HomeMy WebLinkAboutSW8000415_COMPLIANCE_20010601STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW
DOC TYPE
El CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
COMPLIANCE EVALUATION INSPECTION
DOC DATE
_;2_ j l
YYYYMMDD
❑Kimley-Horn
and Associates, Inc
Transmittal
Date June 15, 2001
To Linda Lewis
SUN 19 2001
Job No 018051002 and 018051001
DENR - Environmental Engineer
Wilmington Regional Office
127 Cardinal Drive
Wilmington, NC 28504-3845
P O Box 33068
Raleigh North Carolina
27036 9068
TEL 919 677 2000
FAX 919 677 2050
We are sending you
® Attached Under separate cover via the following items
j] Shop Drawings n Prints/Plans n Samples ❑ Specifications n Change Orders
Other
Copies Date No Description
These are transmitted as checked below
M For your use n Approved as submitted n Resubmit n Copies for approval
n As requested n Approved as noted n Submit f Copies for distribution
171 For review and comment n Returned for corrections n Return n Corrected prints
RemarksLinda - If you have any questions regarding the summary for our site visit to Marsh and
Copy to
Klmley-Horn
and Associates, Inc
June 14, 2001
Ms Linda Lewis
Environmental Engineer
State of North Carolina
Department of Environment
And Natural Resources
Wilmington Regional Office
Stormwater Project No.'s SWS 000415 & SW8920522MOD
(Ocean Harbour & Marsh Harbour)
Dear Ms Lewis,
■
P 0 Box 33068
Raleigh, Narth Carohna
27636 3068
Attached you will find two (2) tables that summarize our findings on June 13, 2001 for infiltration basins
associated with the Ocean and Marsh Harbour projects The table lists infiltration basin numbers and their
corresponding bottom elevations, existing ground elevations, groundwater table elevations and any
proposed modifications to the original design
Per our discussion during the site visit we will be incorporating your recommendations into our redesign of
Marsh Harbour basins 3, 4, 6, 7, $, 9 and 13 All three Ocean Harbour infiltration basin locations and
elevations were verbally approved as submitted based upon field observations of soil samples
Thank you again for your efforts and cooperation on this project If you have any concerns or questions or
if additional information is needed, please do not hesitate to call me
Since �ely,
a•■�
Harlan Britt, PE
Cc Don Safrit, P E
■
TEL 919 677 2000
FAX 919 677 2050
RESORT LADANE - OCEAN HARBOUR
RESORT LADANE - MARSH HARBOUR
BOTTOM
1NATER
EXISTING
ELEVATION O
SURFACE
GROUND
PROPOSED
MODIFICAbTION
BASIN #
ELEVATION
ELEVATION
BASIN
REQUIRED
ACTIO PROPOSED
1
>2' below bottom
46
40
N
2
>2' below bottom
24
22
N
3
undetermined
12
10
Y
Infiltration basin will be replaced with a sand filter
4
445
48
46
Y
Infiltration basin will be raised and widened
5
52' below bottom
49
46
N
6
465
50
475
Y
Infiltration basin will be raised and widened
7
undetermined
245
205
Y
Unsuitable soils will be excavated and replaced with suitable sods
8
undetermined
245
205
Y
Unsuitable soils will be excavated and replaced with suitable sods
