Loading...
HomeMy WebLinkAboutSW8051117_CURRENT PERMIT_20051219STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW �S�l DOC TYPECURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE /°� YYYYMMDD =OF �NAT, 9- Michael F Easley, Governor 1} O G William G Ross, Jr, Secretary North Carolina Department of Environment and Natural Resources Alan W Klimek, P E Director Division of Water Quality December 19, 2005 Mr Perry Bradford Dawson Senior Vice President Waccamaw Bank 110 North Powell Blvd , P O Box 2009 Whiteville, NC 28472 Subject Stormwater Permit No SW8 051117 Waccamaw Bank High Density Project Brunswick County Dear Mr Dawson The Wilmington Regional Office received a complete Stormwater Management Permit Application for Waccamaw Bank on December 12, 2005 Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H 1000 We are forwarding Permit No SW8 051117 dated December 19, 2005, for the construction of the subject project This permit shall be effective from the date of issuance until December 19, 2015, and shall be subject to the conditions and limitations as specified therein Please pay special attention to the Operation and Maintenance requirements in this permit Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P O Drawer 27447, Raleigh, NC 27611-7447 Unless such demands are made this permit shall be final and binding If you have any questions, or need additional information concerning this matter, please contact Paul Bartlett, or me at (910) 796-7215 Sincerely Edw'B�eC Regional Supervisor Surface Water Protection Section ENBlptb S IWQSISTORMWATERIPERMIT1051117 dec05 cc Robert P Balland, El, WK Dickson & Co, Inc Delaney Aycock, Brunswick County Building Inspections Jeff Phillips, Brunswick County Engineering Paul T Bartlett, P E. l ilmington--RegionalzGffice= Central Files North Carolina Ninon of Water Quality 127 Cardinal Dnve Extension Phone (910) 796 7215 Customer Servicel 877-623 6748 Wilmington Regional Office Wilmington NC 28405 3845 FAX (910} 350 2004 Internet h2o enr state nc us One NorthCarohna An Equal OpportumtylAffrmative Action Employer— 50%q Recycied110%a Post Consumer Paper Naturally State Stormwater Management Systems Permit No SW8 051117 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Perry Bradford Dawson and Waccamaw Bank Waccamaw Bank, 4945 Southport -Supply Road, Southport Brunswick County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H 1000 (hereafter referred to as the "stormwaterrules'� and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit This permit shall be effective from the date of issuance until December 19, 2015, and shall be subject to the following specified conditions and limitations I DESIGN STANDARDS 1 This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data 2 This stormwater system has been approved for the management of stormwater runoff as described in Section 16 on page 3 of this permit The stormwater control has been designed to handle the runoff from 42,974 square feet of impervious area 3 The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans There is no allotment for future built -upon area at the site 4 All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans 5 The runoff from all built -upon area within the permitted drainage area of this protect must be directed into the permitted stormwater control system Page 2 of 7 State Stormwater Management Systems Permit No SW8 051117 6 The following design criteria have been provided in the wet detention pond and must be maintained at design condition a DrainaArea, Acres gnslte, ft Offsite, ft2 b Total Impervious Surface,, ft2 Onsite Buildings, It Onsite Parking, ft 2 Onsite SYewalks, ft Offsite, ft c Design Storm, inches d Pond Depth, feet e TSS removal efficiency f Permanent Pool Elevation, FMSL g Permanent Pool Surface Area, ft2 h Permitted Storage Volume, ft3 i Temporary Storage Elevation, FMSL t Controlling Orifice k Permitted Forebay Volume, ft3 1 Receiving Stream/River Basin m Stream Index Number n Classification of Water Body II SCHEDULE OF COMPLIANCE 1 26 46,886 8,000 42,974 6,331 27,052 1,591 8,000 10 40 90% 320 4,832 3,634 3288 0 75" 0 pipe 2,265 Jump and Run Creek 1 Cape Fear 18-88-9-3-2 "SC, Sw" 1 The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface 2 During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately 3 The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to a Semiannual scheduled inspections (every 6 months) b Sediment removal c Mowing and revegetation of slopes and the vegetated filter d Immediate repair of eroded areas e Maintenance of all slopes in accordance with approved plans and specifications f Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping g Access to the outlet structure must be available at all times Page 3 of 7 State Stormwater Management Systems Permit No SW8 051117 4 Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ The records will indicate the date, activity, name of person performing the work and what actions were taken 5 Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria a The fountain must draw its water from less than 2' below the permanent pool surface b Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond c The falling water from the fountain must be centered in the pond, away from the shoreline d The maximum horsepower for a fountain in this pond is 1/8 horsepower 6 The facilities shall be constructed as shown on the approved plans