HomeMy WebLinkAboutSW7951211_CURRENT PERMIT_20200504STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW %q��O�III
DOG TYPE
� CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
DOC DATE
`,�YjnZ,si9�
YYYYMMDD
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Acting Director
Mr. Charles E. Schulz,
MCAS Cherry Point
PSC Box 8006
NORTH CAROLINA
Environmental Quality
May 4, 2020
Deputy Facilities Officer
Cherry Point, NC 28533
Subject: Stormwater Permit No. SW7951211 Renewal
MCAS Cherry Point Community Center
High Density Project
Craven County
Dear Mr. Schulz:
The Washington Regional Office received a Stormwater Management Permit
Application for renewal of the subject permit on March 27, 2020. Staff review of the
applications have determined that the permit can be reissued. We are forwarding Permit
No. SW7951211 dated May 4, 2020, for the continued operation of the subject project.
This permit, upon its effective date, will replace all previous State Stormwater permits for
this project. This permit shall be effective from September 14, 2020 until September 13,
2028 and shall be subject to the conditions and limitations as specified therein, and does
not supercede any other agency permit that may be required. Please pay special attention
to the Operation and Maintenance requirements in this permit. Failure to establish an
adequate system for operation and maintenance of the stormwater management system
will result in future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you
have the right to request an adjudicatory hearing upon written request within thirty (30)
days following receipt of this permit. This request must be in the form of a written petition,
conforming to Chapter 150B of the North Carolina General Statutes, and filed with the
Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714.
Unless such demands are made this permit shall be final and binding.
If you have any questions, or need additional information concerning this matter, please
contact me at (252) 948-3923.
Sincerely,
Roger K. Thorpe
Environmental Engineer
Norrh Carolina Deoararenr of £nvircnrnentai Quality ', Division of Energy. Mineral and Land 2esources
_ Washingron Regional Office '- 943 Washington Square mall ! Washington. North Carolina 27889
252` 46r648i
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North
Carolina as amended, and other applicable Laws, Rules and Regulations
PERMISSION IS HEREBY GRANTED TO
US Marine Corps Air Station Cherry Point
Community Center
Building 4503, Vance Road, Cherry Point, Craven County
FOR THE
construction, operation and maintenance of a wet detention pond in compliance with the
provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and
the approved stormwater management plans and specifications and other supporting
data as attached and on file with and approved by the Division of Energy, Mineral, and
Land Resources (Division) and considered a part of this permit.
This permit shall be effective from September 14, 2020 until September 13, 2028, and
shall be subject to the following specified conditions and limitations:
I. DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater
runoff as described in Section 1.6 of this permit. The stormwater control measure
has been designed to handle the runoff from 1.49 acres of impervious area.
3. The tract will be limited to the amount of built -upon area indicated in Section 1.6
of this permit, and per approved plans.
4. All stormwater collection and treatment systems must be located in either
dedicated common areas or recorded easements. The final plats for the project
will be recorded showing all such required easements, in accordance with the
approved plans.
5. The runoff from all built -upon area within the permitted drainage area of this
project must be directed into the permitted stormwater
control system.
6. The following design criteria have been provided in the wet detention pond and
must be maintained at design condition:
a. Drainage Area, acre:
4.09
b. Total Impervious Surfaces, acre:
1.49
C. Design Storm, inches:
1.0
d. Pond Depth, feet:
3.0
e. Permanent Pool Surface Area required,
ft2: 4,810
f. Permanent Pool Surface Area provided,
ft2: 10,312
g. Storage Volume required, ft3:
11,471
h. Permitted Storage Volume, ft3:
27,969
i. Controlling Orifice:
2.0"0 pipe at elev. 9.7 ft
j. Receiving Stream/River Basin:
UT to Slocum Creek/Neuse
k. Classification of Water Body:
"SC -NSW'
II. SCHEDULE OF COMPLIANCE
1. The stormwater management system shall be constructed in its entirety,
vegetated and operational for its intended use prior to the construction of any
built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of
the system will be repaired immediately.
3. The permittee shall at all time provide the operation and maintenance necessary
to assure the permitted stormwater system functions at optimum efficiency. The
approved Operation and Maintenance Plan must be followed in its entirety and
maintenance must occur at the scheduled intervals including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and re -vegetation of slopes and the vegetated filter strip.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and
specifications.
f. Debris removal and unclogging of outlet structure, orifice device, level
spreader, filter strip, catch basins and piping.
g. Access to the outlet structure must be available at all times.
4. Records of maintenance activities must be kept for each permitted SCM. The
records will indicate the date, activity, name of person performing the work and
what actions were taken.
