HomeMy WebLinkAboutSW8060416_HISTORICAL FILE_20060517STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW��
DOC TYPE
❑ CURRENT PERMIT
❑ APPROVED PLANS
9HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
YYYYMMDD
State Stormwater Management Systems
Permit No. SW8 060416
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of
North Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Mr. David Lisle & Dannen Properties, LLC
Piner Road Office Park
Piner Road - New Hanover County
go] :i1:l2
construction, operation and maintenance of a wet detention pond in compliance with
the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules')
and the approved stormwater management plans and specifications and other
supporting data as attached and on file with and approved by the Division of Water
Quality and considered a part of this permit.
This permit shall be effective from the date of issuance until May 17, 2016, and shall be
subject to the following specified conditions and limitations:
1. DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater
runoff as described in Section 1.6 on page 3 of this permit. The stormwater
control has been designed to handle the runoff from 59,677 square feet of
impervious area.
3. The tract will be limited to the amount of built -upon area indicated on page 3 of
this permit, and per approved plans. There is no built -upon area allocated for
future development in this permit.
4. All stormwater collection and treatment systems must be located in either
dedicated common areas or recorded easements. The final plats for the project
will be recorded showing all such required easements, in accordance with the
approved plans.
5. The runoff from all built -upon area within the permitted drainage area of this
project must be directed into the permitted stormwater control system.
Page 2 of 7
State Stormwater Management Systems
Permit No. SW8 060416
6. The following design criteria have been provided in the wet detention pond and
must be maintained at design condition:
a.
Drainage Area, acres:
1.73
Onsite:
1.73
Offsite:
0
b.
Total Impervious Surfaces, ftz:
59,677
C.
Design Storm, inches:
1
d.
Pond Depth, feet:
4
e.
TSS removal efficiency:
90%
f.
Permanent Pool Elevation, FMSL:
21.5
g.
Permanent Pool Surface Area, ft2:
5,346
h.
Permitted Storage Volume, ft3:
10,550
i.
Temporary Storage Elevation, FMSL:
23.1
j.
Controlling Orifice:
VO pipe
k.
Permitted Forebay Volume, ft3:
1,756
I.
Receiving Stream/River Basin:
Mott Creek 1 Cape Fear
M.
Stream Index Number:
18-82
n.
Classification of Water Body:
"C.Sw"
II. SCHEDULE OF COMPLIANCE
1. The stormwater management system shall be constructed in its entirety,
vegetated and operational for its intended use prior to the construction of any
built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of
the system will be repaired immediately.
3. The permittee shall at all times provide the operation and maintenance
necessary to assure the permitted stormwater system functions at optimum
efficiency. The approved Operation and Maintenance Plan must be followed in
its entirety and maintenance must occur at the scheduled intervals including, but
not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
c. Mowing and revegetation of slopes and the vegetated filter.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and
specifications.
f. Debris removal and unclogging of outlet structure, orifice device, flow
spreader, catch basins and piping.
g. Access to the outlet structure must be available at all times.
Page 3 of 7
State Stormwater Management Systems
Permit No. SW8 060416
4. Records of maintenance activities must be kept and made available upon
request to authorized personnel of DWQ. The records will indicate the date,
activity, name of person performing the work and what actions were taken.
5. Decorative spray fountains will be allowed in the stormwater treatment system,
subject to the following criteria:
a. The fountain must draw its water from less than 2' below the permanent
pool surface.
b. Separated units, where the nozzle, pump and intake are connected by
tubing, may be used only if they draw water from the surface in the
deepest part of the pond.
c. The falling water from the fountain must be centered in the pond, away
from the shoreline.
d. The maximum horsepower for a fountain in this pond is 118 horsepower.
6. The facilities shall be constructed as shown on the approved plans. This permit
shall become voidable unless the facilities are constructed in accordance with
the conditions of this permit, the approved plans and specifications, and other
supporting data.
7. Upon completion of construction, prior to issuance of a Certificate of Occupancy,
and prior to operation of this permitted facility, a certification must be received
from an appropriate designer for the system installed certifying that the permitted
facility has been installed in accordance with this permit, the approved plans and
specifications, and other supporting documentation. Any deviations from the
approved plans and specifications must be noted on the Certification. A
modification may be required for those deviations.
