Loading...
HomeMy WebLinkAboutSW8060335_COMPLIANCE_20170103STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD Energy, Mineral & Land Resources ENVIRONMENTAL QUALITY January 3, 2017 Mr. Peter Bensen. Manager \•1cDonald's USA, LLC One McDonald's Plaza Oak Brook_ I.L 60523 -Is. Gloria Santora, Manager McDonald's USA, LLC One 1NIcDonald's Plaza Oak Brook_ IL 60523 1\9s. Karen Nlatusinec, Nlanap-er R9cDonald's USA, LLC One McDonald's Plaza Oak Brook, IL 60523 Ms. Marcy Miller. Nlanager 1%9cDonald's USA, LI,C McDonald's Corporation One NicDonald's Plaza Oak Brook, 1L 60523 ,1•ir. Andrew J. iMchenna. Chairman McDonald's Corporation One McDonald's Plaza Oak Brook, IL 60523 Subject: Notice of Non -Compliant Inspection & Permit Extension McDonald's Sneads Ferry State Stormwater Management Permit No. SNN'8 060335 Onslow County Dear Mr. Bensen, Ms. Santona, 'Ms. Nlatusinec, i\1s. Miller, & Mr. iMcKenna: ROY COOPER Governor TRACY DAVIS nirerrnr Effective August 1, 2013, the State Stornwater program ryas transferred from the Division of Water Quality (D1VQ) to the Division of Energy, Mineral and Land Resources (DEMLR). All previous references to D\VQ will remain in older stormwater permits issued prior to August 1, 2013 until they are modified. Please note that this letter references DLiNILR as the Division responsible for issuance of the permit. `fhc Department of Environment and Natural Resources (DENFR.) has also been renamed the Department of Environmental Quality (DEQ). On August 5, 2009, the Governor signed Session Law 2009-406. This law impacted any development .approval issued by the fornter Division of Water` Quality under Article 21 of Chapter 143 of the General Statutes; which was current and valid at any -point between January 1, 2008, and December 31, 2010. The law extended the effective period of any stormwater permit that was set to expire during this time frarnie to three (3) years from its current expiration date. On August 2, 2010.. the Governor signed Session Law 2010-177, which granted an extra near for a total of four (4) years extension. Accordingly, the Division is herewith notifying you that the subject permit is now effective from the date of issuance until _,%,Iay 4, 2020 which includes all available extensions. On December 14, 2016, the Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (DEMLR) inspected the subject project, located at 930 NIC-210 in Sneads Berry 1n Onslow County to determine the status of compliance with the State Stormwater Management Permit Number State orNorth Carolina I Environmental Quality I Energy, Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I V%'ilmington, NC 28405 910 796 7215 Page 2 of 2 AW SW8 060335 issued on IMay 4, 2006. D1;1N4LR file review and site inspection revealed that the site is not III compliance with the terms and conditions of this permit. Please find a copy of the coniple€ed form entitled "Compliance Inspection Report" attached to this letter, which summarizes the findings of the recent Inspection. A copy of the permit and inspection pictures are included. As shown in the pictures, a wall has blown out from a bioretention basin. Please restore the bioretention basin to its permitted conditions. Please be reminded that it is your responsibility as the permittee of record to submit a completed and signed Ivatne/Ownership Change Form to the Division of Energy, N incral and Land Resources 30-60 calendar days prior to making any of the below listed changes. These forms are available on our website at: Mips://deci.nc.gov/about/divisions/enerm,-mineral-laird-resources/energy-mineral-land- permits/stonnwater-permits/forms. a. An ownership change including the sale or conveyance of the permitted project area in whole or in part. `Phis does not include the conveyance of subdivided residential lots to individuals which are made subject to a recorded declaration of covenants and restrictions which contain the statements required by the stormwater permit; b. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of Session Law 201 1-256; c. Foreclosure proceedings; d. Filing for Bankruptcy; e. Dissolution of the partnership or corporate entity. Per NCGS 57D-6-07, a dissolved LLC shall wind up, which may include continuing the business of the LLC for a period of time. The person charged with winding up the LLC shall collect the LLC's assets [which include the stormwater management permit], and distribute the assets as provided in NCGS 57D-6-08(2). f. A name change of the owner / permittee; g, A name change of the project; h. A mailing address change of the perirtittee; Please be advised that until you submit the required Name/O%vnership Change Form to the Division and receive approval from the Division to transfer the permit., you are required to comply with the terms, conditions and limitations of the Stormwater (Management Permit under Title 15A \North Carolina Administrative Code 211 .1003 and North Carolina General Statute 143-214.7, including the operation and maintenance of the permitted stormwater system. Failure to provide the requested information, or to respond to this letter with a plan of action; including a timeline to resolve the identified deficiencies, by FeII_ruary 3, 2017, are considered violations of the permit. If the requested information is not submitted to this office by the due date, then DEIMLR staff will re -inspect the site and may issue a Notice of Violation. Please also note that any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the stormwater rules is subject to enforcement action as set forth in NCGS 143 Article 21, including the assessment of civil penalties of up to S25,000 per day. If you have any questions, please contact me at the Wilmington Regional Office; telephone number (910)- 796-7331 or via email at kelly.p.johnson@ncdenr.gov. tti,M =y GDSlkpj cc.: I Engineer Compliance Inspection Report 2006 Permit 2016 Inspection Pictures %StormwaterlPennits & Projects120061060335 HD12017 01 CrI deficient 060335 Georgette Scott, Wilmington Regional Office Stormwater Supervisor WHO stormwater Permit Pile State of North Carolina I Environmental Quafity ] Energy, Mineral and Land Resources Wilmington Regional Office I Q7 Cardinal Drive Exiension I Mil mington, NC 28405 910 796 7215 Compliance Inspection Report Permit: SVV8060335 Effective:05104106 Expiration: 05/04/20 Project: McDonalds Sneads Ferry Owner: McDonalds USA LLC County: Onslow Adress: NC Hwy 210 Region: Wilmington CitylStatelZip: Sneads Ferry NC 28460 Contact Person: James M Kurtz Title: Regional Development Director Phone: 919-848-6121 Directions to Project: From intersection of NC hwy 172 and NC hvN 210, proceed north on NC 210 for approx. 700 ft. The Project site is located here on the west side of NC 210 Type of Project: Stale Stormwaler - HD - Bioretention Drain Areas: 1 - (Mill Creek) (03-05-02) ( SA;HQW) 2 - (Mill Creek) (03-05-02) ( SA;HQW) 3 - (Mill Creek) (03-05-02) ( SA;HQW) On -Site Representative(s): Related Permits: Inspection Date: 12/14/2016 Entry Time: 12:55PM Exit Time: 0110PM Primary Inspector: Holley A Snider Secondary Inspector(s): Kelly Johnson Phone: 919-796-7315 Reason for Inspection: Complaint Inspection Type: Compliance Evaluation Permit Inspection Type: State Storm%vater Facility Status: ❑ Compliant E Not Compliant Question Areas: State Stormwaler (See attachment summary) page: 1 Permit: SW8060335 Owner - Project: McDonalds USA LLC Inspection Date: 12/14/2016 Inspection Type Compliance Evaluation Reason for Visit: Complaint File Review Yes No NA NE Is the permit active? ❑ ❑ ❑ Signed copy of the Engineer's certification is in the file? ❑ ❑ ❑ Signed copy of the Operation & Maintenance Agreement is in the file? ❑ ❑ ❑ Copy of the recorded deed restrictions is in the file? ❑ ❑ 0 ❑ Comment Built Upon Area Yes No NA NE Is the site BUA constructed as per the permit and approval plans? ■ ❑ ❑ ❑ Is the drainage area as per the permit and approved plans? 