9
undetermined
245
205
Y
Unsuitable soils will be excavated and replaced with suitable sods
10
445
48
47
N
11
445
48
47
N
12
undetermined"
44
41
undetermined
13
undetermined
26
255
Y
Unsuitable soils will be excavated and replaced with suitable sods
Sample was unable to be retrieved due to soil conditions It is our understanding that Vincent with NCDENR will take sample on July 9th
Project Name Location 02126 " r7cf
DIVISION OF WATER QUALITY
2
3
4
INFILTRATION SYSTEM INVESTIGATION
The minimum bore depth
:# 1 # 2
03
Existing ground elevation
193 d
2.526
Proposed Bottom elevation
/2, 5
Add 2'
+2 +2
+2
Depth
The type of soil
SZsI
The expected infiltration rate
+2
The depth to the Seasonal High Water Table #0- q -#z - ¢ # 3 - Rq 5-
S Additional comments
# 3 OIL
1- 1 OIL
-f� 2 CAI G
Signature of Regional Office Personnel
Linda Lewis, DWQ
Pcrmit Application No
Vincent Lewis, Soil Scientist
SW ow415 Date
S 1WQSISTORMWAT7ORMS1INFlNVST FOR
STORMWATER CALCULATIONS
RESORT LADANE - OCEAN HARBOUR
s C+fir
a
e t 7^
who '1 A
INFILTRATION BASIN ANALYSIS
DATE 17-Sep-2001
PROJECT NAME Ocean Harbour
DRAINAGE BASIN Lumber
RECEIVING STREAM Calabash River
Index No 15-25-5
SITE AREA 215 27 acres
IMPERVIOUS AREA CALCULATION
BUILDINGS
PARKING/ASPHALT
CONCRETE SIDEWALKS
OTHER
% IMPERVIOUS, I=
ELEVATION OF SEASONAL HIGH WATER TABLE
REPORTED INFILTRATION RATE
SURFACE AREAS AND ELEVATIONS
Elegy (ft) Area
BOTTOM 125
STORAGE 14
FILENAME S 1WQS11NBASIN1000415-1 WK1
PROJECT # 000415-1 Basin 1
REVIEWER arl
CLASS SA
If ORW, is site within the 575' AEC? n/a
DRAINAGE AREA 8 4 5 -0- -71 SF
AREAS C & D
36591 SQUARE FEET
20473 SQUARE FEET
1133 SQUARE FEET
SQUAREFEET
TOTAL 58197 SQUARE FEET
RV= 05+ 009 (1 ) = I 67
10 FEET MSL
0 15 jCF/HR/SF
5179 SQUARE FEET
SQUARE FEET
SQUARE FEET
6874 SQUARE FEET
VOLUME / DEPTH / DRAWDOWN CALCULATION
DESIGN STORM, INCHES
DESIGN VOLUME
TOTAL VOLUME AVAILABLE
DEPTH OF RUNOFF
TIME TO DRAWDOWN
15
7075 CUBIC FEET
9040 CUBIC FEET
FEET
11 6 HOURS MUST BE <120
COMMENTS
Volume and drawdown are (not) within Design Requirements
INFILTRATION BASIN ANALYSIS
DATE 17-Sep-2001
PROJECT NAME Ocean Harbour
DRAINAGE BASIN Lumber
RECEIVING STREAM Calabash River
Index No 15-25-5
SITE AREA 215 27 acres
IMPERVIOUS AREA CALCULATION
BUILDINGS
PARKING/ASPHALT
CONCRETE SIDEWALKS
OTHER
% IMPERVIOUS, I= _.........64 6% j
ELEVATION OF SEASONAL HIGH WATER TABLE
REPORTED INFILTRATION RATE
SURFACE AREAS AND ELEVATIONS
FILENAME S 1WQS11NBASIN1000415-2 WK1
PROJECT # 000415-2 Basin 2
REVIEWER arl
CLASS SA
If ORW, is site within the 575' AEC? nla
DRAINAGE AREA 43749 SF
AREAS C & D
25701 SQUARE FEET
64353 SQUARE FEET
2858 SQUARE FEET
SQUARE FEET
TOTAL 92912 SQUARE FEET
RV= 05+ 009 (1) = Iq3
4 FEET MSL
015 CFIHRISF
Elegy (ft) Area
BOTTOM 8 5250 SQUARE FEET
SQUARE FEET
SQUARE FEET
STORAGE 10 8214 SQUARE FEET
VOLUME 1 DEPTH 1 DRAWDOWN CALCULATION
DESIGN STORM, INCHES
DESIGN VOLUME
TOTAL VOLUME AVAILABLE
TIME TO DRAWDOWN
11351 CUBIC FEET
13464 CUBIC FEET
2,00 FEET