8. If the stormwater system was used as an Erosion Control device, it must be
restored to design condition prior to operation as a stormwater treatment device,
and prior to occupancy of the facility.
9. Access to the stormwater facilities shall be maintained via appropriate
easements at all times.
10. The permittee shall submit to the Director and shall have received approval for
revised plans, specifications, and calculations prior to construction, for any
modification to the approved plans, including, but not limited to, those listed
below:
a. Any revision to any item shown on the approved plans, including the
stormwater management measures, built -upon area, details, etc.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area or to the
drainage area.
e. Further subdivision, acquisition, lease or sale of all or part of the project
area. The project area is defined as all property owned by the permittee,
for which Sedimentation and Erosion Control Plan approval or a CAMA
Major permit was sought.
f. Filling in, altering, or piping of any vegetative conveyance shown on the
approved plan.
11. The permittee shall submit final site layout and grading plans for any permitted
future areas shown on the approved plans, prior to construction.
12. A copy of the approved plans and specifications shall be maintained on file by
the Permittee for a minimum of ten years from the date of the completion of
construction.
Page 4 of 7
State Stormwater Management Systems
Permit No. SW8 060416
13. The Director may notify the permittee when the permitted site does not meet one
or more of the minimum requirements of the permit. Within the time frame
specified in the notice, the permittee shall submit a written time schedule to the
Director for modifying the site to meet minimum requirements. The permittee
shall provide copies of revised plans and certification in writing to the Director
that the changes have been made.
III. GENERAL CONDITIONS
This permit is not transferable except after notice to and approval by the Director.
In the event of a change of ownership, or a name change, the permittee must
submit a formal permit transfer request to the Division of Water Quality,
accompanied by a completed name/ownership change form, documentation
from the parties involved, and other supporting materials as may be appropriate.
The approval of this request will be considered on its merits and may or may not
be approved. The permittee is responsible for compliance with all permit
conditions until such time as the Division approves the transfer request.
2. Failure to abide by the conditions and limitations contained in this permit may
subject the Permittee to enforcement action by the Division of Water Quality, in
accordance with North Carolina General Statute 143-215.6A to 143-215.6C.
3. The issuance of this permit does not preclude the Permittee from complying with
any and all statutes, rules, regulations, or ordinances, which may be imposed by
other government agencies (local, state, and federal) having jurisdiction.
4. In the event that the facilities fail to perform satisfactorily, including the creation
of nuisance conditions, the Permittee shall take immediate corrective action,
including those as may be required by this Division, such as the construction of
additional or replacement stormwater management systems.
5. The permittee grants DENR Staff permission to enter the property during normal
business hours for the purpose of inspecting all components of the permitted
stormwater management facility.
6. The permit may be modified, revoked and reissued or terminated for cause. The
filing of a request for a permit modification, revocation and reissuance or
termination does not stay any permit condition.
7. Unless specified elsewhere, permanent seeding requirements for the stormwater
control must follow the guidelines established in the North Carolina Erosion and
Sediment Control Planning and Design Manual.
8. Approved plans and specifications for this project are incorporated by reference
and are enforceable parts of the permit.
9. The permittee shall notify the Division any name, ownership or mailing address
changes within 30 days.
Permit issued this the 17th day of May, 2006.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
for Alan W. Klimek, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
Page 5 of 7
State Stormwater Management Systems
Permit No. SW8 060416
Piner Road Office Park
Stormwater Permit No. SW8 060416
New Hanover County
Designer's Certification
I, , as a duly registered
in the State of North Carolina, having been authorized to observe (periodically/ weekly/
full time) the construction of the project,
(Project)
for (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specification:
Signature
Registration Number
Date
SEAL
Page 6 of 7
State Stormwater Management Systems
Permit No. SW8 060416
Certification Requirements:
The drainage area to the system contains approximately the permitted
acreage.
_2. The drainage area to the system contains no more than the permitted
amount of built -upon area.
.3. All the built -upon area associated with the project is graded such that the
runoff drains to the system.
.4. All roof drains are located such that the runoff is directed into the system.
