HomeMy WebLinkAboutSW8041220_CURRENT PERMIT_20050512 (2)STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SWg)4IMo
DOC TYPE
61 CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
�Sl�
YYYYMMDD
STORMWATER DIVISION CODING SHEET
NCG PERMITS
PERMIT NO.
/V
DOC TYPE
❑ HISTORICAL FILE
❑ MONITORING REPORTS
DOC DATE
❑
YYYYMMDD
fi
IVA'TE94) Michael F. Easley, Governor
�p G. William G. Ross, Jr., secretary
7 North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
Division of Water Quality
May 12, 2005
Mr. and Mrs. Tommy Adams
2282 Piney Green Road
Midway Park, NC 28544
Subject: Stormwater Permit No. SW8 041220
Adams Mini Storage
High Density Project
Qnslow County
Dear Mr. and Mrs. Adams:
The Wilmington Regional Office received a complete Stormwater Management Permit
Application for Adams Mini Storage on April 29, 2005. Staff review of the plans and
specifications has determined that the project, as proposed, will comply with the Stormwater
Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 041220
dated May 12, 2005, for the construction of the subject project.
This permit shall be effective from the date of issuance until May 12, 2015, and shall be
subject to the conditions and limitations as specified therein. Please pay special attention to
the Operation and Maintenance requirements in this permit. Failure to establish an adequate
system for operation and maintenance of the stormwater management system will result in
future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have
the right to request an adjudicatory hearing upon written request within sixty (60) days
following receipt of this permit.. This request must be in the form of a written petition, -
conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of
Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands
are made this permit shall be final and binding.
If you have any questions, or need additional information concerning this matter, please
contact Linda Lewis, or me at (910) 395-3900,
Since y,
Edward Beck
Acting Regional Supervisor
Surface Water Protection Section
ENBlarl: S:IWQSISTORMWATIPERMIT1041220.may05
cc: Joseph Dunnehoo, P.E., Oceanside Engineering
Onslow County Building Inspections
Linda Lewis
Wilmington Regional Office
Central Files
North Carolina Division of Water Quality 127 Cardinal Drive Extension Phone (910) 395-3900 Customer Service 1-877$2N748
Wilmington Regional Office Wilmington, NC 28405-3845 FAX (919) 733-2496 Internet: h2o.enr.state.nc.us One
NorthCaro/llina
An Equal Opportunity/Affirmafive Action Employer— 50% Recycledl10%a Post Consumer Paper lVaturally
State Stormwater Management Systems
Permit No. SW8 041220
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of
North Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Tommy and Tammy Adams
Adams Mini Storage
2282 Piney Green Road, Midway Park, Onslow County
FOR THE
construction, operation and maintenance of a wet detention pond in compliance with
the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules')
and the approved stormwater management plans and specifications and other
supporting data as attached and on file with and approved by the Division of Water
Quality and considered a part of this permit.
This permit shall be effective from the date of issuance until May 12, 2015, and shall be
subject to the following specified conditions and limitations:
I. DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater
runoff as described in Section 1.6 on page 3 of this permit. The stormwater
control has been designed to handle the runoff from 136,333 square feet of
impervious area.
3. The tract will be limited to the amount of built -upon area indicated on page 3 of
this permit, and per approved plans.
4. All stormwater collection and treatment systems must be located in either
dedicated common areas or recorded easements. The final plats for the project
will be recorded showing all such required easements, in accordance with the
approved plans.
5. The runoff from all built -upon area within the permitted drainage area of this
project must be directed into the permitted stormwater control system.
Page 2 of 7
State Stormwater Management Systems
Permit No. SW8 041220
R
The following design criteria have been provided in the wet detention pond and
must be maintained at design condition:
a.
Draina a Area, acres:
gnsite, ft2:
4.67
203,241
Offsite, ft .
0
b.
Total Impervious Surfaces, ft2:
136,333
C.
Design Storm, inches:
1
d.
Pond Depth, feet:
4.0
e.
TSS removal efficiency:
85%
f.
Permanent Pool Elevation, assumed:
94.0
g.
Permanent Pool Surface Area, ftZ:
10,146
h.
Permitted Storage Volume, ft3:
11,522
i.
Temporary Storage Elevation, assumed:95.0
j. Controlling Orifice:
k. Permitted Forebay Volume, ft3:
1. Receiving Stream/River Basin:
M. Stream Index Number:
n. Classification of Water Body:
ll. SCHEDULE OF COMPLIANCE
1.5"0 pipe
6,200
Motts Creek / White Oak
WOK02 19-16-3
"C; NSW"
1. The stormwater management system shall be constructed in its entirety,
vegetated and operational for its intended use prior to the construction of any
built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of
the system will be repaired immediately.
