HomeMy WebLinkAboutSW8120206_COMPLIANCE_20120320STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW
DOC TYPE
❑ CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
COMPLIANCE EVALUATION INSPECTION
DOC DATE
WWMMDD
INFILTRATION BASIN ANALYSIS FOR PHASE II AND 2008 PROJECTS
Formula
FILENAME: S:IWQSIexcel spreadsheetsllNBASIN1120206 User in ut
PROJECT NUMBER: SW8
120206 Current Date 20-Mar-12
PROJECT NAME:
BC Habitat for Humanity Basin 2 Original Run Date:
DRAINAGE BASIN:
Lumber REVIEWER: Chris Baker
11f
RECEIVING STREAM:
Jinnys Branch CLASS: C;Sw
Index No.:
15-25-2-16-1-(1) ORW, is site within the 575' AEC? Y N
RULES ("2008" or "Ph2")
2008 1 (Use a comma (') before entering 2006)
PROJECT AREA
1.73 acres Overall DA 11626 Sf
=
0.271
acres
11626
sf (reduce overall DA by previously permitted BUA amount)
DA for Proposed BUA
0
DA for Prev.Permitted BUA
sf (assume DA = previously permitted BUA)
IMPERVIOUS AREA CALCULATION
Previously
permitted
Prop. BUA
BUA at diff. DS
C value
BUILDINGS
PARKING/ASPHALT
CONCRETE
OFFSITE
OTHER/FUTURE
Subtotals
Total
Overall % IMPERVIOUS, I=
New BUA % impervious =
Ex. BUA % impervious =
VOLUME CALCULATION
Previously permitted BUA Design Storm
Previously permitted BUA volume
1 yr. 24 hour precipitation depth (inches)
Predevelopment C value from consultant
1 yr. 24 hr. Pre -development volume
1 yr. 24 hr. Post -development volume
1.5" volume for New BUA
2008 Design Volume
Phase 2 Design Volume
SURFACE AREAS 1 ELEVATIO
BOTTOM
TOP/BYPASS
VOLUME PROVIDED 954.50
SOILS INFORMATION
ELEVATION OF SEASONAL
SOIL TYPE
REPORTED INFILTRATION
Time to Draw Down
10 YEAR STORM (WAIVE BYPASS & VFS)
Runoff depth for 10yr 24 hr storm, inches
Volume of 10 yr. 24 hr storm =
volume infiltrated in 24 hours =
Remaining volume to store =
30
35
3
7606
1
0.98
0.95
0.95
0,95
Cc= 10.71
Pre Rv Post Rv
0.05 0.64
0.05 0.64
0.05 0.05
inches
cf
928
3.80
184
2352
928
928
cubic feet
cubic feet
cubic feet
cubic feet
NSIVOLUMES
Elev. (ft) Area, sq ft Inc. Volume Acc, Volume
37.50 449
38.50 1,460 955 955
38.50 1,460 0 955
38.50 1,460 0 955
cf
(most likely I" or 1. 5'
from NOAA chart
does not include exis
HIGH WATER TABLE 34.5 fmsi
sand
RATE 13 in / hr
1.9 hours
from NOAA chart
0 CF
5837 CF, at T=1 day, v= (2 x k x A)
-5837 1CF OK? YES
cf
(most likely I" or 1. 5'
from NOAA chart
does not include exis
HIGH WATER TABLE 34.5 fmsi
sand
RATE 13 in / hr
1.9 hours
from NOAA chart
0 CF
5837 CF, at T=1 day, v= (2 x k x A)
-5837 1CF OK? YES
from NOAA chart
0 CF
5837 CF, at T=1 day, v= (2 x k x A)
-5837 1CF OK? YES
INFILTRATION BASIN ANALYSIS FOR PHASE 11 AND 2008 PROJECTS
Formula
FILENAME: 1S.WQSlexcel spreadsheelsllNBASIN1120206 user input
PROJECT NUMBER: SW8 120206 Current Date 20-Mar-12
PROJECT NAME: BC Habitat for Humanity Basin 1 Original Run Date:
DRAINAGE BASIN: Lumber REVIEWER: Chris Baker
RECEIVING STREAM: Jinnys Branch CLASS: C;Sw
Index No.: 15-25-2-16-1-(1) 111' ORW, is site within the 575' AEC? Y N
RULES ("2008" or "Ph2") 2008 (Use a comma (') before entering 2008)
PROJECT AREA 1.73 acres Overall DA 63626 Sf
= 1.46 acres
DA for Proposed BUA 63626 sf (reduce overall DA by previously permitted BUA amount)
DA for Prev.Permitted BUA I o sf (assume DA = previously permitted BUA)
IMPERVIOUS AREA CALCULATION
BUILDINGS
PARKING/ASPHALT
CONCRETE
OFFSITE
OTHER/FUTURE
permitted
Prop. BUA BUA at diff. DS C value
9000 1
13378 0.98
1688 0.95
0.95
2500 0.95
Subtotals 265661 0 Cc= 10.53
Total 1 265661 1
Overall % IMPERVIOUS, 1=
New BUA % impervious =
Ex. BUA % impervious