5. The outlet/bypass structure elevations are per the approved plan.
.6. The outlet structure is located per the approved plans.
7. Trash rack is provided on the outlet/bypass structure.
8. All slopes are grassed with permanent vegetation.
9. Vegetated slopes are no steeper than 3:1.
.10. The inlets are located per the approved plans and do not cause short-
circuiting of the system.
11. The permitted amounts of surface area and/or volume have been
provided.
12. Required drawdown devices are correctly sized per the approved plans.
13. All required design depths are provided.
14. All required parts of the system are provided, such as a vegetated shelf,
and a forebay.
15. The required system dimensions are provided per the approved plans.
cc: NCDENR-DWQ Regional Office
Tony Roberts, New Hanover County Building Inspections
Page 7 of 7
CAPE FEAR RIVER BASIN
Name of Stream
Subbasin
Stream Index Number
Map Number
Class
Mines Creek
CPF16
18-38-1-(2)
H23SE4
C
Mines Creek (Pages Lake)
CPF16
18-38-1-(1),
H23SE4
B
Mingo Swamp
CPF18
18-68-12-2
F24NE7
C;Sw
Mire Branch
CPF13
18-20-13-2
F22SE4
C
Mire Branch
CPF21
18-74-7
G27SW3
C;Sw
Moadams Creek (Latham Lake)
CPF02
16-18-7
C21SE2
C;NSW
Moccasin Branch
CPF19
18-68-1-12
H25NW3
C;Sw
Moccasin Creek
CPF03
16-19-9
C21SW9
C;NSW
Molasses Creek
CPF17
18-88-9-2-5
1,26NE8
SA;HQW
Molly Branch
CPF13
18-20-28
F23SE1
WS-IV
Moore Branch
CPF14
18-23-16-8-6-1
F22SW7
WS-III
Moore Creek
CPF17
18-86-1
K26SE9
C;Sw
Moores Creek
CPF02
16-11-3
C19NW8
WS-III;NSW
Moores Creek
CPF20
18-66-18
126SRI
C;Sw
Moores Creek
CPF23
18-74-33-1
I28NKS
C;Sw
Morgan Branch
CPF17
18-81-7
K26NE5
C;Sw
Morgan Creek
CPF06
16-41-2-(1)
D22NW3
WS-II;HQW,NSW
Morgan Creek
CPF06
16-41-2-(5)
D22NE7
C;NSW
Morgan Creek
CPF06
16-41-2-(5.5)
D22NES
WS-IV;NSW
Morgan Creek (University Lake)
CPF06
16-41-2-(1.5)
D22NE7
WS-II;HQW,NSW,CA
Morgan Creek (including the Morgan Creek Arm of
CPF05
16-41-2-(9.5)
D22SE3
WS-IV;NSW,CA
New Hope River Arm of B. Everett Jordan Lake)
Morgan Creek (including the Morgan Creek Arm of
CPF06
16-41-2-(9.5)
D22SE3
WS-IV;NSW,CA
New Hope River Arm of B. Everett Jordan Lake)
Morgans Creek
CPF23
18-74-SS-12
727NW7
C;Sw
Morris Branch
CPF05
16-41-1-17-3-1
D23SW6
WS-IV;NSW
Motes Creek (Newland Creek)
CPF04
16-25
D21NE2
C;NSW
Mott Creek (Todds Creek)
CPF17
18-82
K27NW9
C;Sw
Motts Channel
CPF24
16-87-24-2
K27NE2
S13:4
Mount Pleasant Creek
CPF09
17-16-3
D20SE4
WS-III
Mountain Creek
CPFOS
16-41-1-5
D22NE1
C;NSW
Mud Creek
CPF05
16-41-1-10
C23Sw7
C;NSW
Mud Lick Creek
CPF12
17-43-6-(0.5)
D21SW5
WS-III
Mud Lick Creek
CPF12
17-43-6-(2)
D21SW4
WS-III;CA
Muddy Creek
CPF02
16-11-14-1-3
C19SEG
C;NSW
Muddy Creek
CPF08
17-9-(1)
D19NW9
WS-IV:"
Muddy Creek
CPF08
17-9-(2)
D19NW9
WS-IV;CA:*
Muddy Creek
CPF22
18-74-25
H27SE2
C;Sw
Muddy Creek (Overhills Lake)
CPF14
18-23-26
F22SES
C
Muddy Slough
CPF17
18-98-7
L27NW7
SA;HQW
Muddy Slough
CPF17
18-85-8-2-1
L27NW7
SA;HQW
Mulberry Branch
CPF17
18-70-3
J26SE5
C;Sw
Mulberry Branch
CPF23
18-74-55-7
026NE6
C;Sw
Mulford Creek
CPF16
18-47
I24SE3
C
Mullato Branch
CPF18
18-68-12-8-2
H24NE6
C;Sw
Mullatto Branch
CPF13
18-20-3-1
F22NWB
C
Mullet Run
CPF24
18-87-9-1
J28NE7
SA;HQW
Murpheys Creek
CPF22
18-74-29-0.5
H26SW3
C;Sw .
