Loading...
HomeMy WebLinkAboutNCS000466_Hillsborough 2020 Annual Report Narrative_20200909 Town of Hillsborough NPDES Phase II Stormwater Management Program ANNUAL REPORT Fiscal Year 2020 Stormwater Wetland at Gold Park Town of Hillsborough Stormwater Management Program NPDES Phase II Annual Report Fiscal Year 2020 i TABLE OF CONTENTS INTRODUCTION ........................................................................................................ 1 1. Storm Sewer System Information ............................................................... 2 1.1 Population Served ........................................................................................ 2 1.2 Growth Rate ................................................................................................. 2 1.3 Jurisdictional Area ........................................................................................ 2 1.4 MS4 Conveyance System ............................................................................ 2 1.5 Land Use Composition ................................................................................. 2 1.6 TMDL Identification ...................................................................................... 3 2. Receiving Streams ..................................................................................... 3 3. Existing Water Quality Programs ............................................................... 3 3.1 Local Programs ............................................................................................ 3 3.2 State Programs ............................................................................................ 4 4. Permitting Information ................................................................................ 4 4.1 Responsible Party Contact List .................................................................... 4 4.2 Signing Official ............................................................................................. 4 5. Co-Permit Status Information ..................................................................... 4 6. Reliance on Another Entity ......................................................................... 5 6.1 Contact Information ...................................................................................... 5 6.2 Legal Agreement .......................................................................................... 5 7. Stormwater Management Program Plan .................................................... 5 7.1 Public Education and Outreach .................................................................... 5 7.2 Public Involvement and Participation ............................................................ 8 7.3 Illicit Discharge Detection and Elimination .................................................. 10 7.4 Construction-Site Stormwater Runoff Control ............................................. 12 7.5 Post-Construction Stormwater Management .............................................. 14 7.6 Pollution Prevention/Good Housekeeping for Municipal Operations ........... 16 Town of Hillsborough Stormwater Management Program NPDES Phase II Annual Report Fiscal Year 2020 1 INTRODUCTION Why Care About Stormwater? Adding impervious surface decreases the amount of stormwater that infiltrates into the ground. This increases the amount and velocity of stormwater runoff. This can cause accelerated erosion and downstream flooding. In addition, as stormwater flows across impervious surfaces, it picks up various pollutants. These include excess nutrients, oil and grease, bacteria and sediment. Polluted stormwater flows down storm drains and ditches where it is discharged, untreated, into local streams, rivers, and lakes. Stormwater runoff pollution causes adverse impacts to aquatic ecosystems, poses human health risks, and can greatly increase the cost of treating drinking water. Program Background In 1972, the National Pollutant Discharge Elimination System (NPDES) program was established under the authority of the Federal Clean Water Act. Phase I of the NPDES Stormwater program was established in 1990. It required NPDES permit coverage for municipalities with populations of 100,000 or more. Phase II of the NPDES Stormwater program was signed into law in December 1999. The Phase II program extended permit coverage to smaller (< 100,000 pop.) communities and public entities that own or operate a municipal separate storm sewer system (MS4). It required these smaller communities to develop a stormwater program and obtain an NPDES permit for stormwater discharges. In North Carolina, the Department of Environmental Quality (NCDEQ) administers the NPDES Stormwater program. NCDEQ issued the Town of Hillsborough’s (Town) initial Phase II permit, on October 1, 2005. The permit required the Town to develop, implement, and enforce a stormwater program designed to reduce the discharge of pollutants from the MS4 to the maximum extent practicable. The program was implemented in phases over five years of the initial permit. Pursuant to the permit the stormwater program included the following six minimum measures or best management practices (BMPs): 1. Public education and outreach on stormwater impacts; 2. Public involvement/participation; 3. Illicit discharge detection and elimination; 4. Construction site stormwater runoff control (Erosion Control); 5. Post-construction stormwater management for new development and redevelopment; 6. Pollution prevention/good housekeeping for municipal operations. The Town’s current permit, Number NCS000466, was issued on February 27, 2017. This annual report reflects reporting requirements pursuant to the permit. Numbers reported are for the fiscal year 2019-2020, which runs from July 1, 2019 to June 30, 2020 and is referred to hereafter as FY2020. Town of Hillsborough Stormwater Management Program NPDES Phase II Annual Report Fiscal Year 2020 2 1. Storm Sewer System Information 1.1 Population Served Estimated population served ........................ 