0 ❑ ❑ ❑ Is the BUA (as permitted) graded such that the runoff drains to the system? 0 ❑ ❑ ❑ Comment: SW Measures Yes No NA NE Are the SW measures constructed as per the approved plans? 0 ❑ ❑ ❑ Are the inlets located per the approved plans? 0 ❑ ❑ ❑ Are the outlet structures located per the approved plans? 0 ❑ ❑ ❑ Comment: The stormwater measures have been certified by the Enoineer (see file). A wall has blown out (.,see photos). Operation and Maintenance Are the SW measures being maintained and operated as per the permit requirements? Are the SW BMP inspection and maintenance records complete and available for review or provided to DWQ upon request? Comment: Other Permit Conditions Is the site compliant with other conditions of the permit? Comment: Other WO Issues Is the site compliant with other water quality issues as noted during the inspection? Comment: Yes No NA NE ❑ ❑ ❑ ❑ ❑ ❑ Yes No NA NE ❑ ❑ ❑ Yes No NA NE ■ ❑❑❑ page: 2 J [fit' ��2i :•y��y •#x::: 1���� xrr, Ii i!_-- I � �r a i•1 'Fa 1 fl a•I ..'�l A.�?r,{. YL'+J1 i�f '(�+' 1-(; � T + `t'x- f r• 5 1, i) , �I .ih .f, T tIN .fe i -tr{y.!�41''.`51,1.� t R7' }{ � _� � �- 9 '•s� ` -i.l�i�i 4.7t�ria ��1 f4 �i. �' i ? - .•� - 3• /F.a'3,fy Q�41 -1 -Ist. dFk KI 1 7 a -r i i'l1.f+} � <� � ;'•]': 3+� t'��' '• _I e A �1e, V 1 � p 9 .M •D"f•�f'� r i J' tNfL�e+�t t � ..fir+1k lat L, r� # �` r k �Y: �► �, t'f' 1, I•, 41 Jt i s t+ l.�}lx ! x, �:� "S _45�'( 4-. �'sr{ IjF A�• c+. � _ �.4.:i� �� s.1 .YY j' \5 ifi II'J. .S 11 'lil�• - �" jr, �� �¢-F �.ti .� `,� '� , 1 art �t'x���j�.� -�� _. '_�., r ��F� r_-•<J _ fix[[[ � 1 ; � 3 - w`� ; 1. y. { •� � t `� x - e� ! !!!iii �} * i�.:, - s4 +..' , x �r 11( � f ! Ii 1.• 1{j.] � . - •1 �lyy 1. •kyn �.I � 1t, q���• :ti :'�`��J�"� I:�"�—• � "� JY• ��,�� it � k'�— 'j}, ; ; �yi�� }n �, i � �.��� -..�. ,� '1._ .� .� y�I�p "" � i' ; -• { R �'•7Tl1i.S} ��y�r } i. y�'i � 4 - + ►r �� ,"� l r�:J�j7 ;tip ' r .�t���S, r�: ..fir.' di :} ;�•� .tiro' �-� 5{ � ; >:, -�.. .;� •lr�' `i is i ' _ �J +. I .• , 1 4r)-c, h21.� � .- • v, - ti._:_P3- )�-� i:b-.tFxr{Y' rs�'s. Y �' .i +•f`:f''i;y�4�'+C+i��+"'�.�,�� �"�'a.`': t ssso � 0 s fvls Energy. Mineral & Land Resources ENVIRONMENTAL QUALITY March 30, 2017 Mr. Peter Bensen; Manager McDonald's USA, LLC One McDonald's Plaza Oak Brook, 11, 60523 Subject: Notice (if Inspection — Compliant McDonald's Sneads Ferry State Stormwater Management Permit No. SW8 060335 Onslow County Dear Mr. Bensen: ROY COOPER Governor MICHAEL S. REGAN Serretai _v TRACY DAVIS Director - On March 23, 2017, the Wilmington Regional Office of the Division of Energy_ Mineral and Land Resources (DEMLR) inspected the subject project, located at 930 NC-210 in Sneads Ferry, NC to determine the status of compliance with the State Stormwater Management Permit Number SW8 060335 issued on May 4, 2006. This was a follow-up to the December 14, 2016 inspection which found that a retaining wall surrounding the bioretention basin had blown out. The wall has now been repaired. DFMLR file review and site inspection revealed that the site is in compliance with the terms and conditions of this permit. Please find a copy of the completed form entitled "Compliance Inspection Report" attached to this letter; which summarizes the findings of the recent inspection. Please be advised that until you submit the required Name/Ownership Change Form to the Division and receive approval from the Division to transfer the permit, you are required