HomeMy WebLinkAbout20100095 Ver 1_Stormwater Info_20100311March 9, 2010
PRIME
ENGINEERING
VIA: Email - lia.m.gilleski@ncdenr.gov
Ms. Lia Gilleski
North Carolina Department of Environmental and Natural Resources
Division of Water Quality
512 North Salisbury Street
Raleigh, NC 27604
Re: Water Quality Permit Submittal
TransMontaigne Selma Terminal Expansion
Johnston County, NC
Dear Ms. Gilieski:
Enclosed are the following documents as a part of our submittal for Water Quality Permit:
1. Complete design drawings
2. Two (2) Level Spreader Supplemental Forms (Basin 1 & Basin 2) with supporting calculations
3. Required Items Checklist
4. Photograph of general area where level spreaders will go.
5. Operations & Maintenance Agreements (To follow in subsequent email)
Please note that a representative from TransMontaigne will be signing and norarizing the O&M Agreements and we will
forward once we receive on I IMAR10.
Please call me if you hpve any questions or if there is any additional information that you require.
erel '
L=�ffL �.
Alex r ck, PE �u
Project Manager MAR 1 1 2010
Prime Engineering, Inc. QENR WATER QUALITY
WETLANDS AND STORMIY�'ATER BRMICH
cc: Todd Eldridge, PEI
Tom DeGrace, PEI
File 1129-0043.000
R:\t 129-0043 TM Ethanol Rail Expansion -Selma NC\Admin\Conesp\Letters\NC DENR WQ 030910.doc
1888 Emery Street, NW Suite 300 Atlanta, GA 30318
main: 404-425-7100 2 fax: 404-425-7101 ■ www.prime-eng.com
III. REQUIRED ITEMS CHECKLIST
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will
result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to
indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a
requirement has not been met, attach justification.
Pagel Plan
I itials Sheet No.
'5;c UP,-/ 1. Plans (1" 50' or larger) of the entire site showing:
- W.;L Design at ultimate build-out,
Off-site drainage (if applicable),
Delineated drainage basins (include Rational C coefficient per basin),
Forebay (if applicable),
u �High flow bypass s .uac� 9 Yp stem, Y
N!A - Maintenance access,
/V/A - Proposed drainage easement and public right of way (ROW), and
V4 - Boundaries of drainage easement.
2. Plan details (1" = 30' or larger) for the level spreader showing:
Forebay (if applicable),
High flow bypass system,
One foot topo lines between the level lip and top of stream bank,
Proposed drainage easement, and
Design at ultimate build -out.
7
3. Section view of the level spreader (1" = 20' or larger) showing:
Underdrain system (if applicable),
Level lip,
Upslope channel, and
JJ Downslope filter fabric.
4. A date-stamped photograph of the filter strip that clearly shows the type of vegetation that is present.
/Y Z 5. A construction sequence that shows how the level spreader will be protected from sediment until the entire
drainage area is stabilized.
6. The supporting calculations.
3
U y , l(M
�cile r,"? 7. A copy of the signed and notarized operation and maintenance (0&M) agreement.
8. A copy of the deed restrictions (if required).
Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Part III, page 1 of 1
NCDENR
Exp m • 00 5
�0f 1,NA rk9Q
P '
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
LEVEL SPREADER, FILTER STRIP AND RESTORED RIPARIAN BUFFER SUPPLEMENT
This form must be completely filled out, printed and submitted.
DO NOT FORGET TO ATTACH THE REQUIRED ITEMS CHECKLIST AND ALL REQUIRED ITEMS (NEXT WORKSHEET)!
I. PROJECT INFORMATION
Project name TransMontaigne Selma Terminal Expansion
Contact name Alex Brock
Phone number 404425-7100
Date March 8, 2010
Drainage area number Basin 1
ll. DESIGN INFORMATION
For Level Spreaders Receiving Flow From a BMP
Type of BMP
Drawdown flow from the BMP cfs
For Level Spreaders Receiving Flow from the Drainage Area
Drainage area
711,519.00
ft2
Impervious surface area
0.00
ftz
Percent impervious
0.00
%
Rational C coefficient
0.14
Peak flow from the 1 in/hr storm
2.29
cfs
Time of concentration
24.28
min
Rainfall intensity, 10 -yr storm
5.48 in/hr
Peak flow from the 10 -yr storm
12.53
cfs
Where Does the Level Spreader Discharge?