This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data 7 Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation Any deviations from the approved plans and specifications must be noted on the Certification A modification may be required for those deviations 8 If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility 9 Access to the stormwater facilities shall be maintained via appropriate easements at all times 10 The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below a Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc b Project name change c Transfer of ownership d Redesign or addition to the approved amount of built -upon area or to the drainage area e Further subdivision, acquisition, lease or sale of all or part of the project area The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought f Filling in, altering, or piping of any vegetative conveyance shown on the approved plan 11 The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction 12 A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction Page 4 of 7 State Stormwater Management Systems Permit No SW8 051117 13 The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made III GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate The approval of this request will be considered on its merits and may or may not be approved The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request 2 Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215 6A to 143-215 6C 3 The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction 4 In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems 5 The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility 6 The permit maybe modified, revoked and reissued or terminated for cause The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition 7 Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual 8 Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit 9 The permittee shall notify the Division any name, ownership or mailing address changes within 30 days Permit issued this the 19th day of December 2005 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION f E , Director Division of Water Quality By Authority of the Environmental Management Commission Page 5 of 7 State Stormwater Management Systems Permit No SW8 051117 Waccamaw Bank Stormwater Permit No SW8 051117 Page 1 of 2 Brunswick Count Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications The checklist of items on page 2 of this form is included 4n the Certification Noted deviations from approved plans and specification Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No SW8 051117 Page 2 of 2 Certification Requirements 1 The drainage area to the system contains approximately the permitted acreage 2 The drainage area to the system contains no more than the permitted amount of built -upon area 3 All the built -upon area associated with the project is graded such that the runoff drains to the system 4 All roof drains are located such that the runoff is directed into the system 5 The outlet/bypass structure elevations are per the approved plan 6 The outlet structure is located per the approved plans 7 Trash rack is provided on the outlet/bypass structure 8 All slopes are grassed with permanent vegetation 9 Vegetated slopes are no steeper than 3 1 10 The inlets are located per the approved plans and do not cause short- circuiting of the system 11 The permitted amounts of surface area and/or volume have been provided 12 Required drawdown devices are correctly sized per the approved plans 13 All required design depths are provided 14 All required parts of the system are provided, such as a vegetated shelf, and a forebay 15 The required system dimensions are provided per the approved plans cc NCDENR-DWQ Regional Office Delaney Aycock, Brunswick County Building Inspections Jeff Phillips, Brunswick County Engineering Page 7 of 7 OFFICE USE ONLY Date Received Fee Paid Permit Number State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I GENERAL INFORMATION 1 Applicants name (specify the name of the corporation, individual, etc who owns the project) 2 Print Owner/Signing Official's name and title (person legally responsible for facility and compliance) '+ o 3 Mailing Address for person listed in item 2 above IIr���Di City \A1hi'}c,V1 X19 / State N G Zip Z8q-jZ Telephone Number ( 910 ) 91'-i- 424I 4 Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans specifications, letters, operation and maintenance agreements, etc ) Nb 1AC44MA .0 _P AAA 5 Location of Project (street address) 211 City ISOU44nk.00( T, _.. County t=-c Jnswic F._ 6 Directions to project (from nearest major intersection) 7 Latitude W3 $'�'— 1/'i Longitude :7$!- 03,- 10"I of project 8 Contact person who can answer questions about the project tp Name Kd -��L( A,-Jd Telephone Number ( 910 ) -4t02' LIZ 00 II PERMIT INFORMATION ZNew 1 Specify whether project is (check one) Renewal Modification Forn SWU-101 Version 3 99 Page I of 2 If this application is being subm tted as the result of a renewal or modification to an existing permit, list the existing permit number iA- and its issue date (if known) 3 Specify the type of project (check one) Low Density ✓ High Density Redevelop General Permit Other 4 Additional Project Requirements (check applicable blanks) CAMA Major ✓Sedimentation/Erosion Control 404/401 Permit _NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748 III PROJECT INFORMATION 1 In the space provided below, summarize how stormwater will be treated Also attach a detailed narrative (one to two pages) describing stormwater management for the project — -54m my-)&. -zr w al h_ — Go l i cc.;-�J I+6-yw �1 cv Y b i k 1a {ems ow GGC IbSCCc79,4u,i4- SUS�G+ ►rol�z" hltne.V+ `6 tue4 k4J-70n h6sly Stormwater runoff from this project drains to the T t -1r River basin 3 Total Project Area 1.4 acres 4 S;4e, ar4&:) 5 How many drainage areas does the project have?