Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8190401_CURRENT PERMIT_20200508
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 I50Y01 DOC TYPE CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE QC7Q005 pQ, YYYYMMDD Burd, Tina J From: Burd, Tina J Sent: Tuesday, May 12, 2020 12-00 PM To: 'Sterling Cheatham'; 'Amy Beatty'; 'jpuckett@stewartinc.com' Subject: SW8 190401 - North Waterfront Park Attachments: SW8 190401 - North Waterfront Park.pdf The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (Stormwater Section) completed their review of the Express Stormwater Permit Application for the subject project. Attached is the cover letter and permit issued on May 8, 2020 that will be mailed separately, along with any other supporting documents. Please direct any questions to your reviewer. DO NOT'WESPOND`'•TQ T IIS;IEMAIL Best Regards, Tina Burd 4. Administrative Associate II Wilmington Regional Office Division of Environmental Assistance & Customer Service Phone 910-796-7215 NCDEQ Wilmington Regional Office 127 Cardinal Drive Ext, Wilmington, NC 28405 Email correspondence to and from) this address is subject to the North Carolina Public Records Lair and may be disclosed to third pasties. ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Acting Director May 8, 2020 NORTH CAROLINA Enrtronmental Quality City of Wilmington Attn: Sterling Cheatham, City Manager PO Box 1810 Wilmington NC 28402 Subject: State Stormwater Management Permit No. SW8 190401 North Waterfront Park High Density Project New Hanover County Dear Mr. Cheatham: The Wilmington Regional Office received a complete, modified State Stormwater Management Permit Application for the subject project on May 7, 2020. Staff review of the plans and specifications has determined that the project, as proposed, complies with the Stormwater Regulations set forth in Title l 5A NCAC 02H.1000 amended on January 1, 2017 (2017 Rules). We are hereby forwarding modified Permit No. SW8 190401 dated May 8, 2020, for the construction of the built -upon areas (BUA) and stormwater control measures (SCMs) associated with the subject project. This permit shall be effective from the date of issuance until May 9, 2027 and the project shall be subject to the conditions and limitations as specified therein and does not supersede any other agency permit that may be required. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. Please refer to Attachment C for a detailed description of the current proposed major modification. This cover letter, attachments, and all documents on file with DEMLR shall be considered part of this permit and is herein incorporated by reference. Please replace the previously approved plan sheets with the attached modified and approved versions. Please replace the previous application (SWU-101) and .supplement with the attached modified versions. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions concerning this permit, please contact Christine Hall in the Wilmington Regional Office, at (910) 796-7215 or christine.hall@ncdenr.gov. Sincerely, Ail Brian Wrenn, Acting Director Division of Energy, Mineral and Land Resources lnclosures: Attachment A — Designer's Certification Form Attachment C — Permitting History Application Documents DI:S/canh: 111StormwaterlPermits & Projects120191190401 ].1D12020 05 permit 190401 cc: Natalie Carmen, Stewart. Inc; New Hanover County Building Safety Department Division of Coastal Management Wilmington Regional Office Stormwater File DE Q✓� North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources _ Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405 910.796.7215 State Stormwater Management Permit No. SW8 190401 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In compliance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations promulgated and adopted by the North Carolina Environmental Management Commission, including 15A NCAC 02H.1000 amended on January 1, 2017 (2017 Rules) (the "stormwater rules"), PERMISSION IS HEREBY GRANTED TO The City of Wilmington North Waterfront Park 10 Cowan Street, Wilmington, New Hanover County FOR THE construction, management, operation and maintenance of built -upon area (BUA) draining to two (2) infiltration trenches and five (5) areas of permeable pavement ("stormwater control measures" or "SCMs") as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until May 9, 2027 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. BUA REQUIREMENTS. The maximum amount of BUA allowed for the entire project is 92,028 square feet. The runoff from all BUA within the permitted drainage areas of this project must be directed into the permitted SCMs. The BUA requirements and allocations for this project are as follows: a. SCM BUA LIMITS, The SCMs labeled DA 1, DA 2, DA 3, DA 4, DA 5, DA 6, and DA 7 have been designed using the runoff treatment method to handle the runoff from 40,556, 6,637, 10,175. 8,186, 7,872, 11,988, and 6,614 square feet of BUA, respectively, within the delineated drainage areas. This permit does not provide any allocation of BUA for future development within the delineated drainage areas. b. CAMA AECs. Where a project or lot is located within CAMA's Area of Environmental Concern (AEC), the Division of Coastal Management (DCM) may calculate a different maximum BUA based on CAMA regulations. The more restrictive BUA limit will apply to the project. Page 1 of 5 State Stormwater Management Permit No. SW8 190401 2. PERVIOUS AREA IMPROVEMENTS. At this time, none of the pervious area improvements listed in G.S. 143-214.7(b2) or the Stormwater Design Manual have been proposed for this project. Pervious area improvements will be allowed in this project if documentation is provided demonstrating those improvements meet the requirements of the stormwater rule. 3. SCM REQUIREMENTS. The SCM requirements for this project are as follows: a. SCM DESIGN. The SCMs are permitted based on the design criteria presented in the sealed, signed and dated supplement and as shown in the approved plans and specifications. These SCMs must be provided and maintained at the design condition. b. PRETREATMENT. The following pretreatment device has been provided to prevent clogging in the infiltraion SCMs: sumps in catch basins. PERMEABLE PAVEMENT. The following considerations pertain to the proposed infiltrating permeable pavement: i. Except for the incidental, unavoidable runoff from the stable vegetated areas shown on the approved plans, runoff from adjacent pervious areas shall be prevented from reaching the permeable pavement. ii. It is recommended that during the installation of the permeable pavement, care is taken to avoid compaction of the underlying subgrade soils. To confirm compaction has not occurred, it is recommended that a direct measurement of the soil's infiltration rate be conducted after excavation and before the aggregate is placed. If the infiltration rate has diminished, it is recommended to scarify, rip, or trench the subgrade to restore the infiltration rate. iii. After installation, the permeable pavement shall be protected from sediment deposition until the site is completed and stabilized. iv. Concentrations of oils, grease, heavy metals, and toxic chemicals shall not be stored or handled where they may enter the permeable pavement. V. At no time shall the approved permeable pavement be paved over or repaired with any type of conventional paving material. 4. STORMWATER OUTLETS. The peak flow from the 10-year storm event shall not cause erosion downslope of the discharge point. 