5. The permittee shall submit to the Division of Energy, Mineral, and Land
Resources an annual summary report of the maintenance inspection records for
each SCM. The report shall summarize the inspection dates, results of the
inspections, and the maintenance work performed at each inspection.
6. Access to the stormwater facilities shall be maintained via appropriate
easements at all times.
7. The facilities shall be constructed as shown on the approved plans. This permit
shall become void unless the facilities are constructed in accordance with the
conditions of this permit, the approved plans and specifications, and other
supporting data.
8. Upon completion of construction, prior to issuance of a Certificate of Occupancy,
and prior to operation of this permitted facility, a certification must be received
from an appropriate designer for the system installed certifying that the permitted
facility has been installed in accordance with this permit, the approved plans and
specifications, and other supporting documentation. Any deviations from the
approved plans and specifications must be noted on the Certification, A
modification may be required for those deviations.
9. If the stormwater system was used as an Erosion Control device, it must be
restored to design condition prior to operation as a stormwater treatment device,
and prior to occupancy of the facility.
10. The permittee shall submit to the Director and shall have received approval for
revised plans, specifications, and calculations prior to construction, for any
modification to the approved plans, including, but not limited to, those listed
below:
a. Any revision to any item shown on the approved plans, including the
stormwater management measures, built -upon area, details, etc.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area or to the
drainage area.
e. Further subdivision, acquisition, lease or sale of all or part of the project
area. The project area is defined as all property owned by the permittee,
for which Sedimentation and Erosion Control Plan approval or a CAMA
Major permit was sought.
f. Filling in, altering, or piping of any vegetative conveyance shown on the
approved plan.
11. The Director may notify the permittee when the permitted site does not meet one
or more of the minimum requirements of the permit. Within the time frame
specified in the notice, the permittee shall submit a written time schedule to the
Director for modifying the site to meet minimum requirements. The permittee
shall provide copies of revised plans and certification in writing to the Director
that the changes have been made.
12. The permittee shall submit final site layout and grading plans for any permitted
future areas shown on the approved plans, prior to construction.
13. A copy of the approved plans and specifications shall be maintained on file by
the Permittee at all times.
III. GENERAL CONDITIONS
This permit is not transferable except after notice to and approval by the Director.
In the event of a change of ownership, or a name change, the permittee must
submit a completed Name/Ownership Change form, to the Division of Energy,
Mineral, and Land Resources, signed by both parties, and accompanied by
supporting documentation as listed on page 2 of the form. The project must be in
good standing with the Division. The approval of this request will be considered
on its merits and may or may not be approved.
2. The permittee is responsible for compliance with all permit conditions until such
time as the Division approves the transfer request.
3. Failure to abide by the conditions and limitations contained in this permit may
subject the Permittee to enforcement action by the Division of Energy, Mineral,
and Land Resources, in accordance with North Carolina General Statute 143-
215.6A to 143-215.6C.
4. The issuance of this permit does not preclude the Permittee from complying with
any and all statutes, rules, regulations, or ordinances, which may be imposed by
other government agencies (local, state, and federal) having jurisdiction.
5. In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action,
including those as may be required by this Division, such as the construction of
additional or replacement stormwater management systems.
6. The permittee grants DEQ Staff permission to enter the property during normal
business hours for the purpose of inspecting all components of the permitted
stormwater management facility.
7. The permit issued shall continue in force and effect until revoked or terminated.
The permit may be modified, revoked and reissued or terminated for cause. The
filing of a request for a permit modification, revocation and re -issuance or
termination does not stay any permit condition.
8. Unless specified elsewhere, permanent seeding requirements for the stormwater
control must follow the guidelines established in the North Carolina Erosion and
Sediment Control Planning and Design Manual.
9. Approved plans and specifications for this project are incorporated by reference
and are enforceable parts of the permit.
10. The issuance of this permit does not prohibit the Director from reopening and
modifying the permit, revoking and reissuing the permit, or terminating the permit
as allowed by the laws, rules and regulations contained in Title 15A NCAC
21-1.1000, and NCGS 143-215.1 et.ai.
11. The permittee shall notify the Division of any name, ownership or mailing address
changes at least 30 days prior to making such changes.
12. This permit shall be effective from September 14, 2020 until September 13,
2028. Application for permit renewal shall be submitted 180 days prior to the
expiration date of this permit and must be accompanied by the processing fee.