--[--_ Project Built Upon Area J % on -so fe— , cry. "46 Sl fd oLrecL 6 Complete the following information for each drainage area If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below Basin Information Drainage Area 1 Drainage Area 2 Receiving Stream Name Cr Receiving Stream Class SG s W Drainage Area S g` SF Existing Impervious* Area t. I wo -5,F so Proposed Impervious*Area rf 1-- % Impervious* Area (total) .3 Z. Impervious* Surface Area Drainage Area 1 Drainage Area 2 On -site Buildings G 3 3 s On -site Streets On -site Parking 7 0 S 2 S F On -site Sidewalks ISr Other on -site Off -site my Sr Total q SF Total * Impervious area Is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc Form SWU-101 Vernon 3 99 Page 2 of 4 7 How was the off -site impervious area listed above derived?_Af�e'j_ k0�� F' o s IV DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot If lot sizes vary significantly a table listing eoLi lot number size and the allowable built -upon area for each It it -rust be provided as an attachment The following covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality These covenants may not be changed or deleted without the consent of the State No more than square feet of any lot shall be covered by structures or impervious materials Impervious materials include asphalt, gravel, concrete brick stone slate or similar material but do not include wood decking or the water surface of swimming pools 3 Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings 4 Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction 5 All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control system These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State and that they will be recorded prior to the sale of any lot V SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3 99 Page 3 of 4 VI SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ) A complete package includes all of the items listed below The complete application package should be submitted to the appropriate DWQ Regional Office 1 Please indicate that you have provided the following required information by initialing in the space provided next to each item Im als • Original and one copy of the Stormwater Management Permit Application Form • One copy of he applicable Supplement Form(s) for each BMP • Permit application processing fee of$+?"payable to NCDENR) $&ta60.9'0- • Detailed narrative description of Stormwater treatment/management Q • Two copies of plans and specifications, including Development/Project name Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours spot elevations finished floor elevations - Details of roads drainage features, collection systems, and stormwater control measures - Wetlands delineated or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section Designated agent (individual or firm)_I p/�ja,c � 3p i.i_�►�C�+ + Ej, CEGiI'i 111�k bickSaV *Cdtf e�c Mailing Address 90 11/3�1'IC �.T iJke-e-� w City _ W A Mi &a6z _ State _,LUG Zip Phone ( 910 ) -1(,e2- 4126b _ Fax (_9'Ir? ) 2(00- N201 VIII APPLICANT'S CERTIFICATION I (print or type name of person listed In General Information item 2) �f^ACI Ord L7aulSp�v certify that the information included on this permit application form is o the best of my knowledge correct and that the project will be constructed in conformance with the approved plans that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H r� Signature Form SWU-101 Version 3 99 Page 4 of 4 Date /0 I Z-Yle)S_, Permit No ,'S' &:5: (to he provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details I. PROJECT INFORMATION Project Name wgcGq MAW_ 9)iNk Contact Person ?&crV Bred;«d 0Au1S6n, Phone Number 6110 ) °1lq- 41201 For projects with multiple basins, specify which basin this worksheet applies to 1 elevations Basin Bottom Elevation ZB O ft (floor of the basin) Permanent Pool Elevation 32 0 ft (elevation of the orifice) Temporary Pool Elevation 3z , ft (elevation of the discharge structure overflow) areas Permanent Pool Surface Area 832 sq ft (water surface area at the orifice elevation) Drainage Area i • z 6 ac (on -site and off -site drainage to the basin) Impervious Area ate_ ac (on -site and off -site drainage to the basin) volumes Permanent Pool Volume 101 24 cu ft (combined volume of main basin and forebay) Temporary Pool Volume J�(a.3 L' cu ft (volume detained above the permanent pool) Forebay Volume Zt 2 (off cu ft (approximately 20% of total volume) Other parameters SA/DAI 82- (surface area to drainage area ratio from DWQ table) Diameter of Orifice in (2 to S day temporary pool draw -down required) Design Rainfall 1 in Design TSS Removal 2 Rd % (minimum 85% required) Fonr SWU-102 Rev 3 99 Page I of 4 Footnotes When using the Division SA/DA tables, the correct SA/DA ratio for pennanent pool sizing should be computed based upon the actual impervious % and permanent pool depth Linear interpolation should be employed to determine the correct value for non- standard