5. VEGETATED SETBACKS. A 50-foot wide vegetative setback must be provided and maintained in grass or other vegetation adjacent to all surface waters as shown on the approved plans. The setback is measured horizontally from the normal pool elevation of impounded structures, from the top of bank of each side of streams or rivers, and from the mean high waterline of tidal waters, perpendicular to the shoreline. a. BUA IN THE VEGETATED SETBACK. BUA may not be added to the vegetated setback except as shown on the approved plans. b. RELEASE OF STORMWATER NOT TREATED IN AN SCM. Stormwater that is not treated in an SCM must be released at the edge of the vegetated setback and allowed to flow through the setback as dispersed flow. 6. RECORDED DOCUMENT REQUIREMENTS. The stormwater rules require the following documents to be recorded with the Office of the Register of Deeds: a. ACCESS AND/OR EASEMENTS. The entire stormwater conveyance system, including any SCMs, and maintenance accesses must be located in public rights -of -way, dedicated common areas that extend to the nearest public right-of-way, and/or permanent recorded easements that extend to the nearest public right-of-way for the purpose of inspection, operation, maintenance, and repair. b. OPERATION AND MAINTENANCE AGREEMENT. The operation and maintenance agreement must be recorded with the Office of the Register of Deeds. c. FINAL PLATS. The final recorded plats_must reference the operation and maintenance agreement and must also show all public rights -of -way, dedicated common areas, and/or permanent drainage easements, in accordance with the approved plans. Page 2 of 5 State Stormwater Management Permit No. SW8 190401 d. DEEDS. The permittee shall incorporate specific restrictions and conditions into a facility management plan or another legal instrument in lieu of deed restrictions and protective covenants. 7, CONSTRUCTION. During construction, erosion shall be kept to a minimum and any eroded areas of the on -site stormwater system will be repaired immediately. a. UNDERGROUND SCMs. It is recommended that during the installation of the underground SCM, photos be taken documenting the construction and demonstrating that the constructed SCM meets the approved design, It is further recommended that these photos be submitted with the required Designer's Certification. b. PROJECT CONSTRUCTION, OPERATION AND MAINTENANCE. During construction, all operation and maintenance for the project shall follow the Erosion Control Plan requirements until the Sediment -Erosion Control devices are converted to SCMs or no longer needed. Once the device is converted to a SCM, the permittee shall provide and perform the operation and maintenance as outlined in the applicable section below. c. SCM RESTORATION. If one or more of the SCMs are used as an Erosion Control device and/or removed or destroyed during construction, it must be restored to the approved state stormwater design condition prior to close-out of the erosion control plan and/or project completion and/or transfer of the state stormwater permit. Upon restoration, a new or updated certification will be required for the SCM(s) and a copy must be submitted to the appropriate DEQ regional office. 8. MODIFICATIONS. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. c. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. 9. DESIGNER'S CERTIFICATION. Upon completion of the project, the permittee shall determine if the project is in compliance with the approved plans and take the necessary following actions: a. If the permittee determines that the project is in compliance with the approved plans, then within 45 days of completion, the permittee shall submit to the Division one hard copy and one electronic copy of the following: i. The completed and signed Designer's Certification provided in Attachment A noting any deviations from the approved plans and specifications. Deviations may require approval from the Division, ii. A copy of the recorded operation and maintenance agreement; iii. Unless already provided, a copy of the recorded deed restrictions and protective covenants; and iv. A copy of the recorded plat delineating the public rights -of -way, dedicated common areas and/or permanent recorded easements, when applicable. b. If the permittee determines that the project is not in compliance with the approved plans, the permittee shall submit an application to modify the permit within 30 days of completion of the project or provide a plan of action, with a timeline, to bring the site into compliance. Page 3 of 5 State Stormwater Management Permit No. SW8 190401 10. OPERATION AND MAINTENANCE. The permittee shall provide and perform the operation and maintenance necessary, as listed in the signed operation and maintenance agreement, to assure that all components of the permitted on -site stormwater system are maintained at the approved design condition. The approved operation and maintenance agreement must be followed in its entirety and maintenance must occur at the scheduled intervals. a. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by the Division and the stormwater rules such as the construction of additional or replacement on - site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction, b. MAINTENANCE RECORDS. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. The records will indicate the date, activity, name of person performing the work and what actions were taken. 11. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(3). 12. CURRENT PERMITTEE NAME OR ADDRESS CHANGES. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one or more of the following changes: a. A name change of the current permittee; b. A name change of the project; c. A mailing address change of the permittee. 13. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2) and must be submitted upon occurrence of any one or more of the following events: i. The sale or conveyance of the project and/or property area in whole or in part; ii. Dissolution of the partnership, corporate, or LLC entity, subject to NCGS 55-14-05 or NCGS 57D-6-07 and 08; iii. Bankruptcy; iv. Foreclosure, subject to the requirements of Session Law 2013-121; b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 14. COMPLIANCE. The permittee is responsible for complying with the terms and conditions of this permit and the approved plans and specifications until the Division approves the transfer request. a. REVIEWING AND MONITORING FOR COMPLIANCE. The permittee is responsible for verifying that the proposed BUA within each drainage area and for the entire project does not exceed the maximum amount allowed by this permit. The permittee shall review and routinely monitor the project to ensure continued compliance with the conditions of the permit, the approved plans and specifications. b. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. c. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. Page 4 of 5 State Stormwater Management Permit No. SW8 190401 d. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. OTHER PERMITS. The issuance of this permit does not preclude the permittee from obtaining and complying with any and all other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which are imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Permit modified and reissued this the 8`h day of May 2020. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION C"V",� vt Brian Wrenn, Acting Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW8 190401 Page 5 of 5 State Stormwater Management Permit No SW8 190401 Attachment A Certification Forms The following blank Designer Certification forms are included and specific for this project: • As -Built Permittee Certification • As -Built Designer's Certification General MDC • As -Built Designer's Certification for Infiltration Project • As -Built Designer's Certification for Permeable Pavement Project A separate certification is required for each SCM. These blank certification forms may be copied and used, as needed, for each SCM and/or as a partial certification to address a section or phase of the project. Page 1 of 1 State Stormwater Management Permit No. SW8 190401 AS -BUILT PERMITTEE CERTIFICATION I hereby state that I am the current permittee for the project named above, and I certify by my signature below, that the project meets the below listed Final Submittal Requirements found in NCAC 02H.1042(4) and the terms, conditions and provisions listed in the permit documents, plans and specifications on file with or provided to the Division. Check here if this is a partial certification. Section/phase/SCM #? Check here if this is part of a Fast Track As -built Package Submittal. Printed Name County of personally appeared before me this Signature a Notary Public in the State of do hereby certify that day of and acknowledge the due execution of this as -built certification. (SEAL) Witness my hand and official seal My commission expires 20 Permittee's Certification NCAC .1042(4) Completed / Provided NIA A. DEED RESTRICTIONS 1 BUA RECORDS 1. The deed restrictions and protective covenants have been recorded Y or N and contain the necessary language to ensure that the project is maintained consistent with the stormwater regulations and with the permit conditions. 2. A copy of the recorded deed restrictions and protective covenants Y or N has been provided to the Division. 3. Records which track the BUA on each lot are being kept. (See Note Y or N 1 B. MAINTENANCE ACCESS 1. The SCMs are accessible for inspection, maintenance and repair. Y or N 2. The access is a minimum of 10 feet wide. Y or N 3. The access extends to the nearest public right-of-way. Y or N C. EASEMENTS 1. The SCMs and the components of the runoff collection 1 conveyance Y N system are located in recorded drainage easements. or 2. A copy of the recorded plat(s) is provided. Y or N D. SINGLE FAMILY RESIDENTIAL LOTS - Plats for residential lots that Y N have an SCM include the following: or 1. The specific location of the SCM on the lot. Y or N 2. A typical detail for the SCM. Y or N 3. A note that the SCM is required to meet stormwater regulations and that the lot owner is subject to enforcement action as set forth in Y N NCGS 143 Article 21 if the SCM is removed, relocated or altered or without prior approval. E. OPERATION AND MAINTENANCE AGREEMENT Y or N 1. The O&M Agreement is referenced on the final recorded plat. Y or N 2. The O&M Agreement is recorded with the Register of Deeds and Y N appears in the chain of title. or F. OPERATION AND MAINTENANCE PLAN — maintenance records are being kept in a known set location for each SCM and are available for Y or N review. G. DESIGNER'S CERTIFICATION FORM — has been provided to the Y N Division. or Page 1 of 8 State Stormwater Management Permit No. SW8 190401 Note 1- Acceptable records include ARC approvals, as -built surveys, and county tax records. Provide an explanation for every requirement that was not met, and for every "NIA" below. Attach additional sheets as needed. Page 2 of 8 State Stormwater Management Permit No. SW8 190401 AS -BUILT DESIGNER'S CERTIFICATION GENERAL MDC hereby state that I am a licensed professional and I certify by my signature and seal below, that I have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets the below listed General MDC found in NCAC 02H.1050 in accordance with the permit documents, plans and specifications on file with or provided to the Division, except as noted on the "AS -BUILT" drawings, such that the intent of the stormwater rules and statutes has been preserved. Check here if this is a partial certification. Section/phase/SCM #? Check here if this is a part of a Fast -Track As -Built Package Submittal per .1044(3). Check here if the designer did not observe the construction, but is certifying the project. Check here if pictures of the SCM are provided. Printed Name NC Registration Number Date SEAL: Signature Consultant's Mailing Address: City/State/Z1P Phone Number Consultant's Email address: O Circle N if the as -built value differs from the Plan. If N is circled, provide an explanation on Page 2. OO N/E = not evaluated (provide explanation on page 2) 3N/A = not applicable to this SCM or project. Consultant's Certification NCAC .1003((3) & General MDC OAs-built ON/E WA .1050 A. TREATMENT REQUIREMENTS 1. The SCM achieves runoff treatment. Y or N 2, The SCM achieves runoff volume match. Y or N 3. Runoff from offsite areas and/or existing BUA is Y or N bypassed. 4. Runoff from offsite areas and/or existing BUA is directed Y or N into the permitted SCM and is accounted for at the full build -out potential. 5. The project controls runoff through an offsite permitted Y or N SCM that meets the requirements of the MDC. 6. The net area of new BUA increase for an existing project Y or N has been accounted for at the appropriate design storm level. 7. The SCM(s) meets all the specific minimum design Y or N criteria. B. VEGETATED SETBACKS / BUA 1. The width of the vegetated setback has been measured Y or N from the normal pool of impounded waters, the MHW line of tidal waters, or the top of bank of each side of rivers or streams. 2. The vegetated setback is maintained in grass or other Y or N vegetation. 3. BUA that meets the requirements of NCGS 143-214.7 Y or N b2 2 is located in the setback. Page 3 of 8 State Stormwater Management Permit No. SW8 190401 4. BUA that does not meet the requirements of NCGS 143- Y or N 214.7 (b2)(2) is located within the setback and is limited to: a. Publicly funded linear projects (road, greenway sidewalk) b. Water -dependent structures c. Minimal footprint uses (utility poles, signs, security lighting and appurtenances) 5. Stormwater that is not treated in an SCM is released at Y or N the edge of the setback and allowed to flow through the setback as dispersed flow. UO As -built. ©NIE ©NIA C. STORMWATER OUTLETS — the outlet handles the peak Y N flow from the 10 year storm with no downslo a erosion. or D. VARIATIONS 1. A variation (alternative) from the Stormwater rule Y N provisions has been implemented. or 2. The variation provides equal or better stormwater control Y N and equal or better protection of surface waters. or E. COMPLIANCE WITH OTHER REGULATORY PROGRAMS Y N has been met. or F. SIZING -the volume of the SCM takes the runoff from all surfaces into account and is sufficient to handle the required Y or N storm depth. G. CONTAMINATED SOILS — infiltrating SCM's are not Y or N located in or on areas with contaminated soils. H. SIDE SLOPES 1. Vegetated side slopes are no steeper than 3H;1 V. Y or N 2. Side slopes include retaining walls, gabion walls, or Y or N other surfaces that are steeper than 3H:1 V. 3. Vegetated side slopes are steeper than 3H:1 V (provide Y or N supporting documents for soils and vegetation). I. EROSION PROTECTION 1. The inlets do not cause erosion in the SCM. Y or N 2. The outlet does not cause erosion downslope of the Y or N discharge point during the peak flow from the 10 year storm. J. EXCESS FLOWS — An overflow 1 bypass has been Y N provided. or K. DEWATERING — A method to drawdown standing water has Y or N been provided to facilitate maintenance and inspection. L. CLEANOUT AFTER CONSTRUCTION — the SCM has been Y or N cleaned out and converted to its approved design state. M. MAINTENANCE ACCESS 1. The SCM is accessible for maintenance and repair. Y or N 2. The access does not include lateral or incline slopes Y or N >3:1. N. DESIGNER QUALIFICATIONS (FAST -TRACK PERMIT) — The designer is licensed under Chapters 89A, 89C, 89E, or Y or N 89F of the General Statutes. Provide an explanation for every MDC that was not met, and for every item marked "N/A" or "NIE", below. Attach additional pages as needed: Page 4 of 8 State Stormwater Management Permit No SW8 190401 AS -BUILT DESIGNER'S CERTIFICATION FOR INFILTRATION PROJECT hereby state that I am a licensed professional and I certify by my