HomeMy WebLinkAboutSW8050301_CURRENT PERMIT_20050303STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW L
DOC TYPECURRENT
PERMIT
APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
�Rx50�jD�
YYYYMMDD
Michael F. Easley, Governor
William G. Ross, Jr„ Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
Division of Water Quality
March 9, 2005
Mr. Al Willis, President
South Brunswick Investments, Inc.
5296 Main Street
Shallotte, NC 28459
Subject: Stormwater Permit No. SW8 050301
Willis Storage
High Density Project
Brunswick County
Dear Mr. Willis:
The Wilmington Regional Office received a complete Stormwater Management Permit
Application for Willis Storage on March 9, 2005. Staff review of the plans and specifications
has determined that the project, as proposed, will comply with the Stormwater Regulations set
forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 050301 dated March 9,
2005, for the construction of the subject project.
This permit shall be effective from the date of issuance until March 9, 2015, and shall be
subject to the conditions and limitations as specified therein. Please pay special attention to
the Operation and Maintenance requirements in this permit. Failure to establish an adequate
system for operation and maintenance of the stormwater management system will result in
future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have
the right to request an adjudicatory hearing upon written request within thirty (30) days
following receipt of this permit. This request must be in the form of a written petition,
conforming to Chapter 150E of the North Carolina General Statutes, and filed with the Office of
Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands
are made this permit shall be final and binding.
If you have any questions, or need additional information concerning this matter, please
contact Paul Bartlett, or me at (910) 395-3900.
Sincere) ,
Ed Beck - .
Acting Regional Supervisor
Surface Water Protection Section
ENB/ptb: S:IWQSISTORMWATERIPERMIT1050301
cc: Phillip G', Tripp, P.E., Tripp Engineering, P.C.
Delaney Aycock, Brunswick County Building Inspections
Division of Coastal Management
Paul Bartlett
Wilmington Regional Office
Central Files
North Carolina Division of Water Quality 127 Cardinal Drive Extension Phone (910) 395-3900 Customer Service 1-877-623-6748
Wilmington Regional Office Wilmington, NC 28405-3845 FAX (910) 350-2004 Internet: h2c enr.state.nc.us pnrth e
An Equal OpportunitylAffirmative Action Employer — 50% Recycled110% Post Consumer Paper NO �lTtlflYlmma l i l
llll
State Stormwater Management Systems
Permit No. SW8 050301
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of
North Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
At Willis and South Brunswick Investments, Inc.
Willis Storage
Brunswick County
FOR THE
construction, operation and maintenance of a wet detention pond in compliance with
the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules"}
and the approved stormwater management plans and specifications and other
supporting data as attached and on file with and approved by the Division of Water
Quality and considered a part of this permit.
This permit shall be effective from the date of issuance until March 9, 2015, and shall
be subject to the following specified conditions and limitations:
I. DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater
runoff as described in Section 1.6 on page 3 of this permit. The stormwater
control has been designed to handle the runoff from 147,418 square feet of
impervious area.
3. The tract will be limited to the amount of built -upon area indicated on page 3 of
this permit, and per approved plans.
4. All stormwater collection and treatment systems must be located in either
dedicated common areas or recorded easements. The final plats for the project
will be recorded showing all such required easements, in accordance with the
approved plans.
5. The runoff from all built -upon area within the permitted drainage area of this
project must be directed into the permitted stormwater control system.
Page 2 of 7
State Stormwater Management Systems
Permit No. SW8 050301
6. The following design criteria have been provided in the wet detention pond and
must be maintained at design condition:
a. Drainage Area, acres:
Onsite, ft :
Offsite, ft2:
b. Total Impervious Surfaces, ft2:
C. Design Storm, inches:
d. Pond Depth, feet:
e. TSS removal efficiency:
f. Permanent Pool Elevation, FMSL
g. Permanent Pool Surface Area, ft2
h. Permitted Storage Volume, ft3:
Temporary Storage Elevation, FMSL
j. Controlling Orifice:
k. Permitted Forebay Volume, ft3:
1. Receiving Stream/River Basin-
M. Stream Index Number:
n. Classification of Water Body
If. SCHEDULE OF COMPLIANCE
5.4
235,224
0
147,418
1.0
6.0
90%
25.0
14,027
33,026
27.0
1.25"0 pipe
9,663
Shallotte River 1 Lumber River
15-25-2-(1)
"C;Sw, HQW"
1. The stormwater management system shall be constructed in its entirety,
vegetated and operational for its intended use prior to the construction of any
built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of
the system will be repaired immediately.