table entries In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal The NCDENR BMP manual provides design tables for both 85% TSS removal and 90% TSS removal IL REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N C Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section 15 A NCAC 2H 1008 Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below If a requirement has not been met, attach Justification. Applicants Initials a b c d e T�_b The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet) The forebay volume is approximately equal to 20% of the basin volume The temporary pool controls runoff from the design storm event The temporary pool draws down in 2 to 5 days If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow calculations) Pik f The basin length to width ratio is greater than 3 1 g The basin side slopes above the permanent pool are no steeper than 3 1 h A submerged and vegetated perimeter shelf with a slope of 6 1 or less (show detail) Vegetative cover above the permanent pool elevation is specified A trash rack or similar device is provided for both the overflow and onfice k A recorded drainage easement is provided for each basin including access to nearest right- of-way 4- 1 If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin in A mechanism is specified which will drain the basin for maintenance or an emergency III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided This system (check one) 0 does�es not incorporate a vegetated filter at the outlet. f This system (check one) 0 does :'does not incorporate pretreatment other than a forebay. Form SWU-102 Rev 3 99 Page 2 of 4 Maintenance activities shall be performed as follows After every significant runoff producing rainfall event and at least monthly a Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition b Check and clear the onfice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed 2 Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed 3 Inspect and repair the collection system (i a catch basins, piping, swales, nprap, etc ) quarterly to maintain proper functioning 4 Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below) Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i e stockpiling near a wet detention basin or stream, etc ) The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments When the permanent pool depth reads 3 O feet in the main pond, the sediment shall be removed When the permanent pool depth reads -3 0_ feet in the forebay, the sediment shall be removed BASIN DIAGRAM (fill in the hlanks) 0 Permanent Pool Elevation 32 Sediment R\Ele al El .O 75 0 -------------- - Sediment Removal Elevation 29• d 75% Bottomahon Z� %---------------------------------- ---------- ------ Bottom Elevation �8 D 25% FOREBAY MAIN POND 5 Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface These plants shall be encouraged to grow along the vegetated shelf and forebay berm 6 If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical Form SWU-102 Rev 3 99 Page 3 of 4 7 All components of the wet detention basin system shall be maintained in good working order I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party Print name rnd i-orclD "Iitle Senunr t?msidenT Address 110 Al. MK. 1�- weLZ 'BIod W odle fi Nc zwilZ Phon Signs Date Note The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president I, J - EfDw4-+ , a Notary Public for the State of County of Y � AA"PyyLr , do hereby certify that H_ "8rcr�_t�e� "�a•ws tnr� personally appeared before me this `->L&�'-day of C.�vbt2 ,20i��, and acknowledge the due execution of the forgoing wet detention basin maintenance requirements Witness my hand and official seal, S e IOTA Rk * CIBL\G SEAL My commission expires �M �+�► a, Zd D Form SWU- l02 Rev 3 99 Page 4 of 4 State Stormwater Management Systems Permit No SW8 051117 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Perry Bradford Dawson and Waccamaw Bank Waccamaw Bank, 4945 Southport -Supply Road, Southport Brunswick County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H 1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit This permit shall be effective from the date of issuance until December 19, 2015, and shall be subject to the following specified conditions and limitations I DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data 2 This stormwater system has been approved for the management of stormwater runoff as described in Section 16 on page 3 of this permit The stormwater control has been designed to handle the runoff from 42,974 square feet of impervious area 3 The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans There is no allotment for future built -upon area at the site 4 All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans 5 The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system Page 2 of 7 State Stormwater Management Systems Permit No SW8 051117 6 The following design criteria have been provided in the wet detention pond and must be maintained at design condition a Drainage Area, acres Onsite, ft Offsite, ft2 b Total Impervious Surface, ft2 Onsite Buildings, It Onsite Parking, ft 2 Onsite SYewalks, ft Offsite, ft c Design Storm, inches d Pond Depth, feet e TSS removal efficiency f Permanent Pool Elevation, FMSL g Permanent Pool Surface Area, ft2 h Permitted Storage Volume, ft3 Temporary Storage Elevation, FMSL I Controlling Orifice k Permitted Forebay Volume, ft3 1 Receiving Stream/River