signature and seal below, that have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets all of the MDC found in NCAC 02H.1051 in accordance with the permit documents, plans and specifications on file with or provided to the Division, except as noted on the "AS -BUILT" drawings, such that the intent of the stormwater rules and the general statutes has been preserved. Check here if this is a partial certification. Sectionlphase/SCM #? Check here if this is a part of a Fast -Track As -Built Package Submittal per .1044(4). Check here if the Designer did not observe the construction, but is certifying the project. Check here if pictures of the SCM are provided. Printed Name Signature NC Registration Number Date SEAL: Consultant's Mailing Address: CitylStatelZIP Phone Number Consultant's Email address: O Circle N if the as -built value differs from the Plan. If N is circled, provide an explanation on Page 2. ©NIE = not evaluated (provide explanation on page 2) ONIA = not applicable to this project or SCM This Certification must be completed in conjunction with the General MDC certification under NCAC 02H.1050 Consultant's Certification (MDC .1051) OAs-built ®NIE ©NIA A. inlets 1 Pretreatment 1 Design Depths 1 Elevations 1. Inlets are located per the approved plans. Y or N 2. Pretreatment measures are provided? (Rooftop runoff Y N does not require re -treatment. or 3. BASIN only — the area and depth of the basin is consistent f with the approved plans J 4. TRENCH only- the provided width, length and height of the trench are consistent with the approved plan. 5. TRENCH only- the provided length and size of the perforated pipe is consistent with the approved plan. 6. The bottom elevation of the basin / trench is consistent with the approved plans. 7. The bypass elevation is consistent with the approved plan. 8. The overflow elevation is consistent with the approved Ian. B. Soils 1 SHWT 1 Subgrade 1. The hydraulic properties of the insitu soils are in Y N accordance with the soils report. or 2. The lowest point of the infiltration system is a minimum of Y N 2 feet above the SHWT. or 3. If separation to the SHWT is less than 1 foot, the water Y N table draws down to its re -storm level within 72 hours. or 4. The slope of the soil subgrade is <= 2%. Y or N C. Drawdown Time Page 5 of 8 State Stormwater Management Permit No. SW8 190401 1. The system dewaters within 72 hours? Y or N 2. The Insitu soils were removed and replaced with suitable Y N infiltration media to achieve the 72 hour drawdown. or (DAs-built ONIE OO NIA D. Observation Port — for underground systems, a minimum of Y one inspection port has been provided. or N Provide an explanation for every MDC that was not met, and for every item marked "N/A" or "WE", below. Attach additional pages as needed: Page 6 of 8 State Stormwater Management Permit No. SW8 190401 AS -BUILT DESIGNER'S CERTIFICATION FOR PERMEABLE PAVEMENT PROJECT I hereby state that I am a licensed professional and I certify by my signature and seal below, that I have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets all of the MDC found in NCAC 02H.1055 in accordance with the permit documents, plans and specifications on file with or provided to the Division, except as noted on the "AS -BUILT" drawings, such that the intent of the stormwater rules and the general statutes has been preserved. Check here if this is a partial certification. Section/phase/SCM #? Check here if this is a part of a Fast -Track As -Built Package Submittal per .1044(4). Check here if the Designer did not observe the construction, but is certifying the project. Check here if pictures of the SCM are provided. Printed Name Signature NC Registration Number SEAL: Date Consultant's Mailing Address: City/State/ZIP Phone Number Consultant's Email address O Circle N if the as -built value differs from the Plan. If N is circled, provide an explanation on Page 2. ON/E = not evaluated (provide explanation on page 2) ON/A = not applicable to this project or SCM This Certification must be completed in conjunction with the General MDC certification under NCAC 02H.1050 Consultant's Certification (MDC .1055) OAs-built ON/E ON/A A. DESIGN / DRAWDOWN 1. Washed aggregate base material has been used. Y or N 2. The provided amount of permeable pavement surface area Y N is consistent with the approved plans. or 3. The amount of non -roof adjacent built -upon area is consistent with the approved plans and is directed onto the Y N permeable pavement surface and does not exceed the or required 1:1 ratio AaIA . 4. The runoff from adjacent pervious areas is prevented from reaching the permeable pavement except for incidental, Y or N unavoidable runoff from stable vegetated areas. 5. The permeable pavement infiltrates the design volume to the Y N bottom of the subgrade within 72 hours. or 6. If the permeable pavement was installed as a detention system, the drawdown assembly releases the stormwater Y or N stored in the aggregate in 2-5 da s. B. SOILS 1 SHWT 1 SUBGRADE 1. The hydraulic properties and characteristics of the in -situ Y N soils conform to the soils report. or 2. For infiltrating permeable pavement, the lowest point of the Y N system is a minimum of 2 feet above the SHWT. or 3. For infiltrating permeable pavement, if the lowest point of the system is less than 2 feet above the SHWT, the soils have Y or N been modified to assure drawdown within 72 hours. Page 7 of 8 State Stormwater Management Permit No. SW8 190401 4. The in -situ soils have been removed and replaced with Y N infiltration media in accordance with the approved plan. or 5. Infiltration media has been placed on top of in -situ soils. Y or N OAs-built ©NIE ONIA C. CONSTRUCTION 1. At least one capped observation well has been provided at Y N the low point of each permeable pavement area? or 2. The subgrade is terraced in accordance with the approved plans and has at least one capped observation well within Y or N each terrace section. 3. For PICP and concrete grid pavers, an edge restraint has been used around the perimeter of the permeable Y or N pavement, 4. The subgrade for infiltrating permeable pavement was Y N graded when it was dry and there was no precipitation. or D. CERTIFICATION 1. The infiltration rate of the pavement surface is at least 50 inches per hour using a head less than or equal to four Y or N inches. 2. After installation, the permeable pavement was protected Y N from sediment deposition. or 3. The site is complete and stabilized. Y or N Provide an explanation for every MDC that was not met, or for every item marked "NIE" or "NIA", below. Attach additional pages as needed: Page 8 of 8 Attachment C - Permitting History North Waterfront Park Permit No, SW8190401 ApprovalPermit Action Velrsiort Description of the Changes Modified Plart Sheets 51912014 On6nnal I D High density development with 2 infiltration trenches and 5 areas of permeable pavement subject to the Approval 2017 Rules Overall, the both DA and BUA to the SCMs are increasing within the Original project boundary. Site layout changes include revising the alignment of Nutt Street (previously Old Front Street) and the grading to allow the reduction of permeable pavement along Nutt Street to avoid it extending beyond the parking spaces. These changes result in the following impacts to the SCMs: DA I / infiltration trench A - increasing both the drainage area (DA) and built -upon area (BUA) to the SCM. The trench length in increasing to handle the additional runoff DA 5 / permeable pavement East A - decreasing both the DA and BUA to the SCM. The permeable pavement area and provided storage volume are both decreasing_ Cover, C-001-PI, C-10D-Pf, C- 5/8/2020 Major 1.1 DA 6 / permeable pavement East B - increasing both the DA and the BUA to the SCM. The 101-YI, C-i 31-P1 - C-139-PI, C- Modification permeable pavement area and provided storage volume are both increasing. 