HomeMy WebLinkAboutSW8051012_COMPLIANCE_20060504STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW Lof XB1A
DOC TYPE
❑CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
�7 COMPLIANCE EVALUATION INSPECTION
C
DOC DATE
W2�9Xo0 Vd,
YYYYMMDD
WET DETENTION POND ANALYSIS
FILE NAME S IWQSIPONDX051012 WK1
PROJECT # SWS 051012 REVIEWER L Lewis
PROJECT NAME
Noland Properties
DATE 04-May-06
Lot 1 Royal Creek
IP (SW8 000308)
Receiving Stream
UT New River
Class
Drainage Basin
White Oak
Index No
Site Area
261 acres
Drainage Area
119711 00 square
feet Area in Acres
275
Onsite DA
114654 Offsite DA
505400
IMPERVIOUS AREAS
Rational C
Buildings
1000000 square feet
Parking
4271900 square feet
SW rr,,
203400 square feet
-L"erbce55R4
411600 square feet
Future
100000 square feet
Offsite street
492200 square feet
112 of Frontier Way
square feet
TOTAL 1111,11111
64791 00,
square feet
Rational Cc= 009
SURFACE AREA CALCULATION
% IMPERVIOUS
54 12%
SA/DA Ratio
3 83%
Des Depth
5
Req SA
4585 sf
TSS
90
Prov SA
5011 sf
VOLUME CALCULATION * place a "1" in the box if Rational is used
Rational ?*
Des Storm
;,'',,,;
;100
inches
Rv=
0 537
Bottom
365 msl
Perm Pool
d 111 l',I
401 S0
msl
Design Pool
41 52 msl
Storage met @elev
4146 msl
Req Volume �li'llll',�' 5358 jcf
Vol Prov at DP �'11 ,1'`i 5664 jcf
ORIFICE CALCULATION
FOREBAY
Perm Pool Volume=
9713
Req Forebay Volume=
19426
Provided Volume=
204300
Percent=
1121' 0%Ili!II1il1'
Elevation Area
Inc Vol Acc Vol
4050 5011 00
000
4152 609400
566355 566355
Avg Head =
049
ft
Q2 Area = 1 33
sq
inches
Flow I cfs
0 031
cfs
Q5 Area = 0 53
sq
inches
Flow Q5, cfs
0 012
cfs
Orifice Area 0 79
sq
inches
No of Orifices
i lli h 1
Q= 0 018
cfs
Diameter, inches
weir H x W
jlIli '1'1'141'11' Id l
in x
in
Drawdown =
„',,,,, 13'4
days
Surface Area @DP =
6094 sq ft
Falling Head Drawdown =
4 9 days
C 331
L= -0 098
COMMENTS
Surface Area, Volume and Orifice are within Design Guidelines
RECETVED
MAR 0 2 2006
�ROd #
S W SO��-
1 PROJECT DESCRIPTION
Design Calculations
Stormwater Treatment Facilities
for
Noland Properties, Inc.
located In
Jacksonville, N.C.
III 111 1
CA o�
QPOF
S ,a[_ _
1 48
The Project consists of a proposed businesses on a 2 47 acre tract and associated sitework
2 COMPUTE POND AREA REQUIRED
a Compute Percent Impervious
Impervious Areas
On -Site Buildings
On -Site Streets
On -Site Parking
On -Ste Sidewalks
Other on -site
Off -site
Sub -Total
FUTURE
FUTURE(reserved)
Total
Total Area Drainage to Pond
Percent Impervious =
b Compute Pond Surface Area
Existing Propsed
Total
10,000 SF
,y4021' cfv;u u}t
4,922 SF
42,719 SF
2,034 SF
4,116
y} ivi$r`Jv�tV�rt+{��i},�Yv
0
Jn ry}
4,922 58,869
63,791 SF
0� 1,000 1,000 SF
0 59,869 64,791 SF
119,711 SF
0 541 or 541 %
Using Surface Area to Drainage Area Ratio Chart for 90% TSS Removal (copy attached) and
assuming ;;} ry;;°„ ;{foot pond depth
SAIDA% (interpolated)
Therefore
Surface Area = SAIDA x Drainage Area
4,683 SF say '„ >„ 5,[ 1,1 SF
I
0
c Compute Minimum Pond Dimensions
Assume rectangular shape with 3 1 Length (L) to Width (W) Ratio
Length = 122 61 feet
Width = 40 87 feet
Site conditions, however, dictate
Hydr Length =�Yas ' { '$ feet
so, Hydr Width 36 0 feet (avg)
Actual L/W = 3 9 (irregular shape)
3 DETERMINE VOLUME TO BE CONTROLLED FROM 1" STORM
Using Schuler "Simple Method"
Rv = 0 05 + 0 009(I) where I = percent impervious
Rv = 0 537 in/in
Control Volume = Design Rainfall x Rv x Drainage Area