Myrtle Sound Shellfishing Area
CPF24
18-87-31
K27SW6
SA;HQW
Nahunga Creek
CPF22
18-74-19-13
G26SEB
C;Sw
Nancy Branch
CPF05
16-41-1-17-3-2
D23SW2
WS-IV;NSW
Nancys Creek
CPF17
18-88-1-3
L26NE3
SC;Sw,HQW
Natmore Creek
CPF16
18-60
J25NE9
WS-IV;Sw
Natmore Creek
CPF16
18-66-22-1-2-2-1
J25NE9
C;Sw
Natmore Creek
CPF20
16-68-22-1-2-2-1
J25NE9
C;Sw
Neal Branch
CPF17
16-66-8
J26SE1
C;Sw
Neills Coon Branch
CPF13
18-20-13-3-3
F22SW9
C
Page 18 of 28
r .•1,
ARTICLES OF ORGANIZATION
OF
DANNF,N PROPERTIES, LLC
SOSID: 725327
Date Filed: 5/11/2004 3.55:00 PM
Elaine F. Marshall
North Carolina Secretary of State
C200413100257
Pursuant to § 57C-2-20 of the General Statutes of North Carolina, the undersigned does
hereby submit these Articles of Organization for the purpose of forming a limited liability
company.
The name of the limited liability company is:
DANNEN PROPERTIES, LLC
2. The duration of the limited liability company is perpetual.
1. The name and address of the organizer executing these Articles of Organization is
as follows:
Laura L. Lisle
1515 Chestnut Street
Wilmington, NC 28401
New Hanover County
4. The name of the initial registered agent and the street address and county of the
initial registered office of the iimited liability company are:
Laura L. Lisle
1515 Chestnut Street
Wilmington, NC 28401
New Hanover County
5. The mailing address of the limited liability company is the same as that stated in
the preceding paragraph 4.
6. Principal office information (select either a. or h):
(a) The limited liability company has a principal office. The street
address and county of the principal office of the limited liability company is:
✓ (b) The limited liability company does not have a principal office.
50373
t
l . I
7. Check one of the fbllowing:
✓ (i) Member -managed LLC: All members by virtue of their status as
members shall be managers of this limited liability company.
(ii) Manager -managed LLC: Except as provided by N.C.G.S.
Section 57C-3-20(a), the members of this limited liability company shall not be managers
by virtue of their status as members.
8. To the fullest extent permitted by applicable law, as it now exists or may hereafter
be amended, the limited liability company shall indemnify all members and managers of the
limited liability company against all liability and litigation expense, including, but not limited to,
reasonable attorneys' fees, arising out of their status as such or their activities in the foregoing
capacity, regardless of when such status existed or activity occurred and regardless of whether or
not they are members or managers of the limited liability company at the time such
indemnification is sought or obtained. Without limiting the generality of the foregoing
indemnity, such persons may also recover from the limited liability company all reasonable
costs, expenses and attorneys' fees in connection with the enforcement of rights to
indemnification granted herein. The provisions of this paragraph are in addition to and not in
limitation of the power of the limited liability company with respect to, and the rights of any
manager or member of the limited liability company to receive the benefits of, any other or
further indemnification, insurance, elimination of liability or the right or benefit which is either
required by the North Carolina Limited Liability Company Act or permitted thereby and duly
adopted by the limited liability company in accordance therewith.