To a grassed bioretention cell? N (Y or N)
To a mulched bioretention cell? N (Y or N)
To a wetland? N (Y or N)
To a filter strip or riparian buffer? Y (Y or N) Please complete filter strip characterization below.
Other (specify)
Filter Strip or Riparian Buffer Characterization (if applicable)
Width of grass ft
Width of dense ground cover 53.00 ft
Width of wooded vegetation ft _
Total width 53.00 ft U ( ��%I
Elevation at downslope base of level lip 135.00 fmsl Q5 " j �
Elevation at top of bank of the receiving water 132.00 fmsl EJ
Slope (from level lip to to top of bank)5.66 % OK & A R 1 1 201
0
Are any draws present? N (Y or N) OK DENR • VK4TER pt1ALITY
Level Spreader Design WETLANDS AND 5TCRumATEit BRANCIi
Forebay surface area 1,277.00 sq ft OK
Feet of level lip needed per cfs 13 ft/cfs
Answer "Y" to one of the following:
Length based on the 1 in/hr storm? Y (Y or N)
Length based on the 10 -yr storm? N (Y or N)
Length based on the BMP discharge rate? N (Y or N)
Design flow 2.29 cfs
Is a bypass device provided? Y (Y or N) OK
Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and II. Design Summary, page 1 of 2
Length of the level lip
Are level spreaders in series?
Bypass Channel Design (if applicable)
Does the bypass discharge through a wetland?
Does the channel enter the stream at an angle?
Dimensions of the channel (see diagram below):
M
B
W
y
Peak velocity in the channel during the 10 -yr storm
Channel lining material
30.00 ft Level spreader length OK.
N (Y or N)
N
(Y or N)
Y
(Y or N)
2.00
ft
4.00
ft
13.00
ft
1.00
ft
2.01 Us
cis
Grass
y W
M
1 B 1
Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and II. Design Summary, page 2 of 2
t TR55 Tc Worksheet
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@2010 by Autodesk, Inc. v9.25
Hyd. No. 1
Description A
Sheet Flow
Manning's n -value
= 0.011
Flow length (ft)
= 25.0
Two-year 24 -hr precip. (in)
= 2.08
Land slope (%)
= 1.00
Travel Time (min)
= 0.65
Shallow Concentrated Flow
Flow length (ft)
= 474.00
Watercourse slope (%)
= 2.00
Surface description
= Unpaved
Average velocity (ft/s)
=2.28
Travel Time (min)
= 3.46
Channel Flow
X sectional flow area (sqft)
= 0.00
Wetted perimeter (ft)
= 0.00
Channel slope (%)
= 0.00
Manning's n -value
= 0.300
Velocity (ft/s)
=0.00
1-1
0.011
0.0
0.00
0.00
+ 0.00
0.00
0.00
Paved
0.00
+ 0.00
0.00
0.00
0.00
0.015
C
0.011
0.0
0.00
0.00
+ 0.00
0.00
0.00
Paved
0.00
+ 0.00
0.00
0.00
0.00
0.015
Totals
= 0.65
3.46
0.00
Flow length (ft) ({0})0.0 0.0 0.0
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
Total Travel Time, Tc.............................................................................. 4.12 min
Aff0f*Ax
NCDENR
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
LEVEL SPREADER, FILTER STRIP AND RESTORED RIPARIAN BUFFER SUPPLEMENT
This form must be completely filled out, printed and submitted.
DO NOT FORGET TO ATTACH THE REQUIRED ITEMS CHECKLIST AND ALL REQUIRED ITEMS (NEXT WORKSHEET)I
I, PROJECT INFORMATION
Project name TransMontaigne Selma Terminal Expansion
Contact name Alex Brock
Phone number 404-425-7100
Date March 8, 2010
Drainage area number Basin 2
II. DESIGN INFORMATION
For Level Spreaders Receiving Flow From a BMP
Type of BMP
Drawdown flow from the BMP cfs
For Level Spreaders Receiving Flow from the Drainage Area
Drainage area
257,586.00
f 2
Impervious surface area
0.00
ftz
Percent impervious
0.00
%
Rational C coefficient
0.23
ft
Peak flow from the 1 in/hr storm
1.36
cfs
Time of concentration
4.10
min
Rainfall intensity, 10 -yr storm
5.48 in/hr
Peak flow from the 10 -yr storm
7.45
cfs
Where Does the Level Spreader Discharge?