17 1 HOURS MUST BE <120
COMMENTS
Volume and drawdown are (not) within Design Requirements
INFILTRATION BASIN ANALYSIS
DATE 17-Sep-2001
PROJECT NAME Ocean Harbour
DRAINAGE BASIN Lumber
RECEIVING STREAM Calabash River
Index No 15-25-5
SITE AREA 215 27 acres
IMPERVIOUS AREA CALCULATION
BUILDINGS
PARKING/ASPHALT
CONCRETE
OTHER
% IMPERVIOUS, I= 1 49 0%
ELEVATION OF SEASONAL HIGH WATER TABLE
REPORTED INFILTRATION RATE
SURFACE AREAS AND ELEVATIONS
Elegy (ft) Area
BOTTOM 22
STORAGE 24
FILENAME S 1WQS11NBASIN1000415-3 WK1
PROJECT # 000415-3 Basin 3
REVIEWER arl
CLASS SA
If ORW, is site within the 575' AEC' n/a
DRAINAGE AREA F- 148540 SF
21780 SQUARE FEET
17424 SQUARE FEET
4356 SQUARE FEET
29185 SQUARE FEET
TOTAL 72745 ISQUARE FEET
RV= 05+ 009 ( I ) = 1 0 49
19 5 1 FEET MSL
0 15 CF/HR/SF
4185 SQUARE FEET
SQUARE FEET
SQUARE FEET
5990 SQUARE FEET
VOLUME / DEPTH / DRAWDOWN CALCULATION
DESIGN STORM, INCHES
DESIGN VOLUME
TOTAL VOLUME AVAILABLE
DEPTH OF RUNOFF
TIME TO DRAWDOWN
15
91 12CUBIC FEET
10175 ICUBIC FEET
2 00 FEET
16 2,JHOURS MUST BE <120
COMMENTS
Volume and drawdown are (not) within Design Requirements
CoI,Kimley Horn
and Associates Inc
Infiltration Basin #1 (I-B #1)
Project Information
Project Name Ocean Harbour -Resort LaDane
KHA Project #
1805102
Designed by
OJP
Checked by
DLS
Date 6111 /01
Date 6/11 /01
Site Information
Contributing Basins EF
Soils Report
Soli Type Sandy Soil
Infiltration Rate 1 8 in/hr = 015 ft/hr
SHWT Elevation 10 feet
Required Volume
Design Storm = 15 inches (Project Drains to SA waters)
Volume Required= 7,087 CF
Volume Provided by I B #1
Storage Depth = 1 5 feet
Surface area @ Bottom = 5179 sq feet
Surface Area ® Storage= 6874 sq feet
Bottom Elevation= 12 5 feet (at least 2' above SHWT)
Storage Elevation= 14 feet
Volume Provided= 9,040 CF 4— c�_lc ul _,fed by - 2 me#-7v(�
Is Volume Sufficient (yes/no)? yes fie- 6--11-01 je,4&-
Drawdown
Drawdown Time = total volume / bottom surface area / infiltration
9 Hours
less than 5 days (yes/no) 7 yes
RECEIVED
J U L 3 0 2001
PRaa # Sw2uo041 S
►I /1Kimfey Horn
and Aumiales Inc
Drainage Basin EF
Project Information
Project Name
KHA Project #
Designed by
Checked by
Site Information
Sub Area Location
Drainage Area (DA)
Impervious Area (IA)
Percent Impervious (1)
Solis Report
Ocean Harbour - Resort LaDane
1805102
OJP Date 6/11/01
DLS Date 6/11/01
EF
191 Acres
134 Acres
70 %
Soil Type Sandy
Infiltration Rate 1 8 in/hr ; 015 ft/hr
Required Volume (Simple Method - preferred)
Design Storm = 1 5 inches (Project Drains to SA waters)
Determine Rv Value= 0 05 + 009 (1) = 068 in/in
Volume Required= 7,087 CF
❑�❑ KimleyHam
and Associates, Inc Sheed No k o1
Job.WM.E — Subject 5WAL—ES_ _ Job No PA 51000.1-
Designed by —a 1 P Date 011,11211151 Checked by Date
Loc.tiTtErS — —
--.Fiow_Lmvilyka _BYpa55 -�jR v CIC-: (SEE_m J
TSm�„
c I
TJ
!II Ij I 3
^] 0 ivy n 0
J1p I f fiP I i �1 I.. .. . ........
_ _
k� = l 01
r MINIMIJ,
mill,
�o_ s� 4 • SCLS aIZ r.�fa
I I I y
77
�
.1
}(
�
k
_�
.�
'
{
t
f
�
-
;"
i
-
..