�). To the fullest extent permitted by applicable law, as it now exists or may hereafter
be amended, no member or manager of the limited liability company shall have any personal
liability arising out of any action, whether by or in the right of the limited liability company or
otherwise, for monetary damages for breach of his or her duty as a manager or member. This
paragraph shall not impair any right to receive indemnity or insurance from the limited liability
company or any third party which any member or manager may now or hereafter have. Any
repeal or modification of this paragraph shall not impair or otherwise adversely affect any
limitation on, or elimination of, the personal liability of a member or manager effected hereby
with respect to the acts or omissions occurring prior to such repeal or modification.
10. These Articles of Organization will be effective upon filing.
This the day of May, 2004.
� V. a�u
Laura L. Lisle, Organizer
50373 2
ADOPTION
.Thc undersigned, being all of the Members of the Company, have adopted this
AgreeIneilt .Ind have caused this Agreement to be adopted by the Company as of
2004 and assume and agree to be boLind by and to perform
all of th provisions set forth in t
t rms and his Agreement.
THE COMPANY:
DANNEN PROPERTIES, LLC
e� J,
By: .
Name: } ,�
Title: Member/Manager
MEMB
David lid, Lisle
Lisle
Oil
epee R. S'1131th
Yam_ (SEAL)
% (SEAL)
/ r
(SEAL)
(SEAL)
PtII-SLIant to § 2-20 of the Act, the undersigned, as sole organizer of the Company, identifies
the Persons listed under "MEMBERS" above as the initial Members of the Company.
ava� " (SEAL)
Laura Lisle, Organizer
50374 ?9
IL
E N O 1 N E E A I N [3
FAX COVER SHEET
To: Rob Gordon
Affiliation: NCD1NTR
Fax #: 350-2004
plumber of pages: (Including Cover)
Date: May 16, 2006
Fxom: Tun Clinkscales
RE: Piner Road Comment
Project No: 06101PFI
Comments: Rob, Mere is the info.cmation you requested for Piner Road. Sony for the delay,
we finally got our printers back: on line. Thanks for your help and have a great dayl
Tim Clinkscales,PE
1 2 7 R q C I N C O KI 1 v E. E U I T E 2 O 2, W 1 L M I N S T O N, IN C 2 8 d ❑ 3
P H; ( 9 1 O) 7 9 1 -& 7 ❑ 7 f A %: 1 9 1 ❑) 7 5 3- a 'S 1 7
T9 39bd 3�niO31IH36d 3-ISI3
or
LTSVE9LOT6 ZS:ST 980ZI9TfS0
P. 1
I 1
COMMUNICATION RESULT REPORT ( MAY.15.2006 8 05AM TTI
------RESULT
ADDRESS (GROUP) -----
-----OPTION -------_— OK
FILE MODE _----- --
---------------------9763451r
65E.I— IeIEI,10R'7' TX
----REASOI.1 FOP ERROR
E-1) HANG UP OR LINE FAIL
NO
NCDENR WIRO
PAGE
--------P.-1-1
E--2) BUSY
E-4) NO FACSIMILE CONNECTION
FAX COVER SHEET
Date: May 15, 2006 No. of Pages: 1
To: Tim Clinkscales, PE From: Robert Gordon
Express permitting sec on
Company: Pararnounte Engineering FAX # 910-350-2004
FAX #: 763-4517 Phone # 910-796-7303
DWQ Stormwater Project Number, SW$ 060416
Project Name: Piner Road Office Park
MESSAGE:
Tim — Piner Road Office Park looks good. I just had one comment. The
temporary pool elevation is still incorrect. According to the drawings, the next
highest weir is 23.1. You showed that 22,27 is the required temp pool elevation,
but the provided temp pool and volume (@ 23,1) should be listed on the
supplement.