7,4831 1.2 Growth Rate Estimated increase 2010-2018 .................... 22.9%2 Estimated annual increase 2010-2018 ......... 2.87% 1.3 Jurisdictional Area Town Limits ................................................. 5.6 sq. mi ETJ .............................................................. 3.5 sq. mi. 1.4 MS4 Conveyance System Due to the age of the town, MS4 consists of a variety of stormwater conveyances and components. These range from typical curb and gutter systems conveyed by concrete pipes to simple sheet flow. The predominate conveyance components include grass lined swales and vegetated drainage ditches with various pipes and culverts. There are also various detention systems within the Town’s jurisdiction, however these are on private property. MS4 system components are periodically inspected to ensure proper function. The North Carolina Department of Transportation (NCDOT) maintains systems within state road rights-of-way. Systems located on private property, including detention facilities and other engineered stormwater controls, are maintained by the owner. 1.5 Land Use Composition Estimated Land Use3 Residential ................................................... 35% Commercial ................................................. 30% Industrial ...................................................... 5% Open Space................................................. 30% Total ............................................................ 100% 1 July 2018 Data from North Carolina Office of Budget and Management, State Demographics Data, http://www.osbm.state.nc.us/. 2 Percentage increase from 2010 to 2018 (North Carolina Office of Budget and Management, State Demographics Data, http://www.osbm.state.nc.us/.) 3 Land use percentages were estimated from the Town of Hillsborough Land Use GIS database. Area of parcels for each designated land use type were summed and calculated for relative percentage of the planning jurisdictional area. Town of Hillsborough Stormwater Management Program NPDES Phase II Annual Report Fiscal Year 2020 3 1.6 TMDL Identification Currently, no streams flowing into or out of the Town of Hillsborough’s jurisdiction have an associated Total Maximum Daily Load. 2. Receiving Streams The Town of Hillsborough lies entirely within the Falls Lake Watershed, which is part of the Neuse River Basin. Specifically, the Town drains to the Eno River. Specific receiving waters are listed below. Receiving Stream Description Classification Index No. Eno River (Corporation Lake, Lake Ben Johnston) From a point 0.4 mile upstream of Dry Run to dam at Lake Ben Johnston (Orange County water supply intake & Town of Hillsborough water supply intake) WS-II; HQW, CA, NSW 27-2-(3.5) Eno River From dam at Lake Ben Johnston to Orange County SR 1561 C; NSW, N 27-2-(7) Seven Mile Creek From a point 0.4 mile upstream of I-85 to Lake Ben Johnston, Eno River WS-II; HQW, CA, NSW 27-2-6-(1.5) Rocky Run From a point 0.5 mile upstream of I-85 to Seven Mile Creek WS-II; HQW, NSW 27-2-6-2-(2) Cates Creek From source to Eno River C; NSW 27-2-8 Strouds Creek From source to Eno River C; NSW 27-2-9 Stony Creek From source to a point 0.4 mile upstream of Orange County SR 1710 C; NSW 27-2-13-(1) 3. Existing Water Quality Programs 3.1 Local Programs The following programs and ordinances are being implemented within the Town of Hillsborough’s jurisdiction. Unified Development Ordinance (UDO) – regulates overall development and land use. Specific water quality aspects include local stream buffer rules and post construction stormwater requirements, including nutrient limits. Flood Damage Prevention – through its UDO the Town protects water quality by preventing new development within flood hazard zones. Local Nutrient Sensitive Waters (NSW) Strategy - through its UDO the Town adopted stormwater requirements for new development to meet the Falls Lake Nutrient Management Strategy (Falls Lake rules). Town of Hillsborough Stormwater Management Program NPDES Phase II Annual Report Fiscal Year 2020 4 Delegated Erosion and Sediment Control Program - as noted in Section 6, the Town relies on Orange County to conduct an erosion control program. Orange County has local delegated authority from the state. 3.2 State Programs State programs, including the Neuse, Falls Lake, and Water Supply Watershed rules are implemented at a local level. The Town of Hillsborough does rely on NCDOT to maintain stormwater facilities and programs within state-owned road rights-of-way. 4. Permitting Information The Town’s Stormwater Program is under direction of the Stormwater and Environmental Services Manager. Stormwater and Environmental Services is a division of the Town’s Planning Department. The Stormwater and Environmental Services Division works closely with Utilities, Public Works and Planning departments, and is supervised by the Assistant Town Manager/Planning Director. 