3. The permittee shall at all times provide the operation and maintenance
necessary to assure the permitted stormwater system functions at optimum
efficiency. The approved Operation and Maintenance Plan must be followed in
its entirety and maintenance must occur at the scheduled intervals including, but
not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and revegetation of slopes and the vegetated filter.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and
specifications.
f. Debris removal and unclogging of outlet structure, orifice device, flow
spreader, catch basins and piping.
g. Access to the outlet structure must be available at all times.
Page 3 of 7
State Stormwater Management Systems
Permit No. SW8 050301
4. Records of maintenance activities must be kept and made available upon
request to authorized personnel of DWQ. The records will indicate the date,
activity, name of person performing the work and what actions were taken.
5. Decorative spray fountains will be allowed in the stormwater treatment system,
subject to the following criteria:
a. The fountain must draw its water from less than 2' below the permanent
pool surface.
b. Separated units, where the nozzle, pump and intake are connected by
tubing, may be used only if they draw water from the surface in the
deepest part of the pond.
c. The falling water from the fountain must be centered in the pond, away
from the shoreline.
d. The maximum horsepower for a fountain in this pond is 116 horsepower.
6. The facilities shall be constructed as shown on the approved plans. This permit
shall become voidable unless the facilities are constructed in accordance with
the conditions of this permit, the approved plans and specifications, and other
supporting data.
7. Upon completion of construction, prior to issuance of a Certificate of Occupancy,
and prior to operation of this permitted facility, a certification must be received
from an appropriate designer for the system installed certifying that the permitted
facility has been installed in accordance with this permit, the approved plans and
specifications, and other supporting documentation. Any deviations from the
approved plans and specifications must be noted on the Certification. A
modification may be required for those deviations.
8. If the stormwater system was used as an Erosion Control device, it must be
restored to design condition prior to operation as a stormwater treatment device,
and prior to occupancy of the facility.
9. Access to the stormwater facilities shall be maintained via appropriate
easements at all times.
10. The permittee shall submit to the Director and shall have received approval for
revised plans, specifications, and calculations prior to construction, for any
modification to the approved plans, including, but not limited to, those listed
below:
a. Any revision to any item shown on the approved plans, including the
stormwater management measures, built -upon area, details, etc.
b. Project name change.
c. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area or to the
drainage area.
e. Further subdivision, acquisition, lease or sale of all or part of the project
area. The project area is defined as all property owned by the permittee,
for which Sedimentation and Erosion Control Plan approval or a CAMA
Major permit was sought.
f. Filling in, altering, or piping of any vegetative conveyance shown on the
approved plan.
11. The permittee shall submit final site layout and grading plans for any permitted
future areas shown on the approved plans, prior to construction.
12. A copy of the approved plans and specifications shall be maintained on file by
the Permittee for a minimum of ten years from the date of the completion of
construction.
Page 4 of 7
State Stormwater Management Systems
Permit No. SW8 050301
13. The Director may notify the permittee when the permitted site does not meet one
or more of the minimum requirements of the permit. Within the time frame
specified in the notice, the permittee shall submit a written time schedule to the
Director for modifying the site to meet minimum requirements. The permittee
shall provide copies of revised plans and certification in writing to the Director
that the changes have been made.
Ill. GENERAL CONDITIONS
This permit is not transferable except after notice to and approval by the Director.
In the event of a change of ownership, or a name change, the permittee must
submit a formal permit transfer request to the Division of Water Quality,
accompanied by a completed name/ownership change form, documentation
from the parties involved, and other supporting materials as may be appropriate.
The approval of this request will be considered on its merits and may or may not
be approved. The permittee is responsible for compliance with all permit
conditions until such time as the Division approves the transfer request.
2. Failure to abide by the conditions and limitations contained in this permit may
subject the Permittee to enforcement action by the Division of Water Quality, in
accordance with North Carolina General Statute 143-215.6A to 143-215.6C.
3. The issuance of this permit does not preclude the Permittee from complying with
any and all statutes, rules, regulations, or ordinances, which may be imposed by
other government agencies (local, state, and federal) having jurisdiction.
4. In the event that the facilities fail to perform satisfactorily, including the creation
of nuisance conditions, the Permittee shall take immediate corrective action,
including those as may be required by this Division, such as the construction of
additional or replacement stormwater management systems.
5. The permittee grants DENR Staff permission to enter the property during normal
business hours for the purpose of inspecting all components of the permitted
stormwater management facility.
6. The permit may be modified, revoked and reissued or terminated for cause. The
filing of a request for a permit modification, revocation and reissuance or
termination does not stay any permit condition.