I do not need any changes to the drawings —just modify the temp pool elevation
and volume on the supplement. I do not know the provided volume or I would
make the change myself,
I am going to ao ahPnel--
l'
Date:
To:
Company
FAX #:
FAX COVER SHEET
May 15, 2006 No. of Pages: 1
Tim Clinkscales, PE From: Robert Gordon
Express permitting section
Paramounte Engineering FAX # 910-350-2004
763-4517
Phone # 910-796-7303
DWQ Stormwater Project Number: SW8 060416
Project Name: Piner Road Office Park
MESSAGE:
Tim — Piner Road Office Park looks good. I just had one comment. The
temporary pool elevation is still incorrect. According to the drawings, the next
highest weir is 23.1. You showed that 22.27 is the required temp pool elevation,
but the provided temp pool and volume (@ 23.1) should be listed on the
supplement.
I do not need any changes to the drawings —just modify the temp pool elevation
and volume on the supplement. I do not know the provided volume or I would
make the change myself.
am going to go ahead and draft the permit — hopefully it will go out as soon as I
receive the above info. Thanks!
i
-DA-RAMC
E N G 1 N E E R 1 N G, 1 N. C
1 2 7 R A C I N E D R I V E S U I T E 2 0 2
W I L M ING TO N, N C 2 8 4 0 3
9 1 0- 7 9 1- 6 7 0 7( O) 9 1 0- 7 6 3- 4 5 1 7 { F)
L E T T E R O F T R A N S M I T T A L
To:
NCDENR
Date
5/5/06
Re:
Piner Road Office Park
Attn:
Rob Gordon, PE
Fro'ectNo.
F06102.PEI
e are send in ❑ Originals
® Prints
❑ Shop Drawings
® Calculations
oe . . following items. ❑ Correspondence
® Plans
❑ Specifications
❑ Other as listed below
Quantity >
" `. ',Date.:.
'Dw '-'No.
Description
2
5/5/O6
C3 C3.1 C5,
and C6,
C �' v
Stormwater Plans
2
5/5/06
Update Calculations MAI
1
LLC Documentation
1
Response Letter--
1
Original Wet Detention Supplement
1
Update Sheet 2 of SWU 101
Issue Staius: ® For Approval ❑ As Requested ❑ Construction ❑ Sid
❑ For Your Use ❑ For Review and Comment ❑ Approved as Noted ❑ See Remarks
etion-Taken: ❑ No Exceptions Taken ❑ Make Corrections Noted ❑ Amend & Resubmit
❑ Rejected - See Remarks ❑ Approved as Submitted ❑ Other
Remarks
ICc Sigtned � �jG.ry�/��
Tim Clinkscaies,PE
i
IM-AMOUNII,
.-A
E R I N 13 1 N. C
May 5, 2006
Robert Gordon
NCDENR Division of Water Quality
127 Cardinal Drive Extension
Wilmington, NC 28405-3845
RE: Stormwater Project No. SW 8 060416
Piner Road Office Park
New Hanover County
Dear Mr. Gordon:
Thank you for your comment letter dated April 25, 2006 regarding the above -mentioned
project. Your comments (in bold) are provided below followed by our responses (in
italic):
1. Please provide documentation that David Lisle is a member of Dannen Porperties,
LLC
• A letter with his status as a member is placed in the resubmittal set
2. The drainage area listed on the application and calculations does not match the
drainage area neap (it does not appear the DA = entire site. The DA appears to
have been incorrectly noted in the "stormwater notes" on sheets C3 and C6.
• The drainage area has been updated for two areas, one with the 1.37 acres of impervious
area and the second that has no added impervious area and does not drain to the proposed
detention pond.
3. While it is shown that a temporary pool elevation of 22.3 will satisfy the 1" state
stormwater required volume, it appears that the actual temporary pool is 23.1.
• The actual elevation of the temporary pool elevation is 22.27. This is based on the 1 "
orifice is located at the permanent pool of 21.50. This will be updated on sheet C6 and the
updated values on the supplement.
4. Please include basic permanent vegetation/seeding requirements for the project
(on the drawings).
• This has been updated on sheet C3
5. Please provide stage -storage information for the pond and forebay
• This is added to the submittal set
6. Please provide an original signature for the wet detention supplement
• The original is placed in the submittal set
7. Please provide a curb detail for the project
• A detail for the 24" standard curb and gutter has been added to the submittal set
on sheet C5.