Permit issued this the 411 day of May 2020.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
---�--=_----------���� For
Brian Wrenn, Acting Director
Division of Energy, Mineral and Land Resources
By Authority of the Environmental Management Commission
Permit Number SW7951211
ULMLK USL UNLY W,
Date Received Fee Paid Permit Number
oS t:)-
NC DEQ Division of Energy, Mineral and Land Resources
STATE STORMWATER:
PERMIT RENEWAL APPLICATION FORM
In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days
prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781)
Section 60.(c). This application form is for permit renewals only. Z 7 2020
A. PROJECT INFORMATION
1. State Stormwater Permit Number: SW7951211
2. Project name: MCAS Cherry Point Community Center _
3. Project street address: Building 4503, Vance Road
City: Cherry Point County: Craven ZIP
28533
4. What, if any, changes have been made to the project as permitted? None
If the project has changed from the original approved plans, please complete SWU-101 for a Major
Modification or Minor Modification Application form available at. https://deg.nc.gov/about/divisions/energy-
mineral-land-resources/energy- mine ral- Ian d-ruleslstormwater-programlpost-construction.
B. PERMITTEE INFORMATION
If changes to the permittee or project name have been made, please complete either the Permit Update form
or the Permit Transfer form available at. https:/ldeg. nc.gov/about/divisions/energy-mineral-land-
resources/energy-mineral-land-ruleslstormwater-p_r-ogramlpost-construction. State Stormwater Permits do not
automatically transfer with the sale of the property.
1. Current Permit Holder's Company Name/Organization: Marine CorpAir Station Cher Point
2. Signing Official's Name: Charles E. Schulz
3, Signing Official's Title: Deputy Facilities Director
4. Mailing Address: PSC Box 8006
City: Cherry Point w State: NC ZIP
28533
5. Street Address: Building 4223, Access Road
City: Cherry Point State: NC ZIP :
28533
6. Phone: (252) 466-3148 Email: charles.e.schulz(d)usmc.mil
Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018
C. SUBMITTAL REQUIREMENTS
Submit the application package to the appropriate DEMLR Regional Office (Coastal, SR Waters) or DEMLR
Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only applications packages that
include all required items listed below will be accepted and reviewed.
Ini . I each item below to indicate that the required information is provided in the application package:
1. A permit application processing fee of $505,00 payable to NCDEQ.
2. One original signed hard copy and one electronic copy of this completed form. The signing official
named on this application to represent the current permittee must meet one of the following:
a. Corporation — a principle executive officer of at least the level of vice-president;
b. Limited Liability Company (LLC) — a manager or company official as those terms are defined
in G.S. 57D "North Carolina Limited Liability Company Act;"
c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee;
d. Partnership or limited partnership — the general partner;
e. Sole proprietor; or
f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the
signature of another entity.
NA 3.
One hard copy and one electronic copy of recorded documents required by the original permit that have
not yet been received by DEMLR, including: deed restrictions, protective covenants,
condominiumlplanned community declaration and easements. If the project has been built, incl ude
documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If
the project has not been built, include a signed agreement that the final recorded deed restrictio
and protective covenants will be submitted at a later date.
ns
4. O&M Agreements, Please select one:
® I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to
keep this on file with the permit; or
El I do not have a copy of the current recorded O&M Agreement for all SCMs and am
requesting a copy be sent to me. I agree to keep this on file with the permit.
5
Designer Certifications, Please select one:
® A copy of the certification(s) confirming that the project was built in accordance with the
approved plans have been previously provided to the Division; or
❑ A copy of the certification(s) confirming that the project was built in accordance with the
approved plans are enclosed; or
❑ The project has not yet been built.
[IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a
signed, sealed, and dated letter from a licensed professional stating that the SCMs have been
inspected, and that they have been built and maintained in accordance with the permit.
NA 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide
one hard copy and one electronic copy of documentation from the NC Secretary of State, or other
official documentation, which supports the titles and positions held by the persons listed in Section
C.2 per 15A NCAC 2H. 1043(3)(b).
httpsalwww,sosnc.gov/online services/search/by title/ Business Registration
Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018
D. PER(�a M�IITTEEE'IS.�C�E(RTIFICATION/"� �7
11. V li�• ��' " �/ the person legally responsible for the permit, certify that I have
a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am
responsible for the performance of the maintenance procedures, and the site has been and will be maintained
according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs
or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the
project. SCMs, or ownership. All information provided on this permit renewal application is, to the best of my
knowledge, correct andZcopfolete.
Signature: Date: 17.49AV . )
NOTARIZATION-
, I/IMK�Yi rA 77 4/9 t
UV -Yy 1 V i �7County of
that
this the day of
execution of the forgoing instrument. Witness my hand and official seal,
(Notary Sea!)
