Loading...
HomeMy WebLinkAbout20100095 Ver 1_Stormwater Info_20100311March 9, 2010 PRIME ENGINEERING VIA: Email - lia.m.gilleski@ncdenr.gov Ms. Lia Gilleski North Carolina Department of Environmental and Natural Resources Division of Water Quality 512 North Salisbury Street Raleigh, NC 27604 Re: Water Quality Permit Submittal TransMontaigne Selma Terminal Expansion Johnston County, NC Dear Ms. Gilieski: Enclosed are the following documents as a part of our submittal for Water Quality Permit: 1. Complete design drawings 2. Two (2) Level Spreader Supplemental Forms (Basin 1 & Basin 2) with supporting calculations 3. Required Items Checklist 4. Photograph of general area where level spreaders will go. 5. Operations & Maintenance Agreements (To follow in subsequent email) Please note that a representative from TransMontaigne will be signing and norarizing the O&M Agreements and we will forward once we receive on I IMAR10. Please call me if you hpve any questions or if there is any additional information that you require. erel ' L=�ffL �. Alex r ck, PE �u Project Manager MAR 1 1 2010 Prime Engineering, Inc. QENR WATER QUALITY WETLANDS AND STORMIY�'ATER BRMICH cc: Todd Eldridge, PEI Tom DeGrace, PEI File 1129-0043.000 R:\t 129-0043 TM Ethanol Rail Expansion -Selma NC\Admin\Conesp\Letters\NC DENR WQ 030910.doc 1888 Emery Street, NW Suite 300 Atlanta, GA 30318 main: 404-425-7100 2 fax: 404-425-7101 ■ www.prime-eng.com III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan I itials Sheet No. '5;c UP,-/ 1. Plans (1" 50' or larger) of the entire site showing: - W.;L Design at ultimate build-out, Off-site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Forebay (if applicable), u �High flow bypass s .uac� 9 Yp stem, Y N!A - Maintenance access, /V/A - Proposed drainage easement and public right of way (ROW), and V4 - Boundaries of drainage easement. 2. Plan details (1" = 30' or larger) for the level spreader showing: Forebay (if applicable), High flow bypass system, One foot topo lines between the level lip and top of stream bank, Proposed drainage easement, and Design at ultimate build -out. 7 3. Section view of the level spreader (1" = 20' or larger) showing: Underdrain system (if applicable), Level lip, Upslope channel, and JJ Downslope filter fabric. 4. A date-stamped photograph of the filter strip that clearly shows the type of vegetation that is present. /Y Z 5. A construction sequence that shows how the level spreader will be protected from sediment until the entire drainage area is stabilized. 6. The supporting calculations. 3 U y , l(M �cile r,"? 7. A copy of the signed and notarized operation and maintenance (0&M) agreement. 8. A copy of the deed restrictions (if required). Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Part III, page 1 of 1 NCDENR Exp m • 00 5 �0f 1,NA rk9Q P ' STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER, FILTER STRIP AND RESTORED RIPARIAN BUFFER SUPPLEMENT This form must be completely filled out, printed and submitted. DO NOT FORGET TO ATTACH THE REQUIRED ITEMS CHECKLIST AND ALL REQUIRED ITEMS (NEXT WORKSHEET)! I. PROJECT INFORMATION Project name TransMontaigne Selma Terminal Expansion Contact name Alex Brock Phone number 404425-7100 Date March 8, 2010 Drainage area number Basin 1 ll. DESIGN INFORMATION For Level Spreaders Receiving Flow From a BMP Type of BMP Drawdown flow from the BMP cfs For Level Spreaders Receiving Flow from the Drainage Area Drainage area 711,519.00 ft2 Impervious surface area 0.00 ftz Percent impervious 0.00 % Rational C coefficient 0.14 Peak flow from the 1 in/hr storm 2.29 cfs Time of concentration 24.28 min Rainfall intensity, 10 -yr storm 5.48 in/hr Peak flow from the 10 -yr storm 12.53 cfs Where Does the Level Spreader Discharge? To a grassed bioretention cell? N (Y or N) To a mulched bioretention cell? N (Y or N) To a wetland? N (Y or N) To a filter strip or riparian buffer? Y (Y or N) Please complete filter strip characterization below. Other (specify) Filter Strip or Riparian Buffer Characterization (if applicable) Width of grass ft Width of dense ground cover 53.00 ft Width of wooded vegetation ft _ Total width 53.00 ft U ( ��%I Elevation at downslope base of level lip 135.00 fmsl Q5 " j � Elevation at top of bank of the receiving water 132.00 fmsl EJ Slope (from level lip to to top of bank)5.66 % OK & A R 1 1 201 0 Are any draws present? N (Y or N) OK DENR • VK4TER pt1ALITY Level Spreader Design WETLANDS AND 5TCRumATEit BRANCIi Forebay surface area 1,277.00 sq ft OK Feet of level lip needed per cfs 13 ft/cfs Answer "Y" to one of the following: Length based on the 1 in/hr storm? Y (Y or N) Length based on the 10 -yr storm? N (Y or N) Length based on the BMP discharge rate? N (Y or N) Design flow 2.29 cfs Is a bypass device provided? Y (Y or N) OK Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and II. Design Summary, page 1 of 2 Length of the level lip Are level spreaders in series? Bypass Channel Design (if applicable) Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Dimensions