached the current signed ledger, and IRT comments below. DWR Comments. Erin Davis: 1. Thank you for providing the supplemental drone video. Before watching the video, I was going to request additional photo points at the crossings (particularly downstream of the culverts) and trail sections within the easements. Just a note on the video, I think it would be helpful to fly at a slightly slower pace to be able to fully take in stream features and surrounding landscape as part of the review. 2. 1 understand that nursery species availability was a challenge this year. DWR appreciates the note that an effort will be made to install the unplanted understory and shrub species onsite in the future. 3. When the IRT visited the site last November, we were concerned with proximity of the UT-1 channel to the "Pig Pond" and the current overflow setup. Have any actions been taken to minimize direct inputs from the pond to UT-1? EPA Comments, Todd Bowers: Thank you for the opportunity to provide feedback and comments on the Warren Wilson College stream mitigation site As-Built/MYO report provided by RS and Axiom Environmental. At this time, based on the provided report I have no comments or concerns that would prevent or rescind the release of credits (30%) for this project. I have noted the deviations from the approved mitigation plan and the adjusted amounts of stream credits due to those deviations; namely reductions due to crossing widths and conservation easement adjustments. As such the EPA Region 4 Oceans, Wetland and Streams Protection Branch approves the release of approximately 3,017 cold stream credits as an inclusion to the North Carolina Division of Mitigation Services In -lieu fee program. Thanks much, Kim Browning Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers Mitigation Project Name DMS ID River Basin Cataloging Unit County Warren Wilson College 100019 French Broad 06010105 Buncombe BROWN ING.KIMBERLY.DANIELLE.1527683510 USACE Action ID 2017-01557 DWR Permit 2017-1158 Date Project Instituted 5/22/2017 Stream/Wet. Service French Broad 06010105 Date Printed 10/1/2020 Digitally signed by BROWN ING.KIMBERLY.DANIELLE.1527683510 Date: 2020.10.05 11:02:35-04'00' Signature of Official Approving Credit Release 1 - For NCDMS, no credits are released during the first milestone 2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and posted to the NCDMS Portal, provided the following criteria have been met: 1) Approved of Final Mitigation Plan 2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property. 3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan. 4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required. 3 - A 10% reserve of credits is to be held back until the bankfull event performance standard has been met. Credit Release Milestone Cold Stream Credits Project Credits Scheduled Releases % Estimated Scheduled Release # Proposed Released # Not Approved #Releases Approved Credits Anticipated Release Year Actual Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 3,015.280 3,015.280 0.000 3,015.280 2019 10/1/2020 3 - Year 1 Monitoring 10.00% 1,005.093 2020 4 - Year 2 Monitoring 10.00% 1,005.093 2021 5 - Year 3 Monitoring 10.00% 1,005.093 2022 6 - Year 4 Monitoring 5.00% 502.547 2023 7 - Year 5 Monitoring 10.00% 1,005.093 2024 8 - Year 6 Monitoring 5.00% 502.547 2025 9 - Year 7 Monitoring 10.00% 1,005.093 2026 Stream Bankfull Standard 10.00% 1,005.093 2022 Totals 3,015.280 Total Gross Credits 10,050.933 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 3,015.280 Total Percentage Released 30.00% Remaining Unreleased Credits 7,035.653 Notes Contingencies (if any) Prniert nnantitiPc Mitigation Type Restoration Type Physical Quantity Cold Stream Restoration 9,220.000 Cold Stream Enhancement I 62.000 Cold Stream Enhancement II 1,974.000 Page 1 of 2 Mitigation Project Name DMS ID River Basin Cataloging Unit County Warren Wilson College 100019 French Broad 06010105 Buncombe USACE Action ID DWR Permit Date Project Instituted Stream/Wet. Service Date Printed 2017-01557 2017-1158 5/22/2017 French Broad 06010105 10/1/2020 Debits Cold Stream Restoration Credits Beginning Balance (mitigation credits) 10,050.933 Released Credits 3,015.280 Unrealized Credits 0.000 Converted Credits 0.000 Owning Program Req. Id TIP # Project Name USACE Permit # DWR Permit # DCM Permit # Remaining Balance (Released credits) 3,015.280 Remaining Balance (Unreleased credits) 7,035.653 Total Remaining Balance (Released and Unreleased credits) 10,050.933 Page 2 of 2