530-P I, C-531-PI. L-131-PI , L- DA 7 ! permeable pavement West - decreasing both the DA and BUA to the SCM. The permeable 63D-PI, pavement area and provided storage volume are both decreasing. Additionally, a phased construction plan is included f'or the Nutt Street Promenade and Alleys to allow an interim condition consisting of a 15' wide asphalt walkway and 5' wide concrete sidewalk to be constructed in Feu of the final design that would have been damaged during the constnuction of the adjacent undeveloped but soon to be developed parcels. Once construction on the adjacent parcels is complete, the final design will be installed. Page 1 of 1 DEMLR USE ONLY Date Peceived Fee raid Permit Number dvaU # 3 L� 7. 00 St-618' i 0 4 0 Applicable Rul s: ❑ Coastal SW - 1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resourcesv° STORMWATER MANAGEMENT PERMIT APPLICATION FORM APR 0 a '2u20 ' This form may be photocopier) for tcse as an original r=, Y I. GENERAL INFORMATION 1, Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): North Waterfront Park 2. Location of Project (street address): 10 Cowan Street City:Wilmington County:New Hanover Zip:28403 3. Directions to project (from nearest major intersection): 250 LF north west from intersection of N 3,d STreet and N Front Street. 4. Latitude:34° 14' 50.7264" N Longitude:77° 56' 59.4924 " W of the main entrance to the project. 11. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ❑New ®Modification ❑ Renewal w/ Modificationt tRenezoals with niodifications also requires SWU-102 - Renezi}aI Application Forni b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit numberSW8190401 , its issue date (if known)5/9/19 , and the status of construction: ❑Not Started ®Partially Completed* ❑ Completed* *provide a designer's certification Specify the type of project (check one): ❑Low Density ®High Density []Drains to an Offsite Stormwater System ❑Other If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ®CAMA Major ®Sedimentation/Erosion Control: 7.33 ac of Disturbed Area ❑NPDES Industrial Stormwater 0404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/ Permit Number, issue date and the type of each permit:Cama Major: #70-19, Sediment/ Erosion Control #newha. 2019-020 5. Is the project located within 5 miles of a public airport? ❑No ®Yes If ties, see S.L. 2012-200, Part VI: lltt �:II }ort �1.ricilf tir.i>r'iLtel�llrirulrs-tnci-re��tlit.io37s Form SWU-104 Version Oct. 31, 2013 Paee I of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization;City_ of Wilmington Signing Official & Title:Sterlin Cheatham Ci Manager b. Contact information for person listed in item la above: Street Address:102 N. 3rd Street City:Wilmington State:NC Zip:28401 Mailing Address (if applicable):PO Box 1810 City:Wilmington State:NC Zip:28402 Phone: (910 3417810 Fax: Email:sterling.cheatham@wilmin tg onnc.gov Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (`Phis is the person who owns the property that the project is Iocated on): Property Owner/Organization: Signing Official & Title: b.Contact information for person listed in item 2a above: Street Address: City: Mailing Address (if applicable): City: Phone: f Email: State: Zi State: Zip: Fax: a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/ Organization:City of Wilmington Signing Official & Title:Amy Beatty, Community Services Direction b.Contact information for person listed in item 3a above: Mailing Address:PQ Box 1810 City:Wilmington r State:NC Zip:28402 Phone: (910 ) 3415838 Fax: ( ) Email :amy.beattvQwilmin tonnc.goV T 4. Local jurisdiction for building permits: New Hanover County Point of ContacLHans Schult Phone #: 910 798-7008 M 1= e*% w— a v L'--. %�V %...: M All 112420 Form SWU-101 Version Oct. 31, 2013 Page 2 of 7 BY:. IV, PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. The addition of concert venue with associated site ammenites. They included walk paths, -a water feature, concession stand, and other various elements. Nutt Street will also be extended from Harnett St. to 2. a. if claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b. If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW - 1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Cape Fear River basin. 4. Total Property Area: 6.43 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area:.08 acres Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area':6.35 acres Total project area shall be calculated to exclude the follozoin the normal pool of impounded stnictures, the area between the banks of streams and rivers, the area below the Normal High Water (NHVo litre or Mean High Water (MHV,� litre, and coastal wetlands landward from the NHW (or MHO) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 27 % 9. How many drainage areas does the project have?7 (For high density, count 1 for each proposed engineered stornavater BMP. For low density and other projects, use I for the uohole property area) 1.0. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area 2 Drainage Area 3 Drainage Area 4 Receiving Stream Name Cape Fear Cape Fear Cape Fear Cape Fear Stream Class SC:Sw SC:Sw SC:Sw SC:Sw Stream Index Number * 18-74-(61) 18-74-(61) 18-74-(61) 18-74-(61) Total Drainage Area (so 124629 6637 10344 8354 On -site Drainage Area (so 124629 6637 10344 8354 Off -site Drainage Area (so 0 0 0 0 Proposed Impervious Area** (sf) 40556 6637 10175 8186 Impervious Area** (total) 33 100 98 97 Impervious- Surface Area Drainage Area 1 Drainage Area 2 Drainage Area 3 Drainage Area 4 On -site Buildings/Lots (so 10967 On -site Streets (so 4119 6637 On -site Parking (so On -site Sidewalks (so 25470 2962 2336 Other on -site (so 7213 5850 Future (so Off -site (so Existing BUA*** (so Total (so: 40556 6637 10175 8186 Stream Class and Index Number can be determined at: httn:/Jt�nrtaf.nc::Ienr.:�r�Tfc>� h t� rt/t s csir/cl issiticr Boris Itn rui.ous area is defined as the btalt upo2r area including, but not limited to, buildings, roads, pwkrrrg areas„ ��# �� sic ezt�alks, graztel areas, etc.,, E I '�i E APR 0 6 2020 Form SWU-101 Version Oct. 31, 2013 Page 3 of 7 nu Basin Information Drainage Area 5 Drainage Area 6 Drainage Area 7 Receiving Stream Name Cape Fear Cape Fear Cape Fear Stream Class SC; Sw SC; Sw SC; Sw Sream Index Number 18-74-(61) 8-74 1 -74- 1 Total Drainage Area (sf) 7872 j 12356 7074 On -site Drainage Area (sf) 7872 12356 7074 Off -site Drainage Area (sf) 0 0 0 Proposed Impervious Area (sf) 7872 11988 6614 % Impervious Area (total) 100% 97% 93% Impervious Surface Area Drainage Area 5 Drainage Area 6 Drainage Area 7 On -site Buildings/ Lots (sf) 0 0 0 On -site Streets (sf) 3938 0 0 On -site Parking(alley) (sf) 0 0 On -site sidewalks (sf) 0 0 Other on -site (sf) 3934 11988 6614 Future (sf) 0 0 Off -site (sf) 0 0 0 Existing BUA (sf) D 0 0 Total (sf) 7872 11988 6614 APR Q a 2020 3• "Report only that amount of existing BUA that will remain after developrnent. Do not report arty existing BUA that is to be removed and which will be replaced by nezv BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. N/A Prolects in Union Countv: Contact DEMLR Central OfJice staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per 15A NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http.//pc>rtal.nccier7r,org/weblwcl/sys/sulbn�-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http:l /L)ortal..nccienr.or�,,/web/vvq/vvs/st€/sttitesiAlfor-ms flocs. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map at http//portal.ncdennorg�/web/wg/ivs/su/ma sus.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from litty://poi-talnctierir.org/-,v(!b/wvq/%vs/su/states,.v/foriiis docs. Initials 1. Original and one copy of the Stormwater Management Permit Application Form. Z. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part V1I below) 3. Original of the applicable Supplement Form(s) (sealed sianed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to hft:Z/www.envhelp.org/ pages/ onestopexpress.htm] for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/ management for the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations (one copy). 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g, Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/ project boundary with bearings & distances. . E C il' I �A E', j. Site Layout with all BUA identified and dimensioned. 1C tC '�7 k. Existing contours, proposed contours, spot elevations, finished floor elevations. i 1. Details of roads, drainage features, collection systems, and stormwater control measures. APR 0 6 2020 l B Form SWU-101 Version Oct. 31. 2013 Page 4 of 7 {i m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x11" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DEMLR to verifij the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: Page No: _ 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 2H.1.003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. hnl /www.secretarv.state.nc.us/CorRo—rations/CSearch.aVx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, Iot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from httE)://porta1.ncdenr.org/web/ir/state- stormwater-forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineeraoe Puckett Consulting Firm: Stewart, Inc _ Mailing Address:23 S. West Street Suite 1100 City:Raleigh _ _ State:NC Zip:27603 Phone: (919 } 3808750 Fax: 919 380-8752 Email: uckett©stewartinc.com 1X. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type narne of person listed in Contact Information, item 2a) , certify that I own the property identified in this permit application, and thus give permission to (print or hjpe nafne of person listed in Contact hiformation, itein 1a) _ with (print or type name of organization listed in Contact Information, item 1n) to develop the project as currently proposed.i op'yroff the lease agreement or pending property sales contract has been provided with the submitta , whrcli indicates the party responsible for the operation and maintenance of the stormwater system. H APR 0 6 L'020 Forrn SWt_1-101 Version Oct, 31, 2013 Page 5 of 7 S`f: -- . ___ As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: 1, a Notary Public for the State of do hereby certify that before me this _ day of Date: County of personally appeared and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires ECEF E ' a APR 0 6 2020 � f Form SWU-101 Version Oct. 31, 2013 Page 6 of 7 X. APPLICANT'S CERTIFICATION 1, (print or hjpe narne of person Iisted in Contact Information, item 1a) Sterling Cheathanz certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 2H .1000 and any other applicable state stormwater requirements. Signature Date: /�(GG✓ 4; R 'T I_ �a I, Ch U-iS l ,'14 IP,�Ffbvi a Notary Public for the State of Nl rik 6U 0(1'A&, County of L;t)9LAiic do hereby certify that _s�` -� � i '�., '�T �s-. personally appeared before me thisiR V day of Ad QX t� and R-knowledge the due execution�pf the application for a stormwater permit. Witness my hand and official seal, r �- N SEAL ,Vly commission expires7� r� ECEIVE .APR 0 6 2020 BY:.--------,--___ Form SWU-101 Version Oct. 31, 2013 Page 7 of 7 Operation & Maintenance Agreement Project Name: Project Location: NORTH WATERFRONT PARK Sw9117 4-0( WILMINGTON NC , _ Cover Page Maintenance records shall be kept on the following BMP(s). This maintenance record shall be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced immediately, These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s). The BMP(s) on this project include (check all that apply & cc Bioretention Cell Quantity: Dry Detention Basin Quantity: Grassed Swale Quantity: Green Roof Quantity: Infiltration Basin Quantity: Infiltration Trench Quantity: Level SpreaderNFS Quantity: Permeable Pavement Quantity: Proprietary System Quantity: Rainwater Harvesting Quantity: Sand Filter Quantity: Stormwater Wetland Quantity: Wet Detention Basin Quantity: Disconnected Impervious Area Present: User Defined BMP Present: ding O&M tables wil Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): De aaaea aurom IX = 2316927.1728 Y = 182903.0959 1 IX = 2317029.9838 Y = 182676.1778 1 acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each BMP above, and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any changes to the system or responsible party. Signature: ` Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): Email: Sterling Cheatham City Manager, City of Wilmington PO Box 1810 Wilmington, NC 28402 910.341.7810 sterling.cheatham@wilmingtonnc.gov Date: 3 a Notary Public for the State of Ajr44• f��/,,,a County of ru�►S. far_ do hearby certify that 4, 1 mA S CAaa, 4on, personally appeared before me this day of J' 4" and acknowledge the due execution of the Operations and Maintenance Agreement . `� V,11)1 f;, Witneshongben/d/official seal, Q7A - o3,j1"!_'C APOI- ti , ; . u Version 1.4 My commission expires y' 7 - 2o/q 3/29/201 Page 1 of Infiltration System Maintenance Requirements Important maintenance procedures'. - The drainage area will be carefully managed to reduce The sediment load to The infiltration basin. Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. - The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it shall be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance shall be kept in a known set location and shall be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How to remediate the problem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then plant a infiltration basin erosive gullies have formed. ground cover and water until it is established. Provide lime and a one- time fertilizer application. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the sediment off -site. swale applicable). The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to smooth it over and provide erosion swale (if applicable). control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated Search for the source of the sediment and remedy the problem if and reduced the depth to 75% possible. Remove the sediment and dispose of it in a location where it of the original design depth. will not cause impacts to streams or the BMP. Erosion has occurred or Provide additional erosion protection such as reinforced turf matting or riprap is displaced. riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than spraying. The main treatment area A visible layer of sediment Search for the source of the sediment and remedy the problem if has accumulated. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Water is standing more than Replace the top few inches of Biter media and see if this corrects the 5 days after a storm event, standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Weeds and noxious plants Remove the plants by hand or by wiping them with pesticide (do not are growing in the main spray). treatment area. The embankment Shrubs or trees have started Remove shrubs or trees immediately. _ to grow on the embankment. An annual inspection by an Make all needed repairs. A-K, U 1 e.. appropriate professional shows that the embankment needs repair. _ The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. STORM-EZ 3t29/201 c Version 1 A O&M Manual Page 3 of The receiving water Erosion or other signs of Contact the local NC Department of Environment and Natural damage have occurred at the Resources Regional Office. outlet, i5 3 1 2V.v STORM-EZ 3/29/2019 Version 1,4 O&M Manual Page 4 of 5 Permeable Pavement Maintenance Requirements At all times, the pavement shall be kept free of: Debris and particulate matter through frequent blowing that removes such debris, particularly during the fall and spring. - Piles of soil, sand, mulch, building materials or other materials that could deposit particulates on the pavement. - Piles of snow and ice. - Chemicals of all kinds, including deicers. The permeable pavement will be inspected once a quarter. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How to remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to remove the gully, then plant ground permeable pavement erosive gullies cover and water until established. A vegetated area drains Regrade the area so that it drains away from the pavement, then plant toward the pavement. ground cover and water until established. The inlet device The pipe is clogged. Unclog the pipe. Dispose of the sediment off -site. The pipe is cracked or Replace the pipe, otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to smooth it over and provide erosion swale. control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and replace with clean stone. covered in sediment (if applicable). The surface of the Trash/debris present Remove the trash/debris. permeable pavement Weeds Do not pull the weeds (may pull out media as well). Spray them with a systemic herbicide such as glyphosate and then return within the wee to remove them by hand. (Another option is to pour boiling water on them or steam them.) Sediment Vacuum sweep the pavement. Rutting, cracking or slumping Consult an appropriate professional. or damaged structure Observation well Water present more than five Clean out clogged underdrain pipes. Consult an appropriate days after a storm event professional for clogged soil subgrade. Educational sign Missing or is damaged. Replace the sign. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Department of Environment and Natural damage have occurred at the Resources Regional Office. outlet. AFF 0 1 r] . STORM-EZ 3/29/2019 Version 1.4 O&M Manual Page 5 of 5 k SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION � --- - T--��- 1 Project Name NORTH WATERFRONT PARK i 2 Project Area ac 7�33� � -- 3 Coastal Wetland Area (ac) 0 4 Surface Water Area (ac) 0 5 Is this project High or Low Density? _ - _.._.__.__.._.._._ _._----......___._-------..____- _ High _-------._-_- 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) �� T 7_ Width of vegetated setbacks provided (feet)_ - — -_ - -_ -�- -NIA 8 Will the vegetated setback remain vegetated? Yes 9 Is_B_UA_other that as listed in_.10_03(4)(c-d) out of the setb_ack?_ _ No 10 Is streambank stabilization proposed on this project? - Yes NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention-Cell -_ --- -�- 13 Wet Pond _14 Stormwater Wetland -- - 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting (RWH) 18 Green Roof 19 Level Spreader -Filter Strip (LS-FS) 20 Disconnected Impervious .._.....--__.._._._.._..._..__._.. _ ous Surface (DIS) 21 Treatment Swale 22 Dry Pond 23 iStormFilter 24 Sllva- 25 8ayiilter 26 Filterra FORMS LOADED (DESIGNER CERTIFICATION 27 e and Title: 26 Organization: 29 Street address: 30 City, State, Zip: 31 Phone number(s): _..... -.... ...... 32 Email: Natalie Carmen PE, Project Enc Stewart 223 S_West St, Suite 1100 Raleigh, NC, 27603 _ _919 380 8750 ncarmen@stewartinc.com neer Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. CtA04 '� ? Quo SEAL 9� 9 049487 1 C lE 8. 11'ptf I I I 1V1A�� Seal ignatu4 oflDesigner Date D.S' . 0(Q. 2,0 2,o EGEN . MAY 0 7 IL020 DRAINAGE AREAS Is this a high density project? Yes If so, number of drainage areas/SCMs 7 Is all/part of this project subject to previous rule 1'..-.3--.--versions? No FORMS L0AUFQ DRAINAGE AREA INFORMATION Entire Site IType of SCM 5 IT-o-t-a-1- BUA- i.n---p-. --fe-""�- -roc -t.-(. _q '-New BUA on subdivided lots (subject to 6 permitting) (sq ft) New 66A outside of subdivided lots (subject to 7 permitting) (sf) Offsite - total area (sq ft) dffi�ite- BUA (s-q" 10 Breakdown of new B'U"A' outside subdivided lots: Parking (sq ft) Sidewalk (sq ft) _-.Roof (sq ft) Roadwa- y.(sq ft) Future (sq ft Other, please specify in the comment box below (sq ft) — - New infiltrating ----- p per meable epavement ---'----. - - on 11 subdivided lots (sq New infiltrating permeable pavement outside of 12 subdivided lots (sq ft) isiting BUA that will remain (not subject to --1-3- permitting)(sq ft) 14 Existing B U A t"h' -a i -is'-'already'-'--- - permitted---,--'- ,-- (sq- -ft)- 15 Existing BUA that will be removed (sq ft) Percent ,-, --BUA 17 Design storm (inches) 11_8� Calculation De _ sign volume of SCM (cu ft) P I 9L CalZul� -1-9- Ca1 -c u- 1--a flib*n—method-for desig n-volume'-- ____._ __ ADDITIONAL INFORMATION I Please use this space to provide any additional information about the -20_ _ drainage area(s): The "other" proposed impervious refers to proposed permeable pavement 1 2 3 4 5 PERMEABLE PERMEABLE PERMEABLE INFILTRATION INFILTRATION PAVEMENT PAVEMENT PAVEMENT SYSTEM A SYSTEM C A B EAST A 40556 sf 6637 sf 10175 sf 8186 sf 7872 sf 40556 sf 1 6637 sf 1 10175 sf 1 8186 sf 1 7872 sf 25470 sf 2962 sf 2336 sf 10967 sf 4119 sf 6637 sf 3938 sf 7213 sf 5850 sf 3934 sf sf 3934 sf 33% 1.5 100% 1.5 98% 1.5 97% 1.5 873 cf I 100% 1.5 840 cf 1609 cf 708 cf 1085 cf NRCS NRCS NRCS NRCS MAY 0 7 DRAINAGE AREAS 1 is this a high density- project? Yes I 2 If so, number of drainage areas/SCMs 7 Is all/part of this project subject to previous rule 3 versions? No FORIVIS LOADED DRAINAGE AREA INFORMATION Entire Site 6 7 PERMEABLE PERMEABLE PAVEMENT PAVEMENT 4 .Type of SCM EAST B WEST --__-___-14_-sf..__._._.__. __. �_- �'otal BUA m protectft) 11988 sf 8- -sf 66 -5 _(sq New BUA on subdivided lots (subject to 6 perTittin s New BUA outside of subdivided lots (subject to 7 ipermitting) (sf) 11988 sf 6614 sf 8 }Offsite total area (sq f-0 9 Offsite BUA (sq ft) 10 Breakdown of new BUA outside subdivided lots: - Sidewalk (sq ft)- --- ------- - -- - l - Roof (sq ft) Roadway (sq ft) _._._. _.... - Future (sq ft) _ - - Other, please specify in the comment box (- below (sq ft) 11988 sf 6614 sf New infiltrating permeable pavement on 11 subdivided lots (sq ft) New infiltrating permeable pavement outside of 12 jsubdivided lots (sq ft) 11988 sf 6614 sf Exisitng BUA that w0l remain (not subject to 13 permitting) (sq ft) 14 Existing BUA that is already permitted (sq ft) 15 Existing BUA that will be removed (sq ft) 16 Percent BUA 17 Design storm (inches) 1 5 _._.__._.... 1 .5 18 jDesi�n volume of SCM (cu ft)- 1279 cf 706 cf - 19 Calculation method for design volume NRCS NRCS ADDITIONAL INFORMATION Please use this space to provide any additional information about the 20 ;drainage area(s)- The "other" proposed impervious refers to proposed permeable pavement R ,�,yy� �p { INFILTRATION SYSTEM 1 Drainage area number 2 Design volume of SCM (cu ft) GENERAL MDC FROM 02H .1050 3 Is the SCM size _4 is the 5CM lo_c 5 What are the si Does the SCM -6 - -AT e,the inlets, c 7 storm)? 8 Is there an ove g WWhat is the me 10 !f applicable, wi 11 Does the maint 12� Does the-draini If the SCM is a 13 (10)? s there an 0&1 _14_ 15 s The re_an O&I lb 16 oes the SCM 17 j Was the SCM c 2 _ cf 70$ cf d to treat the SW from all surfaces at build -out? ated .-...-•-----------._--..--------------___ away from contaminated soils? YES Yes de slopes of the SCM H:V ? NIA N/A lave retaining walls, gabion walls or other engineered side slopes? NO NO utlets, and receiving stream protected from erosion (10-year YES YES flow or bypass for in_flow_volume in excess of the design volume_? — -_ --YES YES__ Pump (preferred) _ Pump (preferred) hod for de_wat_ering the_SCM for maintenance? —_ —_ Yes Yes it the_SCM be cleaned out after construction?- _- anance access comply with General M_DG (8)? - _ Yes- _ - -- �— ige easement comply with General_MDC (9)? Yes Yes i a single family lot, does (will?) the plat comply with General MDC 1 Agreement that complies with General MDC (11)? — - -- Yes - - Yes I Plan that complies with General MDC (12)? Yes Yes 'ollow the device specific MDC? Yes Yes esigned by an NC licensed professional? Yes Yes 18 Proposed slope of the subgrade surface (%) - 19 Are terraces or baffles provided? 