7 2 7 R A C 1 N E Q R I V E, 9 U I T E 2 a 2, W I L M 1 N G T U N, N C 2 9 4 ❑ 3
P H: 1 9 1 13 1 7 9 7 • 6 7 0 7 F A x: ( 9 1 ❑ ) 7 6 3- 4 5 1 7
E- N 0 ! N E E R ! N
I trust that our responses have satisfactorily addressed your comments. Please feel free
to contact me should you have further questions after reviewing our responses and the
enclosed materials. Thank you for your assistance with this project.
T CL
Tim Clinkscales,PE
1 2 7 R A C 1 N E D R I V E, 5 U 1 T E 2 [] Z, W I L M I N G T 0 N, N C i a 4 0 3
P H: 1 9 1 0 1 7 9 1 • 6 7 0 7 FA X: 1 9 1 ❑) 7 5 3- 4 5 1 7
P. 1
COMMUNICATION RESULT REPORT ( APR.25.2006 2:46PM )
/ TTI CDENR WIRO
FILE MODE OPTION ADDRESS (GROUP) 1 RESULT----PAGE_-
-----------------------------------------------------I---------- --
2S6 MEMORY TX 9-763A517 OK P. 3/3
REASON FOR ERROR - -
E-1) HANG UP OR LINE FAIL
E-3) NO ANSWER
E-2) BUSY
E-4) NO FACSIMILE CONNECTION
FAX COVER SHEET
Date: April 25, 2006 No. of Pages: 3
To: Tim Clinkscales, PE From: Robert Gordon
Express permitting section
Company: Paramounte Engineering FAX # 910.350-2004
FAX #: 763.4517 Phone # 910-796-7303
DWQ Stormwater Project Number: SW8 060416
Project Name: Piner Road Office Park
MESSAGE:
Attached is the request for additional information for Piner Road Office Park. The
original will be mailed to the applicant and a copy will also be mailed to you.
Please call if you have any questions, Thanks! Just to clarify a few items — see
below...
3. We usually like you to reference the volume to the next highest orifice as the
temporary pool, You set up your talcs fine — I would not worry about changing
the temp pool elevation on those. Probably a good idea to document where the
required volume/elevation is anyway.
7 1h1...... -11.. J- _-a - . . .
FAX COVER SHEET
Date: April 25, 2006 No. of Pages: 3
To: Tim Clinkscales, PE From: Robert Gordon
Express permitting section
Company: Paramounte Engineering FAX # 910-350-2004
FAX #: 763-4517 Phone # 910-796-7303
DWQ Stormwater Project Number: SW$ 060416
Project Name: Piner Road Office Park
MESSAGE:
Attached is the request for additional information for Piner Road Office Park. The
original will be mailed to the applicant and a copy will also be mailed to you.
Please call if you have any questions. Thanks! Just to clarify a few items — see
below...
3. We usually like you to reference the volume to the next highest orifice as the
temporary pool. You set up your calcs fine — I would not worry about changing
the temp pool elevation on those. Probably a good idea to document where the
required volume/elevation is anyway.
7. We usually do not require a curb detail but since your dimensions were all to
the face of the curb (not the back), we need the curb detail to dimension all BUA.
I figured it would be easier to include the curb detail rather than re -dimension
everything.
C�Of( W A rEnp Michael F. Easley, Governor
William G. Ross Jr., Secretary
U) North Carolina Department of Eitivironment and -Natural Resources
7
Q N, Alan W. Klimek, P.E. Director
Division of Water Quality
April 25, 2006
Mr. David Lisle
Dannen Properties, LLC.
1515 Chestnut Street
Wilmington, NC 28401
Subject: Request for Additional Information
Stormwater Project No. SW8 060416
Piner Road Office Park
New Hanover County
Dear Mr. Lisle:
The Wilmington Regional Office received a Stormwater Management Permit Application for
Piner Road Office Park on April 18, 2006. A preliminary review of that information has
determined that the application is not complete. The following information is needed to
continue the stormwater review.