Notary Signature: V,/tA,,
v
My commission expires ?/3
a Notary Public for the State of
do hereby certify
personally appeared before me
20LA-1 , and acknowledge the due
\Q� Notary Pubi'icA
(0 onslow
= county _
MY Comm. Exp.
l�101110W"
Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018
i
�
., 4
�
,� �
+
,-
1
1.� ..
�•� �
.. �� � � Y
_ � t � `,
" J
i ., �
UNITED STATES MARINE CORPS
MARINE CORPS AIR STATION
POSTAL SERVICE CENTER BOX 8003
CHERRY POINT, NORTH CAROLINA 28533-0003
Professional Engineer's Certification
I, Dale A. McFarland, a duly registered Professional Engineer in the State of North Carolina, have
reviewed the approved plans for Stormy+rater Permit No. SW7951211 and have inspected the existing
conditions at the Nugent Cove Community Center. I have determined to the best of my knowledge and
abilities that:
1. The project's built -upon area and stormwater management features were constructed in accordance
with the approved plans, specifications, and correspondence.
2. The stormwater control measures (SCMs) have been built in compliance with the permit and are
functioning; as intended. Operation and maintenance of the SCMs has been completed in substantial
compliance -,vith the permit.
, JIIIIIfIif,-
�.F Cp6AaCo7pa GiJ�/ Fi'
o �I3M
do F. n
Dale A. McFarland
Registration #025438
UNITED STATES MARINE CORPS 1RIECEIVED MAR 2 % 200
MARINE CORPS AIR STATION
POSTAL SERVICE CENTER BOX 8003
CHERRY POINT, NORTH CAROLINA 28533-0003
IN REPLY REFER T0;
5090/29522
LN
March 16, 2020
North Carolina Department of
Environmental Quality
Division of Energy, Mineral, and Land Resources
943 Washington Square Mall
Washington, North Carolina 27889
SUBJECT: STATE STORMWATER PERMIT NO. SW7951211 RENEWAL APPLICATION
Please see enclosed the State Stormwater permit renewal package
for Stormwater Permit SW7931211 which services the Nugent Cove and
SNCO Pool at Marine Corps Air Station, Cherry Point. The system
consists of a wet detention pond. The permit is set to expire
September 13, 2020.
We thank you for your consideration on this matter. If there are
any further questions or comments, please contact Mr. Nathan Arnett of
the Environmental Affairs Department at 252-466-5271 or
nathan.arnett@usmc.mil.
Since ly,
C. E. SCHULZ
Deputy Facilities Director
By direction of the
Commanding Officer
Enclosure: Stormwater Permit Renewal Package SW7951211
w A
Michael F. Easley, Governorw ` Z Ro
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Mr. G. W. Radford
Environmental Affairs Department
Marine Corps Air Station Cherry Point
PSC Box 8006
Cherry Point, NC 28533
Dear Mr. Radford:
Alan W. Klimek, P.E. Director
Division of Water Quality
DIVISION OF WATER QU,
September 13, 2006
Subject: Permit No. SW7951211 Renewal
MCAS Cherry Point Community Center
High Density Stormwater Project
Craven County
The Washington Regional Office received a completed Stormwater Renewal Application for the subject
project on June 27, 2006. Staff review of the files and an on site inspection has determined that the project will comply
with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW7951211
dated September 13, 2006 to Marine Corps Air Station, Cherry Point for a wet detention pond to serve the Community
Center located on Vance Road at the Marine Corps Air Station in Cherry Point, NC.
This permit shall be effective from the date of issuance until September 13, 2016 and shall be subject to the
conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance
requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater
management system will result in future compliance problems. The issuance of this permit does not resolve any
previous violations of the stormwater rules for construction without a permit.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to
request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This
request must be in the form of a written petition, conforming to Chapter 1508 of the North Carolina General Statutes,
and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such
demands are made this permit shall be final and binding.
If you have any questions, or need additional information concerning this matter, please contact Roger
Thorpe or me at (252) 946-6481.
;S'cerely
,
Al Hod R i� nal Su ervisor
g ego p
Surface Water Protection Section
Washington Regional Office
cc: /V�ashington Regional Office
Central Files
North Carolina Division of Water Quality [nternei: WWW nc++aterQuuiit '.org One
943 Washington Square Mall Phone 1252) 946-6481 NO hCarohna
Washington, NC 27889 Fax (2521946-9215 ;atura!!y
State Stormwater Management Systems
Permit No. SW7951211
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and
other applicable Laws, Rules, and Regulations
PERMISSION 1S HEREBY GRANTED TO
Marine Corps Air Station, Cherry Point
Community Center
Craven County
FOR THE
continued, operation and maintenance of stormwater management systems in compliance with the provisions of 15A
NCAC 2H.1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans
and specifications and other supporting data as attached and on file with and approved by the Division of Water
Quality and considered a part of this permit for a wet detention pond to serve the Community Center located on
Vance Road at the Marine Corps Air Station in Cherry Point, NC.
