Permit: SW8040106
County: Onslow
Region: Wilmington
Compliance Inspection Report
Effective: 06/18/04 Expiration: 06/18/14 Owner: Edward E Penuel
Project: Coastal Contractors, Inc. -Office Site
US Hwy 17 New Bern Hwy
Jacksonville NC 28540
Contact Person: Edward E Penuel Title: Owner Phone: 910-347-1479
Directions to Project:
From intersection of US Hwy 17 & NC Hwy 24, North on US Hwy 17 approx. 5.60 miles site is on the right.
Type of Project: State Stormwater - HD - Detention Pond
Drain Areas: 1 - (Northeast Creek) (03-05-02 ) ( SC -.NSW)
On -Site Representative(s):
Related Permits:
Inspection Date: 07/15/2011 Entry Time: 08:10 AM
Primary Inspector: David W Cox
Secondary Inspector(s):
Reason for Inspection: Follow-up
Permit Inspection Type: State Stormwater
Facility Status: ■ Compliant Q Not Compliant
Question Areas:
■ State Stormwater
(See attachment summary)
Exit Time: 08:20 AM
Phone: 910-796-7215
Inspection Type: Compliance Evaluation
Page: 1
Permit: SW8040106 Owner - Project: Edward E Penuel
Inspection Date: 0711512011 Inspection Type: Compliance Evaluation Reason for Visit: Follow-up
Inspection Summary:
System is in compliance per the engineer's stamp of 6/28/2011.
File Review
Yes
No
NA
N
Is the permit active?
■
Cl
Q
❑
Signed copy of the Engineer's certification is in the file?
■
❑
Q
O
Signed copy of the Operation & Maintenance Agreement is in the file?
O
Q
Q
Copy of the recorded deed restrictions is in the file?
❑
❑
❑
■
Comment:
Page: 2
w
Compliance Inspection Report
Permit: SW8040106
County: Onslow
Region: Wilmington
Effective: 06/18/04 Expiration: 06/18/14
Owner: Edward E Penuel
Project: Coastal Contractors, Inc. -Office Site
US Hwy 17 New Bern Hwy
Jacksonvifle NC 28540
Contact Person: Edward E Penuel Title: Owner Phone: 910-347-1479
Directions to Project:
From intersection of US Hwy 17 8 NC Hwy 24, North on US Hwy 17 approx. 5.60 miles site is on the right.
Type of Project: State Stormwater - HD - Detention Pone!
Drain Areas: 1 - (Northeast Creek) (03-05-02 ) ( SC;NSW)
On -Site Representative(s):
Related Permits:
Inspection Date: 05/1612011 Entry Time: 01:00 PM
Primary Inspector: Angela K Hammers
Secondary Inspector(s):
Reason for Inspection: Routine
Permit Inspection Type: State Stormwater
Facility Status: 0 Compliant ■ Not Compliant
Question Areas:
M State Stormwater
(See attachment summary)
Exit Time: 01:30 PM
Phone: 919-796-7215
Ext.7317
Inspection Type: Compliance Evaluation
Page: 1
40,
Permit: SW8040106 Owner - Project: Edward E Penuel
Inspection Date: 05/16/2011 Inspection type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
The following deficiencies were noted during the inspection:
1. An engineers' certificate of the stormwater system was not found in the DWQ file.
2. Pond slopes appeared steeper than 3:1, especially near the inlet of the forebay and adjacent to the road of the main
basin side. The overflow appears to extend only to the TOB, which is different than approved plan.
3. Pond slopes are steep and eroding, especially near the inlet of the forebay basin (a willow tree had fallen into the
basin). Numerous willow trees and myrtles were observed on the pond slopes.
To bring this system into compliance, the following must be completed:
1. Submit an engineers' certification of the stormwater system to DWQ.
2. Maintain pond slopes per the approved plan. Re -vegetate as needed.
3. Repair the overflow per the approved plan.
4. Repair erosion of pond slopes and re -vegetate as needed.
5. Remove woody plants along pond slopes below the permanent pool elevation.
Note: If additional built upon area (BUA) is proposed, please submit a permit modification to notate the future BUA for
approval prior to construction.
Page: 2
' Permit: Sw8040106 Owner -Project: Edward E Penue!
Inspection Date: 05/16/2011 Inspection Type: Compliance Evaluation
Reason for Visit: Routine
File Review
Is the permit active?
Signed copy of the Engineer's certification is in the file?
Signed copy of the Operation & Maintenance Agreement is in the file?
Copy of the recorded deed restrictions is in the file?
Comment: An engineers' certification was not found in the DWQ file.
Built Upon Area
Is the site BUA constructed as per the permit and approval plans?
Is the drainage area as per the permit and approved plans?
Is the BUA (as permitted) graded such that the runoff drains to the system?
Comment: Building, parking and gravel lot was observed as constructed on Parcel A.
Are the SW measures constructed as per the approved plans?
Are the inlets located per the approved plans?
Are the outlet structures located per the approved plans?
Comment: Pond slopes appear steeper than 3:1 especially near the inlet of the
forebay and adjacent to the road on the main basin side. The overflow appears to
extend only to the TOB, which is different than approved plan.
Yes No NA NE
■000
D■nD
■n0D
DD■O
Yes No NA NE
■❑Dn
■DDD
■DDD
Yes No NA NE
D■D0
D0D■
DDD■
Operation and Maintenance Yes No NA NE
Are the SW measures being maintained and operated as per the permit requirements? fl ■ D f-1
Are the SW BMP inspection and maintenance records complete and available for review or provided to DWO D 01 ■
upon request?
Comment: Pond slopes are steep and eroding, especially near the inlet of the forebay
basin (a willow tree had fallen into the basin). Numerous willow trees and myrtles were
observed on the pond slopes.