. ,�
\" " �� °
fl ' ~ 'IY ,
�� �
+ �+'-` - -
„ , .. ±
Bypass Device #1 A Outflow - 2 yr Storm
Worksheet for Trapezoidal Channel
Project Description
Worksheet
Bypass Device A
Flow Element
Trapezoidal Cha
Method
Manning's Form
Sole For
Channel Depth
Input Data
ManningsCoeffic
0050
Slope 005000 ft/ft
Left Side Slope
025 V H
Right Side Slope
025 V H
Bottom Width
5 00 ft
Discharge
326 cfs
Results
Depth
045 ft
Flow Area
31 W
Wetted Penmi
875 ft
Top Width
864 ft
Critical Depth
022 ft
Critical Slope 0063715 Wft
Velocity
105 ft/s <-
Velocity Head
002 ft
Specific Energy
047 ft
Froude Numb
031
Flow Type 3ubcntical
Project Engineer GTW688
untitled fm2 Krmtey-Horn $ Associates Inc FlowMaster v6 0 [614b]
06/12/01 12 15 41 PM 0 Haestad Methods Inc 37 Brookside Road Waterbury CT 06708 USA (203) 755-1666 Page 1 of 1
Bypass Device #1 A Outflow -10 yr Storm
Worksheet for Trapezoidal Channel
Project Description
Worksheet
Bypass Device #
Flow Element
Trapezoidal Cha
Method
Mammng's Form
Solve For
Channel Depth
Input Data
Mammngs CoefFc
0 050
Slope
005000 Wit
Left Side Slope
025 V H
Right Side Slope
025 V H
Bottom Width
500 ft
Discharge
465 cfs
Results
Depth
055 ft
Flow Area
40 ftz
Wetted Penmi
955 ft
Top Width
941 ft
Critical Depth
028 ft
Critical Slope 0059796 fttft
Velocity
1 17 ftls.6_-
Velocity Head
002 ft
Specific Eneq
057 ft
Froude Numl>
032
Flow Type 3ubcntical
Project Engineer GTW686
untitled fm2 Kimley-Hom & Associates Inc FlowMaster v6 0 [614b]
06/12/01 12 16 08 PM ® Haestad Methods Inc 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
Bypass Deice #1 B Outflow - 2 yr Storm
Worksheet for Trapezoidal Channel
Project Description
Worksheet
Bypass Device A
Flow Element
Trapezoidal Cha
Method
Manning's Form
Solve For
Channel Depth
Input Data
Manrnngs Coeffic
0 050
Slope 005000 ft/ft
Left Side Slope
025 V H
Right Side Slope
025 V H
Bottom Width
500 ft
Discharge
529 cfs
Results
Depth
059 ft
Flow Area
43 ft2
Wetted Penmi
987 ft
Top Width
972 It
Critical Depth
030 ft
Critical Slope 0058493 ft/ft
Velocity
122 ft/s dl;—L—
Velocity Head
002 ft
Specific Eneq
061 ft
Froude Numb
032
Flow Type 3ubcntical
Project Engineer GTW688
untitled fm2 Kimley-Hom & Associates Inc FlowMaster v6 0 [614b]
06/12101 12 16 34 PM 0 Haestad Methods, Inc 37 Brookside Road Waterbury CT 06708 USA (203) 755-1666 Page 1 of 1
Bypass Device #1 B Outflow -10 yr Storm
Worksheet for Trapezoidal Channel
Project Description
Worksheet
Bypass Device A
Flow Element
Trapezoidal Cha
Method
Mammng's Form
Solve For
Channel Depth
Input Data
Mannmgs Coeffic
0 050
Slope
005000 ft/ft
Left Side Slope
025 V H
Right Side Slope
025 V H
Bottom Width
500 ft
Discharge
756 cfs
Results
Depth
071 ft
Flow Area
56 112
Wetted Penmi
1088 ft
Top Width
1071 ft
Critical Depth
037 ft
Critical Slope
0 055059 ft/ft
Velocity
135 ft/s OZ,�
Velocity Head
003 ft
Specific Ener4
074 ft
Froude Numb
033
Flow Type
3ubcntical
Project Engineer GTW688
untitled fm2 Klmfeyaiom & Associates Inc FlowMaster v6 0 [614b]
06/12/01 12 16 55 PM 0 Haestad Methods, Inc 37 Brookside Road Waterbury CT 06708 USA (203) 755-1666 Page 1 of f
Bypass Device #1B AND #1A Outflow - 2 yr Storm