Control Volume = 5,358 CF say'} #1# CF
4 DETERMINE REQUIRED STORAGE DEPTH
Assume 3 1 side slopes
solving for depth (d) by trial & error
d= 101
5. DETERMINE ORIFICE SIZE
Control Volume must be drawn down over a 2 day - 5 day period
Using orifice equation, solve for Diameter (D) that results in 3-1/2 day period
D=(Q/0026(h)5)5
Where Q = (Control Volume / 3 5 days x 86,400 sec/day)
0 019 cfs
h= d / 2
=051
Solving for D
D = 100 Use `w s. `uv,v," pipe
Actual Drawdown with actual drawdown pipe diameter (using orifice equation)
Q= 0 018 cfs
Draw Down Period = 3 51 days OK, < 5 0
6 SELECT OUTLET STRUCTURE DIAMETER
Size outlet structure such that depth of Q10 flow <1 0 feet
Using Rational Formula (Q=CIA) where
Cimper r Y v}n
Cpery
Ccum = 050
i4 C}
A = 2 75 ac
Q10 = 9 85 cfs
Assuming 112 circumference is used as weir and using
Francis Formula (Q=3 331-1-11' S) to solve for L such that H = 1 0
L = 2 96 Feet
Min 24 inch diameter outlet structure
Use 36 inch diameter outlet structure
7 DETERMINE Q10 STAGE
010 = 9 85 cfs
Using Francis Formula (Q=3 33LH' S) solve for H
H 10 = 0 73 feet
8 DETERMINE Q100 STAGE (ELEV OF EMERGENCY SPILLWAY)
Using Rational Formula (Q=CIA) where
Ccum = 050
1100 _;, m/hr
A= 275 ac
Q100 = 1168
Using Francis Formula (Q=3 331-114 5) solve for H
i
H 100 = 0 82 feet
9 DETERMINE 0100 STAGE OVER EMERGENCY SPILLWAY (TOP BERM ELEV )
Assume primary spillway blocked (i e , emergency spillway to accommodate Q100)
Emergency spillway shall be a broad crested earthern weir designed to pass 100 year storm
Using broad crested weir equation H = (Q/Cw x Lr
where Q = Q100 11 68 cfs
Cw=30
Length - nV `5 $ " z'' feet
H = 0 26 feet
10 FOREBAY SIZING
Compute Actual Pond Volumes (using average end method)
Avg
Incr
Incr
Cum
Main Bay Volume .
Pond Bottom
Elevation Area
3660
(SF l Ama
216
(SF Depth
(FT
Vol (CE
Vol (CE
Bottom Veg Shelf
3883
4,613
865
333
2,879
2,879
Normal Pond
40,50
4,226
2,870
1 67
4,792
7,671
Main Bay Volume =
7,671 CF
Forebay Volume,
Pond Bottom
Elevation Area
3550
(SF 1 Area
�2
-(SF l Depth
(FT l
Vol (CF l
Vol (CF}
Normal Pond
4050
786
400
500
2,043
2,043
Forebay Volume =
2,043 CF
Total Pond Volume =
9,713 CF
Forebay Volume equates to
21 0 % of
Total Volume
Imp. Storage Volume,
Normal Pond
Elevation Area
4050
(SF] Area
5,011
(SF De
tAhh (FT)
Vol (CE
Vol (CE
Temp Pond Level
4tU
6A4
5,553
1 02
5,664
5,664
Temp Pool Volume =
5,664 CF
Elution Area
(SF) Area
(SE)Depth
(FT)
Vol (CF)
Vol (CF-)
Temp Pond Level
4152
6,094
Temp Pond Level
42,25
61683
5,839
073
4,281
4,281
Temp Pool Volume =
100 Yr Storage Volume .
Temp Pond Level
Temp Pond Level
Temp Pool Volume =
11 SUMMARY
Pond Elevations
Top Berm (minimum)
100-Yr Flood
10-Yr Flood
1-inch Storage
4,281 CF
Elevation Area -(SF } Area (SE Depth (FT) Vol (CF) Vol (CF)
4152 6,094
42,$4 -6,601 5,878 082 4,828 4,828
4,828 CF
H= 0 26
H100 = 0 82
H10= 073
storage depth = 102
Permanent Pool
pond depth = 5
Pond Bottom
12 WET DETENTION BASIN SUPPLEMENT
Basin Bottom Elevation
3550
Perm Pool Elevation
4050
Temp Pool Elevation
41 52
Perm Pool Surface Area
5,011 SF
Drainage Area
2 75 AC
Impervious Area
1 49 AC
Perm Pool Volume
9,713 CF
Temp Pool Volume
5,664 CF
Forebay Volume
2,043 CF
SAIDA
39123
Diameter of Orifice
100
Design Rainfall
1"
Relative Awl
710
4260
684
42 34 (emerg weir elev)
076
4225
602
4152 (primary weir elev)
600
40 50 (invert out elev)
0 tiv+ vu}
Wf } JYnti Y k
I
Design TSS Removal
r
90%
N