to comply with the terms,. conditions and limitations of the Stormwater Management Permit under Title 15A North Carolina Administrative Code 2H A 003 and North Carolina General Statute 143-214.7, including the operation and maintenance of the permitted stormwater system. Please also note that any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the stormwater rules is subject to enforcement action as set forth in NCGS 143 Article 21, including the assessment of civil penalties of up to S25,000 per day. If you have any questions, please contact me at the V+.'ilmington Regional Office, telephone number (910)- 796-7331 or via email at kelly.pjc)hnson@ncdenr.gov. 3,tneer enc: Compliance Inspection Report 'i GDSlkpj: 111Stormwater\Permits & Projects120061060335 HD12017 03 CEI_compliant 060335 cc: Mr. Leo Van Buuren, McDonald's USA, LLC (Regional Office) 4601 Six Forks Road, Suite 200, Raleigh; NC 27609 Georgette Scott, Wilmington Regional Office Stormwater Supervisor WiRO Stormwater Permit File State of North Carolina I Environmental Quality I Energy. Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington.N'C 28405 410 7% 7215 Compliance Inspection Report Permit: S1N8060335 Effective-. 05/04/N Project: McDonalds Sneads Ferry Owner: McDonalds USA LLC County: Onsiow Region: Wilmington Expiration: 05/04/20 Adress: NC Hwy 210 City/State/Zip: Sneads Ferry NC 28460 Contact Person: .fames M Kurtz Title: Reczional Development Director Phone: 919-848-6121 Directions to Project: From interseclion of NC hwy 172 and NC nwy 210, proceed north on NC 210 for approx. 700 ft The Project site is located nere on the west side of NC 210 Type of Project: Slate Slormwater - HD - Bioretention Drain Areas: 1 - (Mill Creek) (03-05-02) ( SA;HQVV 2 - (Neill Creek) (03-05-02) { SA;HOV%r 3 - (MiA Creek) (03-05-02) ( SA.HQVV) On -Site Representative(s): Related Permits: Inspection Date: 03/23/2017 Entry Time: 10:45AM Ito Primary Inspector: Holley A Snider Secondary lnspector(s): Reason for Inspection: Follow-up Permit Inspection Type: State Stormwater Facility Status: 2 Compliant ❑ 'Not Compliant Question Areas: U State Slormwater (See attachment summary) Exit Time: 11:00A;A Phone: 919-796-7315 Inspection Type: Compliance Fvaluation page: 1 Permit: SV8060315 owner - Project: McDonalos USA LLC Inspection Date: 0312312017 Inspection Type Compliance Evaluation Reason for Visit: Follow-up Fite Review Yes No NA NE Is the permit active? ❑ ❑ ❑ ;,D Signed copy of the Engineer's oe„iflcation is In the file? ❑ ❑ ❑ EA Signed copy of the Operation & Maintenance Agreement Is in the file? ❑ ❑ ❑ P Copy of the recorded deed restrictions is in the file? ❑ ❑ ❑ Q Comment: Built Upon Area Is the site BUA constructed as per the permit and approval plans? Is the drainage area as per the permit and approved plans? Is the BUA (as permitted) graded such that the runoff drains to the system? Comment: SW Measures Are the SW measures constructed as per the approves plans? Are the inlets located per the approved plans? Are the outlet structures located per the approved plans? Comment Operation and Maintenance Are the SW measures being maintained and operated as per the permit requirements? Are the SW BMP inspection and maintenance records complete and available for review or provided to DWQ upon request? Comment: The blown out portion of the block wail has been repaired. Other Permit Conditions Is the site compliant with other conditions of the permit? Comment: Other WQ Issues Is the site compliant with other water quality issues as noted during the inspection? Comment: Yes No NA NE ED ❑ ❑ ❑ ❑ ❑ ❑ M ❑ ❑ ❑ Yes No NA NE MR ❑ ❑ ❑ ❑ ❑ ❑ Yes No NA NE 2 ❑ ❑ ❑ 2 ❑ ❑ ❑ Yes -No NA NE ❑ 1111 EM Yes No NA NE 91 ❑ ❑ ❑ page: 2 Bioretention Basin Design File Name: S:IWQSIBIORETENTION1060335.WK1 Project