7. Unless specified elsewhere, permanent seeding requirements for the stormwater
control must follow the guidelines established in the North Carolina Erosion and
Sediment Control Planning and Design Manual.
8. Approved plans and specifications for this project are incorporated by reference
and are enforceable parts of the permit.
9. The permittee shall notify the Division any name, ownership or mailing address
changes within 30 days.
Permit issued this the 9th day of March 2005.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
,z.Alan W. Klimek, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
Page 5 of 7
State Stormwater Management Systems
Permit No. SW8 050301
Willis Storage
Stormwater Permit No. SW8 050301
Brunswick County
Designer's Certification
I, , as a duly registered
in the State of North Carolina, having been authorized to observe (periodically/ weekly/
full time) the construction of the project,
(Project)
for (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specification:
Signature
Registration Number
Date
SEAL
Page 6of7
State Stormwater Management Systems
Permit No. SW8 050301
Certification Requirements:
1. The drainage area to the system contains approximately the permitted
acreage.
2. The drainage area to the system contains no more than the permitted
amount of built -upon area.
3. All the built -upon area associated with the project is graded such that the
runoff drains to the system.
4. All roof drains are located such that the runoff is directed into the system.
5. The outlet/bypass structure elevations are per the approved plan.
.6. The outlet structure is located per the approved plans.
7. Trash rack is provided on the outlet/bypass structure.
8. All slopes are grassed with permanent vegetation.
9. Vegetated slopes are no steeper than 3:1.
10. The inlets are located per the approved plans and do not cause short-
circuiting of the system.
11. The permitted amounts of surface area and/or volume have been
provided.
12. Required drawdown devices are correctly sized per the approved plans.
13. All required design depths are provided.
14. All required parts of the system are provided, such as a vegetated shelf,
and a forebay.
15. The required system dimensions are provided per the approved plans.
cc: NCDENR-DWQ Regional Office
Delaney Aycock, Brunswick County Building Inspections
Page 7of7
......... ........ ....... ,.;:.::;::>,:
r I ::::
Date Received
Fee Paid
Permit Number
-3-1-05
a al d? ,
SW o. 3 0
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM \
This form may be photocopied for use as an original
I. GENERAL INFORMATION
1, Applicants name (specify the name of the corporation, individual, etc. who owns the project):
South Brunswick Investments Inc.
2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance):
Al Willis / President
3. Mailing Address for person listed in item 2 above:
5296 Main Street
City: Shallotte State: NC Zip: 28459
Telephone Number: 910443-2020
4. Project Name (subdivision, facility, or establishment name -- should be consistent with project name on
plans, specifications, letters, operation and maintenance agreements, etc.):
Willis Storage
5. Location of Project (street address):
between NC 179 and SR 1173
City: Shallotte County: Bnmswick
6. Directions to project (from nearest major intersection):
Approximately 1.5 miles south from the intersection of US Hwy 17 and NC 179. Site is on the right.
7. Latitude : N 330 58' 00" Longitude: W 780 24' 00" of project
8. Contact person who can answer questions about the project:
Name: Phillip TrippTelephone Number: 910-763-5100
H. PERMIT INFORMATION:
1. Specify whether project is (check one): X New Renewal Modification
Form SWU-101 Version 3.99 Page 1 of 4
\\
i
. .. �r'i„ ,. E,.e. ASS,., i' .:E"'� 'i�• '<. ... .,. ri"` .a,. .� ..
r '^ 4• q,. rl • { "ti ^ • r � , t •r. '!i . �+ . -. 1'. � W N..i i' . w o.
' is � .. .. ., ,/ • �'! .. r '�f ... . I: .. 1., ! .... r� 1' ! J , . . 1 ` f
2. If this application is being submitted as the result of a renewal or modification to an existing permit, list
The existing permit number NA and its issue date (if known)
3. Specify the type of project (check one):
Low Density X High Density Redevelop General Permit Other
4. Additional Project Requirements (check applicable blanks):
CAMA Major X Sedimentation/Erosion Control 404//401 Permit NPDES Stormwater
Information on required state permits can be obtained by contacting the Customer Service Center at
l-877-623-6748.
III. PROJECT INFORMATION
N
1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative
(one to two pages) describing stormwater management for the project.
wet detention pond
2. Stormwater runoff from this project drains to the Lumber River basin.
3. Total Project Area: 5.4 _ acres 4. Project Built Upon Area: 62.6 %.
5. How many drainage basins does the project have? 1
6. Complete the following information for each drainage area. If there are more than two drainage areas in the
project, attach an additional sheet with the information for each area provided in the same format as below.