VOLUME CALCULATION
Previously permitted BUA Design Storm
Previously permitted BUA volume
1 yr. 24 hour precipitation depth (inchesj
Predevelopment C value from consultant
1 yr. 24 hr. Pre -development volume 1
1 yr. 24 hr. Post -development volume
1.5" volume for New BUA
2008 Design Volume
Phase 2 Design Volume
SURFACE AREAS 1 ELEVATIO
BOTTOM
TOP/BYPASS
41.8%
41.8%
Pre Rv I Post Rv
0.05 0.43
0.05 0.43
1.50
inches
o
cf
3.80
1007
cubic feet
8579
cubic feet
3386
cubic feet
3386
cubic feet
3386
cubic feet
NSIVOLUMES
Elev. (ft)
Area, sq ft
Inc. Volume
Acc. Volume
37.50
3,809
1
38.50
6,113
4961 J
4961
38.50 1
6,113
0
1 4961
38.50
6,113
0
T 4961
VOLUME PROVIDED 4961.00
SOILS INFORMATION
cf
J' or 1.5'
from NOAA chart I
does not include exis
I
HIGH WATER TABLE
34.5
fmsl
sand
RATE
13
in / hr
0.8
hours
ELEVATION OF SEASONAL
SOIL TYPE
REPORTED INFILTRATION
Time tc Draw Dawn
10 YEAR STORM (WAIVE BYPASS & VFS)
Runoff depth for 10 yr 24 hr storm, inches
Volume of 10 yr. 24 hr storm =
Volume infiltrated in 24 hours =
Remaining volume to store =
from NOAA chart
0 CF
49517 CF, at T=1 day, V= (2 x k x A)
-49517 CF OK? YES
'� ECS C. A R O L I N A S , UP "Setting the Standard for Service"
— i . Geotechnical • Construction Materials • Environmental - Facilities NC Registered Engineering Firm F-107B
October 7, 2011
Mr. Chris Russell, P.E.
East Coast Engineering, P.C.
P.O. Box 2469
Shallotte, North Carolina 28459
Reference: Report of Infiltration Testing
Habitat for Humanity Project
Ocean Isle, Brunswick County, North Carolina
ECS Project No. 22.17115
Dear Mr. Russell:
ECS Carolinas, LLP (ECS) recently conducted infiltration testing for the proposed
stormwater best management practice (BMP) areas at the Habitat for Humanity Project
site in Ocean Isle, Brunswick County, North Carolina. This letter, with attachments, is
the report of our testing.
Field Testing
On October 5, 2011, ECS met with Mr. Allen Lewis with East Coast Engineedng, PC
and Mr. Vincent Lewis with NCDENR in order to conduct an exploration of the
subsurface soil and groundwater conditions at five requested locations shown on the
attached Test Location Plan (Figure 1), The locations were surveyed prior to ECS's
visit. The purpose of this exploration was to obtain subsurface information of the in -
place soils for the proposed stormwater BMP areas. ECS explored the subsurface soil
and groundwater conditions by advancing one hand auger boring into the existing
ground surface at the requested boring locations. ECS visually classified the
subsurface soils and obtained representative samples of each soil type encountered.
ECS also recorded the groundwater level and the seasonal high water table (SHWT)
observed at the time of the hand auger borings. The attached Infiltration Testing Form
provides a summary of the subsurface conditions encountered at the hand auger
boring locations.
The groundwater level and the SHWT were estimated at the boring locations below the
existing grade elevation. A summary of the findings are as follows:
Location
Water'Level
SHWT.
1
Winches
65 inches
2
48 inches
38 inches
3
48 inches
Winches
4
40 inches
30 inches
5
Winches
65 inches
ECS has conducted five infiltration tests utilizing a compact constant head
permeameter near the hand auger borings to estimate the infiltration rate for the
subsurface soils. Infiltration tests are typically conducted at two feet above the SHWT.
If the SHWT is less than three feet, the tests are conducted at ten inches below the
surface elevation.