Number: SW8 060335 Date 4-May-2006 Project Name: McDonald's, Sneads Ferry Reviewer: P.Bartlett Receiving Stream: UT Mill Creek Classification: SA; HQW Drainage Basin: White Oak Index Number: 19-39-3-1 Minimum Surface Area c=.95 for BUA, c=.25 for grass Minimum Provided Basin # DA BUA Sum C x A BR Area Area 1 24254 20584 19443.10 1361 3450 sf 2 7611 6367 6041.30 423 719 sf 3 0.00 0 sf 4 0.00 0 sf 5 0.00 0 sf Volume Required Basin # Percent BUA Design Storm Rv Value Required Volume w 1 84.87% 1.5 0.81 2467 2 83.66% 1.5 0.80 764 3 #DIV/O! #DIV/O! #DIV/O! 4 #DIV/O! #DIV/O! #DIV/O! 5 #DIV/01 #DIV/O! #DIV/O! Volume Provided EL 3�96 �i 3 ,ti 1 N f 07. Basin # Bottom Area Bottom Elevation Top Area Top Elevation Volume Prov. @Top Req. Vol. Met @ elev. 1 3450 41.500 4526.00 42.50 3988 42.12 ft 2 719 41.500 1092.00 42.50 906 42.34 ft 3 0 #DIV/0! ft 4 0 #DIV/O! ft 5 0 #DIV/O! ft Piantina Guidelines Ratio of Basin # Min. # Plants Prov. # Trees Prov. # Shrubs ShrubsfTrees 1 79 9 32 3.56 2 17 2 11 5.50 3 0 #DIV/O! 4 0 #DIV/O! 5 0 #DIV/O! (must be 2-3) (must be 2-3) 6� �✓S (must be 2-3) , (must be 2-3) Comments # of Trees + Shrubs Provided: # of Plants (Periwinkle) Provided: 1 41 1 175 2 13 2 50 f INFILTRATION BASIN ANALJPIS p FILENAME: S:1WQS11NBASIN1060412-1.WK1 PROJECT NUMBER: SW8 060412-1 DATE: 04-May-06 PROJECT NAME: McDonald's, Sneads Ferry DRAINAGE BASIN: White Oak REVIEWER: P.Bartlett RECEIVING STREAM: UT Mill Creek CLASS: SA; HQW Index No.: 19-39-3-1 If ORW, is site within the 575' AEC? SITE AREA 0.96 acres IMPERVIOUS AREA CALCULATION BUILDINGS PARKING/ASPHALT CONCRETE OTHER % IMPERVIOUS, 1= DRAINAGE AREA Rational C 3,755 0.95 15,929 0.95 900 0.95 TOTAL ELEVATION OF SEASONAL HIGH WATER TABLE REPORTED INFILTRATION RATE SURFACE AREAS AND ELEVATIONS Place a "1" here if Rational RV= .05+.009 { I } 89 a35s5 FEET MSL 024 INCHES/HOUR or 0.000006 FPS Elev. (ft) Area, sq ft Inc. Volume Acc. Volume BOTTOM 41.5 3,450 41.5 3,450 0 0 2��7 4242y 4,004, 1863.5 1863.St L4�% TOP 42.5 4,526 / 2132.5 3996 VOLUME 1 DEPTH 1 DRAWDOWN CALCULATION DESIGN STORM, INCHES DESIGN VOLUME TOTAL VOLUME AVAILABLE DEPTH OF RUNOFF TIME TO DRAWDOWN 25 YEAR 24 HOUR STORM NIA Intensity, i = .33 inches 1 hour Qr=CiA= Qp through the bottom of the basin= 10 YEAR 10 MIN HIGH INTENSITY EVENT Intensity, i = 6.3 inches 1 hour Volume for 10 yr. 10 min. event = CUBIC FEET CUBIC FEET FEET HOURS MUST BE <120 0.15 CFS 0.02 CFS Must be > Qr 1760.60 CF < 3996 CF COMMENTS Volume and drawdown are (not) within Design Requirements. x INFILTRATION BASIN NALY IS p FILENAME: S:1%VQ/S11NB'�J IN1060 12-2.WK1 �J.����i PROJECT NUMBER: SW8 060412-2 DATE: 04-May-06 PROJECT NAME: McDonald's, Sneads Ferry DRAINAGE BASIN: White Oak REVIEWER: P.Bartlett RECEIVING STREAM: UT Mill Creek CLASS: SA; HOW Index No.: 19-39-3-1 If ORW, is site within the 575' AEC? SITE AREA 0.96 acres DRAINAGE AREA:€€€€€€76:1'JSF IMPERVIOUS AREA CALCULATION Rational C BUILDINGS 0 0.95 PARKING/ASPHALT 6,367 0.95 CONCRETE 0 0.95 OTHER TOTAL Place a "1" here if Rational % IMPERVIOUS, I= `83>7°fk RV= .05+.009 (I) ELEVATION OF SEASONAL HIGH WATER TABLE REPORTED INFILTRATION RATE SURFACE AREAS AND ELEVATIONS Elev. (ft) Area, sq ft BOTTOM 41.5 719 41.5 719 � 42 897 TOP 42.5 1,092 VOLUME 1 DEPTH 1 DRAWDOWN CALCULATION DESIGN STORM, INCHES DESIGN VOLUME TOTAL VOLUME AVAILABLE DEPTH OF RUNOFF TIME TO DRAWDOWN 25 YEAR 24 HOUR STORM NIA Intensity, i = .33 inches 1 hour Or=CiA= Qp through the bottom of the basin= 10 YEAR 10 MIN HIGH INTENSITY EVENT Intensity, i = 6.3 inches I hour Volume for 10 yr. 10 min. event = _55 FEET MSL 'p24 INCHES/HOUR or 0.000006 FPS Inc. Volume Acc. Volume 0 0 404 404_1 497.25 901.25 €.16 90.1 25 fla °62: 0.05 CFS 0.00 CFS Must be > Qr 546.47 CF < 901.25 CF COMMENTS Volume and drawdown are (not) within Design Requirements.