To a grassed bioretention cell?
N (Y or N)
To a mulched bioretention cell?
N (Y or N)
To a wetland?
N (Y or N)
To a filter strip or riparian buffer?
Y (Y or N) Please complete filter strip characterization below.
Other (specify)
Total width
Filter Strip or Riparian Buffer Characterization (if applicable)
Width of grass
1,473.00
ft
Width of dense ground cover
57.00
ft
Width of wooded vegetation
ft
Total width
57.00
ft
Elevation at downslope base of level lip
135.00
fmsl
Elevation at top of bank of the receiving water
132.00
fmsl
Slope (from level lip to to top of bank)
5.26
% OK
Are any draws present?
N
(Y or N) OK
Level Spreader Design
Forebay surface area
1,473.00
sq ft OK
Feet of level lip needed per cfs
13
ft/cfs
Answer "Y" to one of the following:
Length based on the 1 in/hr storm?
Y
(Y or N)
Length based on the 10 -yr storm?
N
(Y or N)
Length based on the BMP discharge rate?
N
(Y or N)
Design flow
1.33
cfs
Is a bypass device provided?
Y
(Y or N) OK
Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5
Paris I. and II. Design Summary, page 1 of 2
i
Length of the level lip
Are level spreaders in series?
Bypass Channel Design (if applicable)
Does the bypass discharge through a wetland?
Does the channel enter the stream at an angle?
Dimensions of the channel (see diagram below):
M
B
W
y
Peak velocity in the channel during the 10 -yr storm
Channel lining material
30.00 ft Level spreader length OK.
N (Y or N)
N (Y or N)
Y (Y or N)
2.00 ft
2.00 ft
6.00 ft
1.00 ft
1.86 Us cfs
Grass
♦ W f
M
1 B 1
Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and II. Design Summary, page 2 of 2
4
TR55 Tc Worksheet
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D02010 by Autodesk, Inc. v9.25
Hyd. No. 1
Description A
Sheet Flow
Manning's n -value
= 0.011
Flow length (ft)
= 100.0
Two-year 24 -hr precip. (in)
= 2.08
Land slope (%)
= 1.00
Travel Time (min)
= 1.98
Shallow Concentrated Flow
Flow length (ft)
= 1494.00
Watercourse slope (%)
= 2.00
Surface description
= Unpaved
Average velocity (ft/s)
=2.28
Travel Time (min)
= 10.91
Channel Flow
X sectional flow area (sqft)
= 4.00
Wetted perimeter (ft)
= 8.00
Channel slope (%)
= 1.50
Manning's n -value
= 0.300
Velocity (ft/s)
=0.38
0
0.011
0.0
0.00
0.00
+ 0.00
0.00
0.00
Paved
0.00
+ 0.00
0.00
0.00
0.00
0.015
""I
C
0.011
0.0
0.00
0.00
+ 0.00
0.00
0.00
Paved
0.00
+ 0.00
0.00
0.00
0.00
0.015
Totals
= 1.98
= 10.91
0.00
Flow length (ft) ({0})273.0 0.0 0.0
Travel Time (min) = 11.90 + 0.00 + 0.00 = 11.90
TotalTravel Time, Tc.............................................................................. 24.80 min
PRIME
ENGINEERING
FIRNWIWIZFWM, e
JCI3 No
�7Alt r�L1
IJ�it_5'7 I Int./ s��uily/C �r•`l.'Ci 7: Z'
Q Cd g
(fs
7
m
n< _ V V
—97
PAGE- OF
LATE 3/,f/ C)
CO I'I J T E D F)Y J1,3
1888 Emery Street, NW . Suite 300 Atlanta, GA 30318
main: 404-425-7100 . fax: 404-425-7101 ■ www.prime-eng.com