3. The permittee shall at all times provide the operation and maintenance
necessary to assure the permitted stormwater system functions at optimum
efficiency. The approved Operation and Maintenance Plan must be followed in
its entirety and maintenance must occur at the scheduled intervals including, but
not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and revegetation of slopes and the vegetated filter.
d. immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and
specifications.
f. Debris removal and unclogging of outlet structure, orifice device, flow
spreader, catch basins and piping.
g. Access to the outlet structure must be available at all times.
Page 3 of 7
State Stormwater Management Systems
Permit No. SW8 041220
4. Records of maintenance activities must be kept and made available upon
request to authorized personnel of DWQ. The records will indicate the date,
activity, name of person performing the work and what actions were taken.
5. Decorative spray fountains will be allowed in the stormwater treatment system,
subject to the following criteria:
a. The fountain must draw its water from less than 2' below the permanent
pool surface.
b. Separated units, where the nozzle, pump and intake are connected by
tubing, may be used only if they draw water from the surface in the
deepest part of the pond.
c. The falling water from the fountain must be centered in the pond, away
from the shoreline.
d. The maximum horsepower for a fountain in this pond is 116 horsepower.
6. The facilities shall be constructed as shown on the approved plans. This permit
shall become voidable unless the facilities are constructed in accordance with
the conditions of this permit, the approved plans and specifications, and other
supporting data.
7. Upon completion of construction, prior to issuance of a Certificate of Occupancy,
and prior to operation of this permitted facility, a certification must be received
from an appropriate designer for the system installed certifying that the permitted
facility has been installed in accordance with this permit, the approved plans and
specifications, and other supporting documentation. Any deviations from the
approved plans and specifications must be noted on the Certification. A
modification may be required for those deviations.
8. If the stormwater system was used as an Erosion Control device, it must be
restored to design condition prior to operation as a stormwater treatment device,
and prior. to occupancy of the facility.
9. Access to the stormwater facilities shall be maintained via appropriate
easements at all times.
10. The permittee shall submit to the Director and shall have received approval for
revised plans, specifications, and calculations prior to construction, for any
modification to the approved plans, including, but not limited to, those listed
below:
a. Any revision to any item shown on the approved plans, including the
stormwater management measures, built -upon area, details, etc.
b. Project name change.
c. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area or to the
drainage area.
e. Further subdivision, acquisition, lease or sale of all or part of the project,
area. The project area is defined as all property owned by the permittee,
for which Sedimentation and Erosion Control Plan approval or a CAMA
Major permit was sought.
f. Filling in, altering, or piping of any vegetative conveyance shown on the
approved plan.
11. The permittee shall submit final site layout and grading plans for any permitted
future areas shown on the approved plans, prior to construction.
12. A copy of the approved plans and specifications shall be maintained on file by
the Permittee for a minimum of ten years from the date of the completion of
construction.
Page 4 of 7
State Stormwater Management Systems
Permit No. SW8 041220
13. The Director may notify the permittee when the permitted site does not meet one
or more of the minimum requirements of the permit. Within the time frame
specified in the notice, the permittee shall submit a written time schedule to the
Director for modifying the site to meet minimum requirements. The permittee
shall provide copies of revised plans and certification in writing to the Director
that the changes have been made.
III. GENERAL CONDITIONS
This permit is not transferable except after notice to and approval by the Director.
In the event of a change of ownership, or a name change, the permittee must
submit a formal permit transfer request to the Division of Water Quality,
accompanied by a completed name/ownership change form, documentation
from the parties involved, and other supporting materials as may be appropriate.
The approval of this request will be considered on its merits and may or may not
be approved. The permittee is responsible for compliance with all permit
conditions until such time as the Division approves the transfer request.
2. Failure to abide by the conditions and limitations contained in this permit may
subject the Permittee to enforcement action by the Division of Water Quality, in
accordance with North Carolina General Statute 143-215.6A to 143-215.6C.
3. 'The issuance of this permit does not preclude the Permittee from complying with
any and all statutes, rules, regulations, or ordinances, which may be imposed by
other government agencies (local, state, and federal) having jurisdiction.
4. In the event that the facilities fail to perform satisfactorily, including the creation
of nuisance conditions, the Permittee shall take immediate corrective action,
including those as may be required by this Division, such as the construction of
additional or replacement stormwater management systems.
5. The permittee grants DENR Staff permission to enter the property during normal
business hours for the purpose of inspecting all components of the permitted
stormwater management facility.
6. The permit may be modified, revoked and reissued or terminated for cause. The
filing of a request for a permit modification, revocation and reissuance or
termination does not stay any permit condition.