of the channel (see diagram below): M B W y Peak velocity in the channel during the 10 -yr storm Channel lining material 30.00 ft Level spreader length OK. N (Y or N) N (Y or N) Y (Y or N) 2.00 ft 4.00 ft 13.00 ft 1.00 ft 2.01 Us cis Grass y W M 1 B 1 Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and II. Design Summary, page 2 of 2 t TR55 Tc Worksheet Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@2010 by Autodesk, Inc. v9.25 Hyd. No. 1 Description A Sheet Flow Manning's n -value = 0.011 Flow length (ft) = 25.0 Two-year 24 -hr precip. (in) = 2.08 Land slope (%) = 1.00 Travel Time (min) = 0.65 Shallow Concentrated Flow Flow length (ft) = 474.00 Watercourse slope (%) = 2.00 Surface description = Unpaved Average velocity (ft/s) =2.28 Travel Time (min) = 3.46 Channel Flow X sectional flow area (sqft) = 0.00 Wetted perimeter (ft) = 0.00 Channel slope (%) = 0.00 Manning's n -value = 0.300 Velocity (ft/s) =0.00 1-1 0.011 0.0 0.00 0.00 + 0.00 0.00 0.00 Paved 0.00 + 0.00 0.00 0.00 0.00 0.015 C 0.011 0.0 0.00 0.00 + 0.00 0.00 0.00 Paved 0.00 + 0.00 0.00 0.00 0.00 0.015 Totals = 0.65 3.46 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc.............................................................................. 4.12 min Aff0f*Ax NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER, FILTER STRIP AND RESTORED RIPARIAN BUFFER SUPPLEMENT This form must be completely filled out, printed and submitted. DO NOT FORGET TO ATTACH THE REQUIRED ITEMS CHECKLIST AND ALL REQUIRED ITEMS (NEXT WORKSHEET)I I, PROJECT INFORMATION Project name TransMontaigne Selma Terminal Expansion Contact name Alex Brock Phone number 404-425-7100 Date March 8, 2010 Drainage area number Basin 2 II. DESIGN INFORMATION For Level Spreaders Receiving Flow From a BMP Type of BMP Drawdown flow from the BMP cfs For Level Spreaders Receiving Flow from the Drainage Area Drainage area 257,586.00 f 2 Impervious surface area 0.00 ftz Percent impervious 0.00 % Rational C coefficient 0.23 ft Peak flow from the 1 in/hr storm 1.36 cfs Time of concentration 4.10 min Rainfall intensity, 10 -yr storm 5.48 in/hr Peak flow from the 10 -yr storm 7.45 cfs Where Does the Level Spreader Discharge? To a grassed bioretention cell? N (Y or N) To a mulched bioretention cell? N (Y or N) To a wetland? N (Y or N) To a filter strip or riparian buffer? Y (Y or N) Please complete filter strip characterization below. Other (specify) Total width Filter Strip or Riparian Buffer Characterization (if applicable) Width of grass 1,473.00 ft Width of dense ground cover 57.00 ft Width of wooded vegetation ft Total width 57.00 ft Elevation at downslope base of level lip 135.00 fmsl Elevation at top of bank of the receiving water 132.00 fmsl Slope (from level lip to to top of bank) 5.26 % OK Are any draws present? N (Y or N) OK Level Spreader Design Forebay surface area 1,473.00 sq ft OK Feet of level lip needed per cfs 13 ft/cfs Answer "Y" to one of the following: Length based on the 1 in/hr storm? Y (Y or N) Length based on the 10 -yr storm? N (Y or N) Length based on the BMP discharge rate? N (Y or N) Design flow 1.33 cfs Is a bypass device provided? Y (Y or N) OK Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Paris I. and II. Design Summary, page 1 of 2 i Length of the level lip Are level spreaders in series? Bypass Channel Design (if applicable) Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Dimensions of the channel (see diagram below): M B W y Peak velocity in the channel during the 10 -yr storm Channel lining material 30.00 ft Level spreader length OK. N (Y or N) N (Y or N) Y (Y or N) 2.00 ft 2.00 ft 6.00 ft 1.00 ft 1.86 Us cfs Grass ♦ W f M 1 B 1 Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and II. Design Summary, page 2 of 2 4 TR55 Tc Worksheet Hydraflow Hydrographs Extension for AutoCAD® Civil 3D02010 by Autodesk, Inc. v9.25 Hyd. No. 1 Description A Sheet Flow Manning's n -value = 0.011 Flow length (ft) = 100.0 Two-year 24 -hr precip. (in) = 2.08 Land slope (%) = 1.00 Travel Time (min) = 1.98 Shallow Concentrated Flow Flow length (ft) = 1494.00 Watercourse slope (%) = 2.00 Surface description = Unpaved Average velocity (ft/s) =2.28 Travel Time (min) = 10.91 Channel Flow X sectional flow area (sqft) = 4.00 Wetted perimeter (ft) = 8.00 Channel slope (%) = 1.50 Manning's n -value = 0.300 Velocity (ft/s) =0.38 0 0.011 0.0 0.00 0.00 + 0.00 0.00 0.00 Paved 0.00 + 0.00 0.00 0.00 0.00 0.015 ""I C 0.011 0.0 0.00 0.00 + 0.00 0.00 0.00 Paved 0.00 + 0.00 0.00 0.00 0.00 0.015 Totals = 1.98 = 10.91 0.00 Flow length (ft) ({0})273.0 0.0 0.0 Travel Time (min) = 11.90 + 0.00 + 0.00 = 11.90 TotalTravel Time, Tc.............................................................................. 24.80 min PRIME ENGINEERING FIRNWIWIZFWM, e JCI3 No �7Alt r�L1 IJ�it_5'7 I Int./ s��uily/C �r•`l.'Ci 7: Z' Q Cd g (fs 7 m n< _ V V —97 PAGE- OF LATE 3/,f/ C) CO I'I J T E D F)Y J1,3 1888 Emery Street, NW . Suite 300 Atlanta, GA 30318 main: 404-425-7100 . fax: 404-425-7101 ■ www.prime-eng.com