HomeMy WebLinkAboutSW8040430_COMPLIANCE_20050510STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW
DOC TYPE
❑ CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
COMPLIANCE EVALUATION INSPECTION
DOC DATE
YYYYMM DD
WET DETENTION POND ANALYSIS
FILE NAME: S:1WQSIPOND1040430.may05.WK1
PROJECT #: SW8 040430.may05 REVIEWER: L. Lewis
PROJECT NAME: Uzzell Car Wash DATE: 10-May-05
Lots 2, 3 & 4 Atlantic Plaza
Receiving Stream: Mil? Creek Class: SA (>1/2 mile)
Drainage Basin: White Oak Index No. WOK02 19-30-1
Site Area 2.69 acres
Drainage Area 49330 square feet Area in Acres 2.51
IMPERVIOUS AREAS Rational C
Buildings 20438.00 square feet
Parking 64953,00 square feet
SW square feet
square feet
square feet
square feet
square feet
TOTAL 85�91 00 square feet Rational Cc= 0.04
SURFACE AREA CALCULATION
% IMPERVIOUS
78.10°!_
SAIDA Ratio
5.07%
Des. Depth
4 avg.
Req. SA
5540 sf
TSS:
85
Prov. SA
61'S0 sf
VOLUME CALCULATION * place a "1" in the box if Rational is used
Req. Volume 80 cf
Vol. Prov. at DP 'E7o cf
ORIFICE CALCULATION
FOREBAY
Perm. Pool Volume= 13519
Req. Forebay Volume= 2703.8
Provided Volume= 3481.00
Percent=
Elevation Area Inc. Vol. Acc. Vol.
32.00 6150.00 0.00
33.00 7600.00 6875.00 6875.00
Avg. Head =
0.48 ft
Q2 Area =
1.72
sq. inches
Flow Q2, cfs
0.040 cfs
Q5 Area =
0.69
sq. inches
Flow Q5, cfs
0.016 cfs
Orifice Area
0.79
sq. inches
No. of Orifices
1 =
Q=
0.018
cfs
COMMENTS
Volume and Orifice are within Design Guidelines. Surface area is deficient based on a 3' average depth.
WET DETENTION POND ANALYSIS
FILE NAME: S:IWQSIPOND1040430.apr05.WK1
PROJECT #: SW8 040430.apr05 REVIEWER: L. Lewis
PROJECT NAME: Uzzell Car Wash Atlantic Plaza DATE: 26-Apr-05
Receiving Stream: Mill Creek Class: SA
Drainage Basin: White Oak Index No. WOK02 19-30-1
Site Area 2.69 acres
Drainage Area h 93 �5_00 square feet Area in Acres 2.51
IMPERVIOUS AREAS
Rational C
Buildings 20438.00
square feet
Parking 64953.00
square feet
SW
square feet
square feet
square feet
square feet
square feet
TOTAL 5;1 00 `
square feet
Rational Cc= 0.04
SURFACE AREA CALCULATION
% IMPERVIOUS '8.10%
SA/DA Ratio &65%
Des. Depth 3 avg.
Req. SA 7269
sf
TSS: 85
Prov. SA "1;C',
sf
VOLUME CALCULATION
* place a "1" in the box if Rational is used
Rational ?*
FOREBAY
Des. Storm 100 inches
Perm. Pool Volume=
Rv= 0.753
Req. Forebay Volume=
0
Bottom 28 msl
Provided Volume=
Perm. Pool 2 u0 msl
Percent=
Av;v
Design Pool 33 msl
Storage met @elev 33.00 msl
Elevation Area
Inc. Vol. ACC, VOL
Req. Volume 60 cf
32.00 6150.00
0.00
Vol. Prov. at DP
33.00 7600.00
6875.00 6875.00
JZ1111C81�T1Imn ��-11C07i•
Avg. Head =
0.48 ft
Q2 Area =
1,72
sq. inches
Flow Q2, cfs
0.040 cfs
Q5 Area =
0.69
sq. inches
Flow Q5, cfs
0.016 cfs
Orifice Area
0.79
sq. inches
No. of Orifices
1
Q=
0.018
cfs
COMMENTS
Volume and Orifice are within Design Guidelines. Surface area is deficient based on a 3' average depth.