1. Please provide documentation that David Lisle is a member of Dannen Properties, LLC.
Only the Article of Incorporation are listed with the NC Secretary of State's office and
they do not list the members of the LLC
2. The drainage area listed on the application and calculations does not match the
drainage area map (it does not appear the DA = the entire site. The DA appears to
have been incorrectly noted in the "`stormwater notes" on sheets C3 & C6. Note - this
change may effect the calculations.
3. While it is shown that a temporarypool"elevation of 22.3 will satisfy the V state
stormwa#er required volume, it appears that the actual temporary pool is 23.1 (the next
highest orifice. Please adjust the
ytemporary pool elevation and volume figures on the
supplement to the provided temporary`pool elevation.
4. Please include basic permanent veg aet tion/seeding requirements for the project (on the
drawings).
5. Please provide stage-starat information for the pond & forebay (from bottom to temp
pool elevation).
6. Please provide an original senature for the wet detention supplement. The signature
provided was a copy. z
7. Please provide a curb detail for the project.
Please note that this request for additional information is in response to a preliminary review.
The requested information should be received by this Office prior to May 8, 2006, or the
application will be returned as incomplete. The return of a project will necessitate resubmittal of
all required items, including the application fee.
No�thCarolina
�llutllrrr!!�
North Carolina Division of Water Quality 127 Cardinal Drive Extension Phone (910) 796-7215 Customer Service 1-877-623-6748
Wilmington Regional Office Wilmington, NC 28405 Fax (910) 350-2004 Internet: w'w%v.ncwatcrgua1iw.org
An Equal OpporlunitylAifrmative Action Employer— 50%Recycledli0%Post Consumer Paper
•Piner Road Office Park
April 25, 2006
Stormwater Permit # SW8 060416
If you need additional time to submit the information, please mail or fax your request for a time
extension to the Division at the address and fax number at the bottom of this letter. The
request must indicate the date by which you expect to submit the required information.
The construction of any impervious surfaces, other than a construction entrance under an
approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject
to enforcement action pursuant to NCGS 143-215.6A.
Please reference the State assigned project number on all correspondence. Any original
documents that need to be revised have been sent to the engineer or agent. Ali original
documents must be returned or new originals must be provided. Copies are not acceptable. If
you have any questions concerning this matter please feel free to call me at (910) 796-7303.
Sincerely,
R-Q� -
Robert D. Gordon
Environmental Engineer II
ENBIRDG: S:IWQSISTORMWATERIADDINF0120061060416.apr06
cc: Tim Clinkscales, PE, Paramounte Engineering
Robert D. Gordon
-NT
E; N G 1 N E E R I N G, 1 N. C. 1
1 2 7 R A C I N E D R I V E S U I T E 2 0 2
W I L M I N G T O N, NC 2 8 4 0 3
9 1 0- 7 9 1- 6 7 0 7( O) 9 1 0- 7 6 3- 4 5 1 7 ( F)
L E T T E R O F T R A N S M I T T A L
To:
NCDENR
Date
4/18/06
Re:
Piner Road Office Park
Attn:
Paul Bartlett, PE
Project No.
I 06102.PE1
e are sendin ❑ Originals
The following items. ❑ Correspondence
® Prints ❑ Shop Drawings ® Calculations
® Plans ❑ Specifications ❑ Other as listed below
Quantity
Date
Dwg. No.
Description
2
4/18/06
G001,
C 1,C 2.1,C3,C3.1,C6,C7
Stormwater Plans
2
4/18/06
Design and Stormwater Narrative
1
4/18/06
Original and Copy of SXVU101
1
4/18/06
Original SXXrU 102
1
$4000 check (41004)
Issue Statusi ® For Approval ❑ As Requested ❑ Construction ❑ Bid %j < Dec"<-e
❑ For Your Use E) For ReNiew and Comment ❑Approved as Noted ❑See Remarks r� 01A
ction Taken: ❑ No Exceptions Taken ❑ Make Corrections Noted ❑ Amend & Resubmit 1
❑ Rejected - See Remarks ❑ Approved as Submitted ❑ Other F �e 1 4? '-J
Remarks �' q rQ�
y nn n
U.-I t 1 . —
;Cc: Signed:
Tim Clinkscales,PE
APR 1 8 ''1O0b