Worksheet for Trapezoidal Channel
Project Description
Worksheet
Bypass Device A
Flow Element
Trapezoidal Cha
Method
Mammng's Form
Solve For
Channel Depth
Input Data
Mammngs Coefhc
0 050
Slope 005000 It/ft
Left Side Slope
025 V H
Right Side Slope
025 V H
Bottom Width
500 ft
Discharge
855 cis
Results
Depth
076 It
Flow Area
61 W
Wetted Penm4
1127 ft
Top Width
1108 ft
Critical Depth
040 ft
Critical Slope
0053950 Wit
Velocity
140 tlls �-
Velocity Head
003 ft
Specific Enert
079 ft
Froude Numb
033
Flow Type
Subcntical
Project Engineer GTW688
untitled fm2 Klmley-Horn & Associates Inc FlowMaster v6 0 [614b]
O6/12101 12 17 45 PM 0 Haestad Methods, Inc 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of i
Bypass Device #1 B AND #1A Outflow -10 yr Storm
Worksheet for Trapezoidal Channel
Project Description
Worksheet
Bypass Device #
Flow Element
Trapezoidal Cha
Method
Manning's Form
Solve For
Channel Depth
Input Data
Mannings Coeffic
0 050
Slope
005000 f tft
Left Side Slope
025 V H
Right Side Slope
025 V H
Bottom Width
500 ft
Discharge
1222 cfs
Results
Depth
091 ft
Flow Area
79 ft2
Wetted Perim+
1253 It
Top Width
1231 It
Critical Depth
050 ft
Critical Slope
0050927 ft/ft
Velocity
155 ft/s F'
Velocity Head
004 It
Specific Enert
095 ft
Froude Numb
034
Flow Type
'aubcritical
Project Engineer GTW688
untitled fm2 Kimley-Ham & Assoclates Inc FlowMaster v6 0 [614b]
06112J01 12 18 04 PM 0 Haestad Methods Inc 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
CurlICmleyHorn
and Assowtes, ine
Infiltration Basin #2 (I.B. #2)
Project Information
Project Name
KHA Project #
Designed by
Checked by
Ocean Harbour -Resort LaDane
1805102
O,f P Date 6/11 /01
DLS Date 6/11/01
Site Information
Contributing Basins CD
Salts Report
Soil Type Sandy Soil
Infiltration Rate 1 8 in/hr = 015 ft/hr
SHWT Elevation 4 feet
Required Volume
Design Storm = 1 5 inches(Prolect Drains to SA waters)
Volume Required= 11,211 CF
Volume Provided by I B #2
Storage Depth = 2 feet
Surface area ® Bottom = 5250 sq feet
Surface Area ® Storage= 8214 sq feet
Bottom Elevation= 8 feet (at least 2' above SHWT) /
Storage Elevation= 10 feet I2f e�� �e2 /7j2UC
1GU
Volume Provided= 13,464 CF E— C2
fig- Co- (t-Ut I e4+er.
Is Volume Sufficient (yes/no)7 yes
Drawdown
Drawdown Time = total volume / bottom surface area / infiltration
14 Hours
less than 5 days (yes/no) ?_ yes
RECEIVED
PROJ #
JUL 3 0 2001
DWQ
CIKimley Horn
S11 and Associates Inc
Drainage Basin CD
Project Information
Project Name
KHA Project #
Designed by
Checked by
Site Information
Sub Area Location
Drainage Area (DA)
Impervious Area (IA)
Percent Impervious (1)
Soils Report
Ocean Harbour -Resort LaDane
1805102
OJP Date 6/11/01
DLS Date 6/11/01
CD
32 Acres
211 Acres
66 %
Soil Type Sandy
Infiltration Rate 1 8 in/hr = 015 ft/hr
Required Volume. (Simple Method - preferred)
Design Storm = 15 Inches (Project Drains to SA waters)
Determine Rv Value= 0 05 + 009 (1) = 0 64 in/in
Volume Required= 11,211 CF
Kimley Horn
and Associates, Inc
Sheet No 1 of ,
,lob L14_ "E - bGEghj W . subject 5w A Job No 015510 ]c t-
Designed by WE Date Ole 112101 Checked by Date
INES
NJ
M
OMEN
soon
mom
mm