Basin m Stream Index Number n Classification of Water Body 11. SCHEDULE OF COMPLIANCE 42,974 6,331 27,052 1,591 8,000 10 40 90% 320 4,832 3,634 3288 0 75" 0 pipe 2,265 Jump and Run Creek I Cape Fear 18-88-9-3-2 "SC, Sw" 1 The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface 2 During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately 3 The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to a Semiannual scheduled inspections (every 6 months) b Sediment removal c Mowing and revegetation of slopes and the vegetated filter d Immediate repair of eroded areas e Maintenance of all slopes in accordance with approved plans and specifications f Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping g Access to the outlet structure must be available at all times Page 3 of 7 State Stormwater Management Systems Permit No SW8 051117 4 Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ The records will indicate the date, activity, name of person performing the work and what actions were taken 5 Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria a The fountain must draw its water from less than 2' below the permanent pool surface b Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond c The falling water from the fountain must be centered in the pond, away from the shoreline d The maximum horsepower for a fountain in this pond is 118 horsepower 6 The facilities shall be constructed as shown on the approved plans This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data 7 Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation Any deviations from the approved plans and specifications must be noted on the Certification A modification may be required for those deviations 8 If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility 9 Access to the stormwater facilities shall be maintained via appropriate easements at all times 10 The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below a Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc b Project name change c Transfer of ownership d Redesign or addition to the approved amount of built -upon area or to the drainage area e Further subdivision, acquisition, lease or sale of all or part of the project area The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought f Filling in, altering, or piping of any vegetative conveyance shown on the approved plan 11 The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction 12 A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction Page 4 of 7 State Stormwater Management Systems Permit No SW8 051117 13 The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made III GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate The approval of this request will be considered on its merits and may or may not be approved The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request 2 Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215 6A to 143-215 6C 3 The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction 4 In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems 5 The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility 6 The permit may be modified, revoked and reissued or terminated for cause The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition 7 Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual 8 Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit 9 The permittee shall notify the Division any name, ownership or mailing address changes within 30 days Permit issued this the 19th day of December 2005 NORTH OLINA ENVIRONMENTAL MANAGEMENT COMMISSION for a W Klimek, E , Director Division of Water Quality By Authority of the Environmental Management Commission Page 5 of 7 State Stormwater Management Systems Permit No SW8 051117 Waccamaw Bank Stormwater Permit No SW8 051117 Page 1 of 2 Brunswick Count Designer's Certification 1, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the protect construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications The checklist of items on page 2 of this form is included in the Certification Noted deviations from approved plans and specification Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No SW8 051117 Page 2 of 2 Certification Requirements 1 The drainage area to the system contains approximately the permitted acreage 2 The drainage area to the system contains no more than the permitted amount of built -upon area 3 All the built -upon area associated with the project is graded such that the runoff drains to the system 4 All roof drains are located such that the runoff is directed into the system 5 The outlet/bypass structure elevations are per the approved plan 6 The outlet structure is located per the approved plans 7 Trash rack is provided on the outlet/bypass structure 8 All slopes are grassed with permanent vegetation 9 Vegetated slopes are no steeper than 3 1 10 The inlets are located per the approved plans and do not cause short- circuiting of the system 11 The permitted amounts of surface area and/or volume have been provided 12 Required drawdown devices are correctly sized per the approved plans 13 All required design depths are provided 14 All required parts of the system are provided, such as a vegetated shelf, and a forebay 15 The required system dimensions are provided per the approved plans cc NCDENR-DWQ Regional Office Delaney Aycock, Brunswick County Building Inspections Jeff Phillips, Brunswick County Engineering Page 7of7