DETENTION POND ANALYSIS FILE NAME G 1DATAIWPDATAIWQSIPOND1051027 WK1
PROJECT# SW8 051027 REVIEWER P Bartlett
PROJECT NAME The Coves at Newport
Receiving Stream Newport River
Drainage Basin White Oak
DATE 16-Nov-05
Class C
Index No 21-(1)
Site Area 21 67 acres
Drainage Area 91 00 square feet Area = 21 03 acres
IMPERVIOUS AREAS
OS Bldgs
OS Streets
OS Sidewalks
TOTAL
SURFACE AREA CALCULATION
% IMPERVIOUS 61 05%
Des Depth 6
TSS 90
Rational C.
142282 00 square feet 095
397181 00 square feet 095
1976000 square feet 095
square feet
square feet
square feet
22,D square feet
Rational Cc= 066
SAIDA Ratio 3 45%
Req SA 31625 sf
Prov SA 33821 sf
VOLUME CALCULATION * place a "1" in the box if Rational is used
Rational ?*
Des Storm
1,00 inches
Rv=
060
Bottom
27 msl
Perm Pool
msl
Design Pool
35 msl
Design SA
42347 sf
Req Volume
4$ cf
Prov Volume
1504 cf
T !& S 0r+
ORIFICE CALCULATION
Avg Head =
092 ft
Flow Q2, cfs
0 265 cfs
Flow Q5, cfs
0 106 cfs
No of Orifices
1
Diameter, inches
4,00 weir H x W
Drawdown =
13 days
FOREBAY
Perm Pool Volume=
Req Forebay Volume=
Provided Volume=
Percent=
SA @ = 13579
Elevation= 27
Q2 Area =
Q5 Area =
Orifice Area
Q=
in
COMMENTS
Surface Area , Volume and Orifice are within Design Guidelines
130714 MB+ FB
261428
2531800
19.4°�a
33831 42347 00
33 3500
8 27
sq in
3 31
sq in
12 57
sq in
0 402
cfs
x
in
Narrative
Erosion and Sedimentation Control Plan
Stormwater Management Plan
The Coves at Newport
October 17, 2005
Owner:
The Coves at Newport II, Inc.
P.O. Box 1838
Morehead City NC 28557
(252) 725-3360
Engineer: Stroud Engineering, P.A.
151 -A Hwy 24
Morehead City, NC 28557
(252) 247-7479
A. Description of Project
RECEIVED
OCT 2 6 2009
_SWS prlo2
The Coves at Newport is a proposed duplex community with in the Town of Newport The
community is expected to contain 41 duplex residential structures The project site is situated on a
217 tract west of U S Hwy 70 near the hood Lion shopping center
The site has had Land Management Group personnel delineate on -site isolated wetlands which
have been approved by the USCOE Off -Site drainage improvements are expected to impact 404
wetlands on a temporary basis in the amount of 0 14 acres Permanent isolated wetland impact is
estimated at 0 473 acres Land Management Group has assisted in preparing the wetlands impact
documents
The site proposes to utilize a wet -detention pond for stormwater treatment with discharge to an
unnamed tributary to the Newport River, a class C water body
B. Wetlands Permits
A wetlands permit has been applied for, and received from the U S Army Corps of Engineers
Action ID Number 200500278, Dated October 7, 2005
C. Soil Types
Soil types, according to the Carteret County soil maps, are as follow
The project site KBU Kureb Sand, MN Mandarin Sand
The off -site drainage area MU Murville Mucky Sand, LN Leon Sand
D. Erosion and Sedimentation Control Measures
The following measures are proposed for the site If it becomes evident that additional erosion
and sedimentation control measures are needed, they shall be installed immediately It is intended
that all grading and excavation activities within a certain area will be protected as soon as that
activity is completed
1 Sediment Fence — Sediment fence will be utilized as necessary in locations as shown on plans
or as deemed necessary by the engineer to insure that off -site sedtmentation is controlled
2 Seeding — All disturbed areas will be seeded within 14 days following construction in
accordance with the seeding schedule shown on the plans
3 Stone Construction Entrance — Stone construction entrance will be used to reduce transport of
sediment off site
Maintenance PIan
All erosion and sediment control measures shall be checked for stability and effective
operations following every runoff producing rainfall event or at least once per week Repairs
required shall be completed immediately to the dimension and functions indicated on the
plans
Sediment shall be removed form behind the sediment fencing when it becomes 0 5 feet deep
at the fence The fence shall be replaced or repaired as necessary to maintain a barrier
All seeded areas shall be fertilized, seeded and mulched within 15 days of disturbance
Disturbed areas shall be fertilized, reseeded and mulched as necessary according to the
Contract documents to establish and maintain a dense vegetative cover
Construction Sequence
1 Clear and grub site
2 Install stone construction entrance
3 Install silt fencing as shown on plans, within areas of construction Construct stormwater
pond and seed, utilize as sediment storage, install outlet structure
4 Muck and fill existing ditches as shown on plans
5 Rough grade site, seed all areas that are brought to final grade
b Install utilities
7 Begin unit construction
8 Install curb and gutter, drainage outlet flumes, and place CABC
9 Pave Streets
10 Perform final seeding and mulching
1 I Remove temporary sediment traps
E. Design Assumptions
1 Design storm is ten years
2 The rational method was used for the design
F. Coastal Stormwater Regulations
The North Carolina Division of Environmental Management implemented coastal stormwater
regulations in coastal counties on January 1, 1988 These regulations are detailed in 15 NCAC
2H 1000 Stormwater Management These rules allow for a development to be considered under
various options This project is submitted for approval consideration under Section 1003(d)(2)
high density projects