Bypass Device #2A Outflow - 2 yr Storm
Worksheet for Trapezoidal Channel
Project Description
Worksheet
Bypass Device #
Flow Element
Trapezoidal Cha
Method
Manning's Form
Solve For
Channel Depth
Input Data
Mannings Coeffic
0 050
Slope 005000 ft/ft
Left Side Slope
025 V H
Right Side Slope
025 V H
Bottom Width
500 ft
Discharge
379 cfs
Results
Depth
049 ft
Flaw Area
34 ft2
Wetted Penmg
907 ft
Top Width
895 ft
Critical Depth
024 ft
Critical Slope 0062017 ft/ft
Velocity
110 ftfs �^—
Velocity Head
002 ft
Specific Eneq
051 ft
Froude Numb
031
Flow Type 3ubcritical
Project Engineer GTW688
untitled fm2 Kimley-Worn & Associates Inc FlowMaster v6 0 [614b]
O6/12/01 12 25 03 PM 0 Haestad Methods, Inc 37 Brookside Road Waterbury CT 06708 USA (203) 755-1666 Page 1 of 1
Bypass Device #2A Outflow - 10 yr Storm
Worksheet for Trapezoidal Channel
Project Description
Worksheet
Bypass Device A
Flow Element
Trapezoidal Cha
Method
Manning's Form
Solve For
Channel Depth
Input Data
Mannings Coeffic
0 050
Slope 005000 ft/ft
Left Side Slope
025 V H
Right Side Slope
025 V H
Bottom Width
500 ft
Discharge
541 cfs
Results
Depth
060 ft
Flow Area
44 f 2
Wetted Penm4
993 ft
Top Width
978 ft
Critical Depth
030 ft
Critical Slope 0058267 Wit
Velocity
1 22 f /s E---
Veloclry Head
002 ft
Specific Eneq
062 ft
Froude Numb
032
Flow Type 3ubcntical
Project Engineer GTW688
untitled fm2 Kinsley-Hom & Associates Inc FlowMaster v6 0 [614b]
06/12/01 12 25 27 PM 0 Haestad Methods Inc 37 Brookside Road Waterbury CT 06708 USA (203) 755-1666 Page 1 of 1
Bypass Device #2B Outflow - 2 yr Storm
Worksheet for Trapezoidal Channel
Project Descripbon
Worksheet
Bypass Device R
Flow Element
Trapezoidal Cha
Method
Manning s Farm
Solve For
Channel Depth
Input Data
Mannings Coeffic
0 050
Slope 005000 fVft
t_eff Side Slope
025 V H
Right Side Slope
025 V H
Bottom Width
500 ft
Discharge
794 cfs
Results
Depth
073 ft
Flow Area
58 ftz
Wetted Perimi
1103 ft
Top Width
1085 ft
Critical Depth
038 ft
Critical Slope 0054613 fVft
Velocity
137 fVs .tom
Velocity Head
003 ft
Specific Enerf
075 ft
Froude Numb
033
Flow Type 3ubcntical
Project Engineer GTW688
untitled fm2 Kimley-Hom & Associates Inc FlowMaster v6 0 [614b)
06/12/01 12 25 51 PM 0 Haestad Methods, Inc 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
Bypass Device #2B Outflow -10 yr Storm
Worksheet for Trapezoidal Channel
Project Description
Worksheet
Bypass Deice #
Flow Element
Trapezoidal Cha
Method
Manning's Form
Solve For
Channel Depth
Input Data
Mannings Coeffic
0 050
Slope 005000 fttft
Left Side Slope
025 V H
Right Side Slope
025 V H
Bottom Width
500 ft
Discharge
1134 Cfs
Results
Depth
088 ft
Flow Area
75 ft2
Wetted Penmi
1225 ft
Top Width
1204 It
Critical Depth
047 It
Critical Slope 0051536 ft/ft
Velocity
151 ft/s 4
Velocity Head
004 ft
Specific Enert
092 ft
Froude Numb
034
Flow Type 5ubcntical
Project Engineer GTW688
untitled fm2 Kimley+lom & Associates Inc FlowMaster v6 0 E614b)
06/12/01 12 26 06 PM 0 Haestad Methods Inc 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
r _„ Kim€ey Hom
i• and Assmates Inc
Infiltration Basin #3 (l.B. #3)
Project Information
Project Name
KHA Project #
Designed by