Receiving Stream Name Shallotte River
Receiving Stream Class C-SW, H-QW
Drainage Basin Area 5.4 ac.
Existing Impervious * Area -
Proposed Impervious * Area 3.38 ac.
% Impervious* Area (total) 62.6%
..
9ut;Ar:.D3assn°>:1 1 s.
On -site Buildings 50,475 sf
On -site Streets 23,926 sf
On -site Parking 71,967 sf
On -site Sidewalks 1,050 sf
Other on -site
Off -site
Total: '2=147,418 sf_
* Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking
areas sidewalks, gravel areas, etc.
Form SWU-101 Version 3.99 Page 2 of 4
• � •� ��.
- ti ` '
.. � _ i ' r _
- � � '_ _ 1 t
s ._ �-4. - — ...
' 4 _ � -_. ..� -
_ � S
mil. -� - � ... �-: vw t _ - _• ..
7. How was the off -site impervious area listed above derived?
NA
IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS
The following italicized deed restrictions and protective covenants are required to be recorded for all
subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a
table listing each lot number, size and the allowable built -upon area for each lot must be provided as an
attachment.
The following covenants are intended to ensure ongoing compliance with state stormwater management permil
number as issued by the Division of Water Quality. These covenants Wray
not be changed or deleted without the consent of the State.
2. No more than square feet of wiy lot shall be covered by structures of impervious materials.
Impervious materials include asphalt, gravel, concrete, brick stone, slate or similar material but do not include wood
decking or the water surface of shimming pools.
3. Swales shall not be filled in, piped or allered except as necessary to provide driveway crossings,
4. Built -upon area in excess of the permitted amount requires a stale stormwater management permit modificalion prior
to construction.
5. tlll permitted runoff from oulparcels or future development shall be directed into the permitted stormwater control
System. These connections to the stormwater control system shall be performed in a manner that maintains the
integrity and performance of the system as permitted.
By your signature below, you certify that the recorded deed restrictions and protective covenants for this project
shall include all the applicable items required above, that the covenants will be binding on ail parties and
persons claiming under them, that they will run with the land, that the required covenants cannot be changed or
deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot.
V. SUPPLEMENT FORMS
The applicable state stormwater management permit supplement form(s) listed below must be submitted for
each BMP specified for this project. Contact the Stormwater and General Permits Unit at (910) 733-5083 for
the status and availability of these forms.
Form SWU-102
Wet Detention Basin Supplement
Form SWU-103
Infiltration Basin Supplement
Form SWU-104
Low Density Supplement
Form SWU-105
Curb Outlet System Supplement
Form SWU-106
Off -Site System Supplement
Form SWU-107
Underground Infiltration Trench Supplement
Form SWU-108
Neuse River Basin Supplement
Form SWU-109
Innovative Best Management Practice Supplement
Form SWU-101 Version 3.99 Page 3 of
VI. SUBMITTAL REQUIREMENTS
Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ).
A complete package includes all of the items listed below. The complete application package should be
submitted to the appropriate DWQ Regional Office.
i . Please indicate that you have provided the following required information by initialing in the space
provided next to each item.
Applicant's Initials
• Original and one copy of the Stormwater Management Permit Application Form
• One copy of the applicable Supplement Form(s) for each BMP
• Permit application processing fee of $420 (payable to NCDENR)
• Detailed narrative description of stormwater treatment/management
• Two copies of plans and specifications, including:
Development/Project name
Engineer and firm
Legend
North arrow
Scale
- Revision number and date
Mean high water line
Dimensioned property/project boundary
Location map with named streets or NCSR numbers
- Original contours, proposed contours, spot elevations, finished floor'elevations
Details of roads, drainage features, collection systems, and stormwater control measures
Wetlands delineated, or a note on plans that none exist
Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations
- Drainage areas delineated
Vegetated buffers (where required)
Vll. AGENT AUTHORIZATION
If you wish to designate authority to another individual or firm so that they may provide information on your
behalf, please complete this section.
Designated agent (individual or firm): Tripp Engineering,P.C.
Mailing Address: 419 Chestnut Street
City: Wilmington State: NC Zip: 28401
Phone: _ (�63-5100 Fax: 910 763-5631
VIII. APPLICANT'S CERTIFICATION
1, (print or type name ofperson listed in General Information, item 2) Al Willis ,
certify that the information included on this permit application form is, to the best of my knowledge, correct and
that the project will be constructed in conformance with the approved plans, that the required deed restrictions
and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A
NCAC 2H .1000.
Signature: 61? • � Date: 02 `� �5
Form SWIG-101 Version 3.99 Page 4 of