7. Unless specified elsewhere, permanent seeding requirements for the stormwater
control must follow the guidelines established in the North Carolina Erosion and
Sediment Control Planning and Design Manual.
8. Approved plans and specifications for this project are incorporated by reference
and are enforceable parts of the permit.
9. The permittee shall notify the Division any name, ownership or mailing address
changes within 30 days.
Permit issued this the 12th day of May 2005.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
; Alan W. KlimekT.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
Page 5 of 7
State Stormwater Management Systems
Permit No. SW8 041220
Adams Mini Storage
Stormwater Permit No. SW8 041220
Onslow Count
Designer's Certification
I, , as a duly registered in the
State of North Carolina, having been authorized to observe (periodically/ weekly/ full
time) the construction of the project,
(Project)
for (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specification:
Signature
Registration Number
Date
SEAL
Page 6of7
State Stormwater Management Systems
Permit No. SW8 041220
Certification Requirements:
1. The drainage area to the system contains approximately the permitted
acreage.
2. The drainage area to the system contains no more than the permitted
amount of built -upon area.
3. All the built -upon area associated with the project is graded such that the
runoff drains to the system.
4. All roof drains are located such that the runoff is directed into the system.
5. The outlet/bypass structure elevations are per the approved plan.
6. The outlet structure is located per the approved plans.
7. Trash rack is provided on the outlet/bypass structure.
8. All slopes are grassed with permanent vegetation.
9. Vegetated slopes are no steeper than 3:1.
10. The inlets are located per the approved plans and do not cause short-
circuiting of the system.
11. The permitted amounts of surface area and/or volume have been
provided.
12. 'Required drawdown devices are correctly sized per the approved plans.
13. All required design depths are provided.
14.' All required parts of the system are provided, such as a vegetated shelf,
and a forebay.
15. The required system dimensions are provided per the approved plans.
cc: NCDENR-DWQ Regional Office
Onslow County Building Inspections
Page 7 of 7
�.., FIC SE ON
Date Received
Fee Paid
Permit Number
ry/
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
This form may be photocopied for use as an original
GENERAL INFORMATION
Applicants name (specify the name of the corporation, individual, etc. who owns the project):
-roMMr l,AD,4r-1s );"D _7"19MMy /4, 14DAM2
2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance):
0 M tr �- -!7 fl .,,
3. Mailing Address for person listed in item 2 above:
City:— ►�yiAy �i4�k State: /N C Zip: 7SS-F/�_ —_
Telephone Number:
4. Project Narne (subdivision, facility, or establishment name - should be consistcm with project narne oil p!anS,
specifications, letters, operation and maintenance agreements, etc.):
5. Location of Projectt (sreet address):
91/�-8�— 6 "CY 4 Xct W TO�4Q
City: W/o p'-1-tcr County:
G. Directions to project (from nearest major intersection):
Ko M 7 0,J rfK s CC o N� o f NC c y + N D S i o
NO{� U N YU V A S s, tZ J 2aC y 1-Ut
0 Fo [L % 3,5 ' )A 0 � 4) $ 17` 6' d "�, i. G I:' i 11 ]!
7. Latitude: /f 3Y y 3 - 50" Longitude: L'u 7 % - I `% -I `) of project
Contactperson ��,'ho can aizswer question about the project: /
Narne:JoSEPY! vxt.VJ & Nt �� 3S
Telephone umber: {_ )
it. PERMIT INFORMATION:
1. Specify whether project is (check one): New Renewal Modification
Form SWU-101 L Version 3.99 Page I of
2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the
existing permit number N/�1 and its issue date (if known)
3. Specify the type of project (check one):
Low Density High Density Redevelop General Permit Other
Additional Project Requirements (check applicable blanks):
CAMA Major _Sedimentation/Erasion Control _404/401 Permit �NPDI:S Storrrtwatet'
Information on required state permits can be obtained by contacting the Customer Service Center at
1-877-623-6748.
Ill. PROJECT INFORMATION
In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative
(one to two pages) describing stormwater management for theproject.
1 STor� wZ w+ F�ow �a T`,� Wt�-r;IN ThE Ct�vTEK a�=
C h P (e l u C (-M -r- //r- --P,' Al 7) T -4- 0 r— S, 7-6-,
r2ow, T/�t-cU r w; LJ rlo w, N T M aTs C',cc-f '�,
2. Stormwater runoff from this project drains to the WJ1 T L JAK River basin.
3. Total Project Area: 11 awes
S. Flow many drainage areas does the project have?
4. Project Built Upon Area: 67 b
G. Complete the following information for each drainage area. If there are more than two drainage areas in the
project, attach an additional sheet with the information for each area provided in the sonic format as below.
