Loading...
HomeMy WebLinkAboutNCC190989_Notice of Termination_20201014Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 10/14/2020 4:35:01 PM (NOT Submittal) Approve by Georgoulias, Bethany 10/15/2020 9:22:15 AM (NOT Request Review- NCC190989) • The task was assigned to Georgoulias, Bethany. The due date is: October 19, 2020 5:00 PM 10/14/2020 4:35 PM 1 � NORTH CAROLINA Enrlronmenral Quallly Certificate of NCC190989 Coverage (COC) Enter the Certificate of Coverage Nmber No.* Information associated with this permit Project Name Duke Energy Castle Hayne Replace Switch 22 Address Holly Shelter Road, Castle Hayne, NC County New Hanover Latitude 34.3538 Longitude -77.8928 Permittee Listed Duke Energy Progress Legally Responsible Thomas Williams Jr., PE Individual NC Reference No. NCG01-2019-0989 E&SC Plan ID NEWHA-2020-001 Original NOI 13540 Tracking No. Date COC Issued 7/17/2019 Prior Rescission Cate populates only if COCwas already rescinded at tirre of subrrittal. Date Reason for Rescission/Termination Request: Reason for F Project Closed -Out Termination of r Sale (Another Owner/Operator will apply for a new COC) Coverage * O Mistake or Invalid Coverage r Other Addional Mxe inforrration about the basis of this request, if needed. Explanation Supporting upload Supporting Docurrentation if applicable. Documentation Mist beFDFforrrat Project Close-out Information: Final Close-out 9/9/2020 Inspection Approval Project Close-out NEWHA-2020-001 20200909.pdf 20.57KB Approval Mast be RYfornil Documentation North Carolina General Statute 143-215.66 (1) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). 17 I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature t- Type Name* Thomas Williams Jr. Title * Manager Transmission Engineering Organization* Duke Energy Progress Date * 10/14/2020 Email for Thomas.WilliamsJr@duke-energy.com Confirmation * Contact Telephone* 919-546-2354 NOT Certification Notice of Termination.pdf 47.49KB Form Mast be FDF Forrrat Is this COC Already Ensure this CCChas not been rescinded since subrrittal! Rescinded? Original Permittee CCd on Wification Errails Email Thomas.WilliamsJr@duke-energy.com Original Site Contact CCd on Notificaiton Errails Email Thomas.WilliamsJr@duke-energy.com