I,Y
C ,
7211 Ogden Business park, Suite 201, Wilmington, NG 28411 - T- 910-686-9114 • F: 910-686-9666 • www.ecslimfted.com
ECS Capitol Services, PLLC • ECS Carolinas, LLP • ECS Florida, LLC • ECS Midwest, LLC • ECS Mid -Atlantic, LLC • ECS Southeast, LLC • ECS Texas, LLP
Report of Infiltration Testing
Habitat for Humanity Project
Ocean Isle, Brunswick County, North Carolina
ECS Project No. 22.17115
October 7, 2011
Field Test Results
Below is a summary of the infiltration test results:
Location
Description
Depth
Inches/
hour
1
Tan/orange fine to med. SAND
41 inches
13.2
2
White fine to med. SAND
17 inches
18.4
3
White fine to med. SAND
12 inches
22.1
4
White fine to med. SAND
12 inches
19.2
5
Tan/orange fine to med. SAND
41 inches
14.0
Infiltration rates and SHWT may vary within the proposed site due to changes in
elevation and subsurface conditions.
Closure
The activities and evaluative approaches used in this assessment are consistent with
those normally employed in assessments of this type. ECS's testing of site conditions has
been based on our understanding of the project information and the data obtained during
our field activities.
ECS appreciates the opportunity to provide our services to you on this project. If you
have any questions concerning this report or this project, please contact us at (910) 686-
9114.
Respectfully,
ECS CAROLINAS, LLP
K. Brooks Wall
Project Manager
Attachments: Figure 1 - Test Location Plan
Infiltration Testing Form
K 1s J. Stamm
Principal
2
y I t 1 t l 1 \
t II• \I
j ! 1 I � 1
I I I ! I I \
t i 1
I
u
m
1
"r--------^-----`---^ -- !
PO
",
I I 3
I ICI 2 1
^----I
I
LAJ
.'1
I L�
I
o
O x
j
!
I ] III
I I III rl 1 ffx I I I 5
0
p I LI IIIII I I f I
I i! II
I
y I
I € I
! 1 I
�.
r----- —
a
APPROXIMATE TEST LOCATIONS
Habitat for Humanity - -
Figure 1— Test Location Plan
Ocean Isle, NC
ECS Project # 22.17115
Provided by: East Coast
October 5, 2011
Engineering, P.C.
KBW ��►i��ILill�►�
Infiltration Testing Form
Habitat for Humanity Site
Ocean Isle, Brunswick County, North Carolina
ECS Project No. 22.17115
October 5, 2011
Location Depth Soil Description
1 0-25" White fine to med. SAND
25"-80" Tanlorange fine to med. SAND
Seasonal High Water Table was estimated to be at 65 inches below the
existing grade elevation.
Infiltration Rate: 13.2 inches per hour
Test was conducted at 41 inches below existing grade elevation
Groundwater was encountered at 80 inches below the existing grade
elevation.
Location Depth Soil Description
2 0-24" White fine to med. SAND
24"-32" Hardpan
32"-48" Tan fine SAND
Seasonal High Water Table was estimated to be at 38 inches below the
existing grade elevation.
Infiltration Rate: 18.4 inches per hour
Test was conducted at 17 inches below existing grade elevation
Groundwater was encountered at 48 inches below the existing grade
elevation.
Location D�eyth Soil Description
3 0-24" White fine to med. SAND
24"-32" Hardpan
32"-48" Tan fine SAND
Seasonal High Water Table was estimated to be at 36 inches below the
existing grade elevation.
Infiltration Rate: 22.1 inches per hour
Test was conducted at 12 inches below existing grade elevation
Groundwater was encountered at 48 inches below the existing grade
elevation.
Infiltration Testing Form
Habitat for Humanity Site
Ocean Isle, Brunswick County, North Carolina
ECS Project No. 22.17115
October 5, 2011
Location Depth Soil Description
4 0-20" White fine to med. SAND
20"-28" Hardpan
28"-48" Tan fine SAND
Seasonal High Water Table was estimated to be at 30 inches below the
existing grade elevation.
Infiltration Rate: 19.2 inches per hour
Test was conducted at 12 inches below existing grade elevation
Groundwater was encountered at 40 inches below the existing grade
elevation.
Location Depth Soil Description
5 0-25" White fine to med. SAND
25"-80" Tan/orange fine to med. SAND
Seasonal High Water Table was estimated to be at 65 inches below the
existing grade elevation.
Infiltration Rate: 14.0 inches per hour
Test was conducted at 41 inches below existing grade elevation
Groundwater was encountered at 80 inches below the existing grade
elevation.
r.