Loading...
HomeMy WebLinkAboutNCC192880_NOT Closeout Documents_20201019North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 Georgetown Estates - Ph Two Lots 61, County: Cumberland Project: 63, 64, 65, 66,73 & 145 River basin: Cape Fear Person financially responsible: Armstrong Builders, LLC - George H Armstrong, Project N: CUMBE-2020-062 President Address: 2709 Thorngrove Court, Suite 2, Fayetteville, NC 28303 1. Project Location: Bankswood Ct/Jacobs Creek Cir, Rockfish Pictures: No 2. Weather and soil conditions: Dry, workable soils 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: 6. Is the site in compliance with the NPDES Permit? Yes Describe: Initial inspection: No If no, check violations below: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No one Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: October 13, 2020 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance with the SPCA and released. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of Termination_ Please note that this correspondence must be uploaded as part of completing the Notice of Termination process. Reported by: Melissa Joyner Others present: Date of inspection: October 07, 2020 Time arriving on site: 2:05 PM Time leaving site: 2:15 PM cc: Mike Armstrong (via email)