20 Type of pretreatment: Soils Data ---.._-_ _--__._-_.-._ __- 0% 0% No No -- ----------- ---_ �r -- Other__ ---- Other :Was - the soil investigated in the footprint and at the elevation of the infiltration ?1 system? Yes Yes 2 SHWT elevation (fmsl} 2.00 -2.00 ?3 Depth to SHWT per soils report (in) -- - - -- - -_ - - - ------ ---- 12_5.16 - - 70.08 _ ?4 Ground elevation at boring in soils report (fmsl) --� _-2--- )5 12.43 - 7.84 !s a detailed hydrogeologic study attached if the separation is between 1 and - --- �- feet? Yes Yes ?6 Soil infiltration rate (in/hr) 2.00 2.00 ?7 Factor of safety (IFS) (2 is recommended): 10.00 8.00 Elevations _ _ _ 29 Bottom elevation (fmsl) 5 ft 5 ft — . _. -- 30 Storage elevation (fmsl) 6.18 ft 7.26 ft 8ypass elevation- '� 32 Bottom surface area, ft2. - _ _-_-__.___.___-_._..----....-.._- 33 Storage elevation surface area (ft) For Trenches Only ---34 35 36 37 Elevations _ _ _ 29 Bottom elevation (fmsl) 5 ft 5 ft — . _. -- 30 Storage elevation (fmsl) 6.18 ft 7.26 ft 8ypass elevation- '� 32 Bottom surface area, ft2. - _ _-_-__.___.___-_._..----....-.._- 33 Storage elevation surface area (ft) For Trenches Only ---34 35 36 37 Length (ft)---- - ------�- — -� Width (ft) _ _ _ _ _ _ _ Perfo_rated pipe -diameter, if applicable Number of late rals $2.67 - 17.72 �- 41, 34 ---_ 11 81 - 38 _ 39 __ -••-•- 40 41 42 43 Total length of perforated piping_ -------------- - ----- --- Stone type, if applicable -.- -- __--T_-..— --------- ----- - ..__. -- _.. - - -- -- --- - - -- - - - -_ ----- Stone void ratio (%) Is stone free of fines? !s the stone wrapped in geotextile fabric? Has at least one infiltration port been provided? - - � -- -----------_-_ -- 95% 95% Yes Yes Yes Yes Yes Yes votumesiurawaow_n 45 Time to dravvdawn (h (c) ft) —� 1609 cf _ 708 cf 44 Desi n volume of- 66 hrs 4DDITIONAL INFORMATION Please use this space to provide any additional information about the infiltration 46_ Please The infiltration systems will be R-Tanks by ACF. These systems will replace the typical stone filled area in an infiltration trench. This allows for greater void ration and ultimately a smaller footprint Infiltration 4 9:20 AM 5/6/2020 L P VE MAY 0 7 PERMEABLE PAVEMENT 1 Drainage area number Design volume - of - SCM - c - u . ft) -A_r65_0_f permeable pavement to be inst Aic;a_ .of S61,6e�iied .- roof runoff that is dir Area of _a_da7 E64-il-built-upon area rung 5 feet) Area of incidental, unavoiclable runoff fr square feet) ailed (square feet) 1085 cf 873 cf _5 cf 7 706 cf 7213 sf 5850 sf 3934 sf 11988 sf 6614 sf acted to pavement (square feet) that is directed to pavement (square 2962 sf 2336 sf 3938 sf 0,00 0.00 orn adjacent stable pervious areas 169 sf 168 sf 0,00 368 sf 460 sf 7 Is the SCIVI sized to treat the SW from ail surfaces at build -out? 8 is ff�6_ETM_1_o_c_afe_d a"w-a-y--fro-r-n--c-on-t-,a--m- _in_a__t_e,_d_,__so_i_1s_T Does the _ SCMF have retaining walls, gabion walls or other engineered side 6 slopes? - k,e,_1_he__in_1e_t_"s_, o-u-11--e-t,-s-,-a--n'-d-r-ec-e-iv-i--ng-,"-s-t-r-e-a--m--pr-ot-e-c-te-d-fr-o-m---e-r,-o--si-o-n-(I--O-,y-e--a 7 storm)? Is there an overflow or bypass for inflow volume in excess of the design 8 volume? 9 at is the method for dewatering the SCIVI for maintenance? 10 a wl cleaned out after construction? Does oes I; j 11 f�� lz��a�F T nerai lwy(fo) 1 Do es oes the drainage easement comply with General IVIDC (9)? lftfie SCIVI is on a single family lot, does (will?) the plat comply with Gener 13 IVIDC (10)? 14 '�fs 0h6re an-O-&-M-A--g-r"e-e'-m--e-n-t--tha—t c_o_mp'_1i_e_s_with General -M'--DC-(-l--l-)?--'------ is there an O&M Plan that complies with General IVIDC (12)? -161 Does 'the "-§ff Vi_oi 16%W'i specific MDC? ------ 17 e an NC licensed professional? PAVEMENT IVIDC FROM 02H.1055 Yes Yes Yes Yes Yes Yes Yes No No No No No r Yes Yes Yes Yes Yes No No No No No No No No No No Yes mm Yes Yes Yes Yes Yes Yes Yes Yes Yes al Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes—- Yes Yes Yes Yes 1-8 Is this a detention or infiltration permeable pavement system? Infiltration Infiltration Infiltration Infiltration Infiltration 19 Proposed slope _o_fthe _subgrade surface- _2b' Ar e- terraces or r baffles --- provided? No No No N . o No 21 ion 3,00 —9- 3.00 3.00 3.00 100 -22 9-1-o-ra-g-e- 61 elevation n__ o_flt6-e-ae--s'ign rainfall---d-e- -1)----- --8- 2 --8.-29 8.29 8.29 8.29 W[JI toxic pollutants be stored or handled on or near the permeable 23 pavement? No No No No No Does the proposed pavement surface comply with .1055(6)? Yes___ Yes Yes--.---. Yes . ......... Yes _-24 25 Will -runoff -from _pervious surfaces be directed away from the pavement? Yes Yes Yes Yes Yes Maximum a di a 6 e--n it -a r-e- a- directed ---'-''-- _t o_ --a- ---single --p-o Win n -t'o- _t h- -e- -pe-r- me -a bI e 26 pavement (sq ft) 0 0 0 0 0 27 I Is at least one observation well per terrace been provided at the low point(s)? Yes Yes Yes Yes Yes 28- Have e--d- 9-1 _e restraints prcv-id--od?_-- __—Ye—s- ----Yes Yes Yes Yes WIFI Yes Yes Yes Yes W-F11_the perm_e-`ab_I e.-pavement be protected from se-di--m'e-n-t-'d-u-r-in-g------'------ 30 31 construction? Will an in -situ permeability test be conducted after site stabilization? Yes Yes Yes Yes Yes Yes Yes Yes Yes Ves" ]For Infiltrating Pavement Systems Was the soil investigated in the footprint and at the elevation of the 32 subgrade? Yes Yes Yes Yes Yes 33 Soilinfiltrationr@te(i_Mhr) 2 in/hr 2 in/hr 2 in/hr 2 in/hr 2 in/hr 34 i ie&6 ---- --- - ----- s " detailed a a ydrogeologic study attached if the separation is between 1 and 2 feet? N/A N/A N/A N/A N/A 35 Is additional media being added to the soil profile? Yes Yes Yes Yes Yes 36 Proposed slope of the subgrade surface 2% 2% 2% 2% I 37 _Jffie - 66�rk_e (bottom of the _s Top Top s aggregate) (f m- li T5 7.5 7 7.5 T5 38 time (hours) ------------- h-rs------'- .. ........ For Detention Pavement Systems 39 Drawdown time (hours) Aggregate 6 !Aggregate depth (in) 41 Aggregate porosity (n) - --------- 42 Size of aggregate to be used in the subbase 43 Will -the aggregate 6e washed?-` --- ADDITIONAL INFORMATION 12 in 0.4 12 in 0.4 12 in 0.4 #57 #57 y6`s__1—yiiS_-1—yeS Please use this space to provide any additional information about the 44 permeable pavement systern(s): o infiltration rates are assumed based on specified engineered fill material Permeable Pavement 12 in 0.4 es 1 9:20 AM 5/6/2020 MAY 7 S� Central Files: APS _ SWP 5/8/2020 Permit Number SW8190401 Permit Tracking Slip Program Category Status Project Type State SW Active Major modification Permit Type Version Permit Classification State Stormwater 1,10 Individual Primary Reviewer Permit Contact Affiliation christine hall Coastal SWRule Coastal Stormwater - 2017 Permitted Flow Facility Facility Name Major/Minor Region North Waterfront Park Minor Wilmington Location Address County 10 Cowan St New Hanover Facility Contact Affiliation Wilmington NC 28401 Amy Beatty 302 Willard St Owner Wilmington NC 28402 Owner Name Owner Type City of Wilmington Government - Municipal Owner Affiliation Sterling Cheatham PO Box 1810 Dates/Events Wilmington NC 2840218 Scheduled Orig Issue App Received Draft Initiated Issuance Public Notice Issue Effective Expiration 5/9/2019 4/6/2020 5/8/2020 5/8/2020 5/9/2027 Regulated Activities Requested /Received Events State Stormwater - HD - Infiltration Additional information requested 4/16/20 State Stormwater - HD - Other Additional information received 4124/20 Additional information requested 4129/20 Additional information received 517120 Outfail Waterbody Name Streamindex Number Current Class Subbasin