Basin Information
r ",.:Drains e A'rearl, ; .
g
Drains e Area '2
g
Receiving Stream Name
f�IOTT �y C �et�K
Receiving Stream Class
G NS W
DrainageArea(,G5$
AC 4213 ,2 SF
Ixisting Impervious* Area
3 2 d U S
Proposed Impervious*Area
$ 333
% Impervious* Area (total)
Impervious* Surface Area
_.:Drainage°Area l`
Drainage Area 2
On -site Buildings
�� 0 U
On -site Streets
g 533-
On-site Parking
On -site Sidewalks
Other on -site
Off -site
Total: 3 G, 3 3 3 SF
Total:
' Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas,
sidewalks, gravel areas, etc,
1=orm SWU-101 Version 3.99 Page 2 of 4
How was the off -site impervious area listed above derived?.
IVO Al C
IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS
The following italicized deed restrictions and protective covenants are required to be recorded for all
subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table
listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment.
1. The fol�� -covenants are intended to ensure ongoing compliance with state stoninvater management permit uutnber
as issued by the Division of Water Quality. These covenants may not be
changed or deleted without the consent of the State.
2. No more than / 3 61 3'� 3 square feet of any lot shall be covered by structures or impervious materials.
Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood
decking or the water surface of swimming pools.
3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings.
4. Built- upofi area in excess of the permitted amount requires a state storm water nranagemertt permit modification prior to
construction.
5. All permitted runoff from outparcels ar future development shall be directed into the permitted stonnwaier control
systerft. These connections to the storrntivater control system shall be Performed in a ftranner that maintains the inle"Ority
and performance orthe system as permitted.
By your signature below, you certify that the recorded deed restrictions and protective covenants for this project
shall include all the applicable iterns required above, that the covenants will be binding on all parties and persons
claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted
without concurrence from the State, and that they will be recorded prior to the sale of any lot.
V. SUPPLEMENT FORMS
The applicable state stormwater management -permit supplement forms) listed below must he submitted for each
BMP specified for this project. Contact the Stormwater and.Ceneral Permits Unit at (919) 733-5083 for the SCatlrS
and availability of these forms.
Form SWU-102
Wet Detention Basin Supplement
Form SWU-103
Infiltration Basin Supplement
Form SWU-104
Low Density Supplement
Dorm SWU-105
Curb Outlet System Supplement
Form SWU-106
Off -Site System Supplement
FD1 n SWU-107
Underground Infiltration Trench Supplement
Form SWU-108
Neese River Basin Supplement
Form SWU-109
Innovative Best Management Practice Supplement
Form SWU-101 Version 3.99 Page 3 of 4
VI. SUBMITTAL REQUIREMENTS
Only complete application packages will be accepted and reviewed by the Division. of Water Quality (DWQ),
A complete package includes all of the items listed below. The complete application package should be
submitted to the appropriate DWQ Regional Office..
Please indicate that you have provided the following required information by initialing in the space provided
next to each item.
• Original and one copy of the Stormwater Management Permit Application Form
• One copy of the applicable Supplement Form(s) for each BMP
• Permit application processing fee of $420 (payable to NCDENR)
• Detailed narrative description of stormwater treatment/management
• Two copies of plans and specifications, including:
Development/Project name
- Engineer and firm
-Legend
- North arrow
- Scale
- Revision number & date
- Mean high water line
- Dimensioned property/project boundary
Location map with named streets or NCSR numbers
- Original contours, proposed contours, spot elevations, finished floor elevations
- Details of roads, drainage features, collection systems, and stormwater control measures
- Wetlands delineated, or a note on plans that none exist
- Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations
- Drainage areas delineated
- Vegetated buffers (where required)
VII. AGENT AUTHORIZATION
If you wish to designate authority to another individual or firm so that they may provide information on your
behalf, please complete this section. ..�
Designated agent (individual or firm): (OCOiNi 117G (5WC�' ^J C IN�
Mailing Address:
City:, t�E I`�_-T�� ZE58 ��_ State: NC-� Zip: 3"
Phone: { �- ) 3 s /- _ Fax: ( oseL) 393- "007 _
VIII. APPLICANT'S CERTIFICATION
1, (print or type name of person listed in Genera! Information, item 2) aJy�t Y_ f-_• /�D l! S
certify that the information included on this permit application form is, to the best of my knowledge, correct and
that the project will be constructed in conformance with the approved plans, that the required deed restrictions
and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A
NCAC. 2H .1000.
XSignature;/ d -
Date:! -PEC. Z.DDY
Form SWU-101 Version 3.99 Page 4 of 4