This permit shall be effective from the date of issuance until September 13, 2016 and shall be subject to the following
specified conditions and limitations:
I. DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater described in the application
and other supporting data.
2. This stormwater system has been approved for the management of stormwater runoff as described on page
2 of this permit, the Project Data Sheet,
3. A maximum of 1,49 acres of built upon area is allowed.
4. All stormwater collection and treatment systems must be located in either dedicated common areas or
recorded easements. The final plats for the project will be recorded showing all such required easements, in
accordance with approved plans.
5. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of
the permit.
4
DIVISION OF WATER QUALITY
PROJECT DATA
Project Name: Community Center
Permit Number: SW7951211
Location: Craven County
Applicant: MCAS, Cherry Point
Mailing Address: PSC Box 8006
Cherry Point, NC 28533-0006
Application Date: 6/27/2006
Receiving Stream: UT to Slocum Creek
Classification of Water Body: SC — NSW
Drainage area: 4.09 ac
Total Impervious allowed: 1.49 ac
Pond Depth:
3.0 ft
Required Storage Volume:
11,471 cf
Provided Storage Volume:
27,969 cf
Required Surface Area:
4,810 sf
Provided Surface Area: 10,312 sf
Controlling Orifice: 2 inch at an elevation of 9.7 ft
6.. No homeowner/lot ownerldeveloper shall be allowed to fill in, alter, or pipe any Vegetative practices (such as
swales) shown on the approved plans as part of the stormwater management system without submitting a
revision to the permit and receiving approval from the Division.
7. The following items will require a modification to the permit:
a. Any revision to the approved plans, regardless of size
b. Project name change
C. Transfer of ownership
d. Redesign or addition to the approved amount of built -upon area
e. Further subdivision of the project area.
In addition, the Director may determine that other revisions to the project should require a modification to the
permit.
The Director may notify the permittee when the permitted site does not meet one or more of the minimum
requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written
time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall
provide copies of revised plans and certification in writing to the Director that the changes have been made.
11. SCHEDULE OF COMPLIANCE
The permittee will comply with the following schedule for construction and maintenance of the stormwater
management system.
a. The stormwater management system shall be constructed in its entirety, vegetated and operational
for its intended use prior to the construction of any built -upon surfaces except roads.
b. During construction, erosion shall be kept to a minimum and any. eroded areas of the system will be
repaired immediately.
2. The facilities must be properly maintained and operated at all times. The approved Operation and
Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals.
3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted
stormwater system functions at optimum efficiency including, but not limited to:
a. Semiannual scheduled inspections (every 6 months)
b. Sediment removal
C. Mowing and revegetation of side slopes
d. Immediate repair of eroded areas
e. Maintenance of side slopes in accordance with approved plans and specifications
f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping.
4. Records of maintenance activities must be kept and made available upon request to authorized personnel of
DWQ. The records will indicate the date, activity, name of person performing the work and what actions were
taken.
5. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of
this permit, the approved plans and specifications, and other supporting data.
6. Upon completion of construction and prior to operation of this permitted facility, a certification must be
received from an appropriate designer for the system installed certifying that the permitted facility has been
installed in accordance with this permit, the approved plans and specifications, and other supporting
documentation. Mail the Certification to the Washington Regional Office, 943 Washington Square Mall,
Washington, North Carolina, 27889, attention Division of Water Quality.
A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of
five years from the date of the completion of construction.
III. GENERAL CONDITIONS
This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is
a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality
accompanied by an application fee, documentation from the parties involved, and other supporting materials
as may be appropriate. The approval of this request will be corisidered on its merits and may or may not be
approved.
2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to
enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-
215.6(a) to 143-215.6(c).
3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules,
regulations, or ordinances which may be imposed by other government agencies (local, state, and federal)
which have jurisdiction.
4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the
Permittee shall take immediate corrective action, including those as may be required by this Division, such as
the construction of additional or replacement stormwater management systems.
5. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a
permit modification, revocation and reissuance or termination does not stay any permit condition.
6. The Permittee, at least six (6) months prior to the expiration of this permit, shall submit in writing a request for
an extension along with appropriate application fee.
Permit issued this the 13 th day of September, 2006.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
far Alan W. Klimek, P.E. Director
Division of Water Quality
By Authority of the Environmental Management Commission
Permit Number SW7951211