Checked by
Site Information
Contributing Basins
Ocean Harbour -Resort LaDane
1805102
OJP Date 4/10/00
DLS Date 4/10100
GG
Soils Report
Soil Type Sandy Soil
Infiltration Rate 1 8 €n/hr = 015 ft/hr
SHWT Elevation 195 feet
Required Volume
Design Storm = 1 5 inches (Project Drains to SA waters)
Volume Required= 9,112 CIF
Volume Provided by I S #3
Storage Depth = 2 feet
Surface area @ Bottom = 4185 sq feet
Surface Area 0 Storage= 5990 sq feet
Bottom Elevation= 22 feet (at feast 2' above SHWT)
Storage Elevation= 24 feet /
Volume Provided= 10,175 CF 4— C'21CVl2Frd i� eil-4 �e2 h7e7��C�
Is Volume Sufficient (yes/no)? yes ^
rJ� I
Drawdown -
Drawdown Time = total volume / bottom surface area / infiltration
15 Hours
less than 5 days (yes/no) ? yes
KcmleyHom
and Anwales Inc
Drainage Basin GG
Project Information
Project Name
KHA Project #
Designed by
Checked by
Site Information
Sub Area Location
Drainage Area (DA)
Impervious Area (IA)
Percent Impervious (1)
Soils Report
Ocean Harbour -Resort LaDane
1805102
OJP Date 4/10/00
DLS Date 4/10/00
GG
341 Acres
167 Acres
49 %
Soil Type Sandy
Infiltration Rate 1 8 Whir = 015 ft/hr
Required Volume (Simple Method - preferred)
Design Storm = 1 5 inches (Projct Drains to SA waters)
Determine Rv Value= 0 05 + 009 (1) = 049 inrn
Volume Required= 9,112 CF
❑=❑ Klmley-Hom
and Associates, Inc
Sheet No 1 0/ 1
Jab subject 5wAuE5 dab No 01651PW
Des+gned by CLIP Date A 61 tit 1C l Checked by Date
f i
I I— ( it
i
I
—
1
i
'� 3�
s
F lL_ U
Lo j3bF:'5
—^L
_sEE
--I-
-- —
�m
--
Flow_Leavir►�a Bypass
Ir
Z h�
Ito 1 1 1
1. 5 s
Ye
R�vr��e
1
I
_NTo
t +a
--�-i-
I
�
I
—
I
71
E
EL-
F-1
I
!
I
I
�
Bypass Deice #3 Outflow - 2 yr Storm
Worksheet for Trapezoidal Channel
Project Description
Worksheet
Bypass Device A
Flow Element
Trapezoidal Cha
Method
Mammng's Form
Solve For
Channel Depth
Input Data
MannmgsCoeffic
0050
Slope 005000 ft/ft
Left Side Slope
025 V H
Right Side Slope
025 V H
Bottom Width
500 ft
Discharge
1337 cfs
Results
Depth
096 ft
Flow Area
84 ftz
Wetted Penmi
1288 ft
Top Width
1265 ft
Critical Depth
052 ft
Critical Slope 0050208 fttft
Velocity
158 ftls4z
Velocity Head
004 ft
Specific Eneq
100 ft
Froude Numb
034
Flaw Type 3ubcntical
Project Engineer- GTW688
u \018051021camalbypassddches fm2 Klmley-Horn & Associates Inc FlowMaster v6 0 [614b)
06/12/01 12 32 46 PM 0 Haestad Methods Inc 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of i
Bypass Device #3 Outflow -10 yr Storm
Worksheet for Trapezoidal Channel
Project Description
Worksheet
Bypass Device #
Row Element
Trapezoidal Cha
Method
Manning's form
Solve For
Channel Depth
Input Data
Mannings Coeff c
0 050
Slope 005000 Wit:
Left Side Slope
025 V H
Fight Side Slope
025 V H
Bottom Width
500 ft
Discharge
1910 cfs
Results
Depth
1 14 ft
Row Area
log ft2
Wetted Penmi
1442 ft
Top Width
1414 ft
Critical Depth
064 ft
Critical Slope 0047511 ft/ft
Velocity
175 ft/s 4E7—
Velocity Head
005 ft
Specific Eneq
1 19 ft
Froude Numb
035
Flow Type 3ubcntical
Protect Engineer GTW688
untitled fm2 Kimley-Horn & Associates Inc FlowMaster v6 0 (614b)
06/12/01 12 30 32 PM C Haestad Methods, Inc 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1