4.1 Responsible Party Contact List Overall implementation and oversight of the Town’s Stormwater Program is directed by: Terry Hackett, Stormwater & Environmental Services Manager Town of Hillsborough P.O. Box 429 101 E. Orange Street Hillsborough, NC 27278 Telephone: 919-296-9621 Email: terry.hackett@hillsboroughnc.gov 4.2 Signing Official The Town of Hillsborough operates under a council-manager form of government. The town manager is responsible for management and oversight of the Town’s daily operations. Contact information is listed below: Eric Peterson, Town Manager Town of Hillsborough 101 E. Orange Street P.O. Box 429 Hillsborough, NC 27278 Telephone: 919-296-9421 Email: eric.peterson@hillsboroughnc.gov 5. Co-Permit Status Information The Town of Hillsborough holds its own NPDES Phase II permit and does not co- permit with another entity. Town of Hillsborough Stormwater Management Program NPDES Phase II Annual Report Fiscal Year 2020 5 6. Reliance on Another Entity The Town of Hillsborough utilizes Orange County to implement the Construction Site Stormwater Runoff Control (i.e. erosion control) portion of its stormwater program. 6.1 Contact Information Erosion Control Program: Craig Benedict, Director Orange County Planning and Inspections Department 131 W Margaret Lane, Suite 201 Hillsborough, NC 27278 919-245-2585 cbenedict@orangecountync.gov 6.2 Legal Agreement The Town maintains an inter-local agreement with Orange County to provide erosion control services. The current agreement was approved in October 2012. 7. Stormwater Management Program Plan The following sections briefly describe the Town’s stormwater management program for each of the six BMPs. Detailed information regarding each program area can be found in the Town’s comprehensive stormwater management plan, available on the Town’s website. 7.1 Public Education and Outreach The objective of the Town’s stormwater public education and outreach program is to increase citizen awareness of stormwater runoff pollution and related issues. The Town’s stormwater public education and outreach program includes the following primary components: • Disseminate Educational Materials The Town disseminates educational materials that are either developed in- house or use existing materials available from other agencies. These materials are distributed electronically, at educational programs, special events and directly to individual citizens or businesses. • Stormwater Newsletter, Articles and Press Releases The Town publishes the Stormwater Almanac, a newsletter that educates and informs citizens about stormwater management issues within the Town. In addition, Town stormwater staff often write articles on various stormwater program related topics that are published in other periodicals. Stormwater staff also coordinates with the town’s Public Information Office for press releases from the Town highlighting stormwater management related issues, stormwater related volunteer events, etc. Town of Hillsborough Stormwater Management Program NPDES Phase II Annual Report Fiscal Year 2020 6 • School programs The Town conducts direct educational, stormwater related programs for local schools. This includes partnering with other local governmental agencies conducting environmental education programs in local schools. Annual programs include Earth Walk with local seventh grade students, Eno River field trip with Orange High AP Environmental/Earth Science classes, science night at The Expedition School, as well as other programs as requested. • Special Events and Civic Groups The Town provides stormwater education and outreach programs/materials at local special events such as “Last Fridays”, “Earth Evening” and “Citizens Academy.” Town stormwater staff also provides educational programs to various civic groups, including local scout units, homeowner associations, churches and various other groups. • Social Media The Town maintains a Facebook page (www.facebook.com/ToHGovSW/) and Twitter account (@ToHGovSW) for the Stormwater and Environmental Services Division. Weekly posts provide education on pollution prevention, encourage citizens to explore nature and enjoy the Town’s water resources, and promote special events and volunteer workdays. • Clean Water Education Partnership. The Town of Hillsborough actively participates in the Clean Water Education Partnership (CWEP). CWEP assists member governments with their stormwater outreach and education program by leveraging member dues to conduct various media campaigns. The FY2020 CWEP annual report can be accessed from their website, http://www.nccwep.org/. CWEP summary statistics are provided in Section 7.1.5, below. FY2020 Summary statistics for the primary components of the Town’s Public Education and Outreach Program are provided in the following sections. Please note that due to the COVID-19 pandemic, programs and events typically held in the spring were canceled. 7.1.1 School Program Statistics School Stormwater Education Programs - FY2020 Program Students Giveaways/ Certificates A.L. Stanback – Earthwalk 238 24 C.W. Stanford – Earthwalk 194 20 Gravelly Hill – Earthwalk 152 14 Total 584 58 Town of Hillsborough Stormwater Management Program NPDES Phase II Annual Report Fiscal Year 2020 7 7.1.2 Outreach, Special Events and Other Program Statistics4 Outreach, Special Events and Other Programs - FY2020 Program Participants Handouts/ Giveaways TES – Robotic Teams 21 11 Hillsborough Rotary Club 9 -- Total 30 11 7.1.3 Newsletters, Articles and Press Release Statistics Newsletters, Articles and Press Release Statistics – FY2020 Stormwater Almanac (newsletter) Issues Published 2 Stormwater Related Press Releases 4 Stormwater Related Articles Written/Published 1 7.1.4 Town of Hillsborough Social Media Statistics Social Media Posts - FY2020 Statistic Facebook Twitter Posts 62 56 Followers 151 191 Impressions 14,373 28,500 Facebook Post Statistics - FY2020 Statistic Total Average per Post Post Reach5 10,362 167 Post Impressions6 12,797 206 Engaged Users7 770 12 4 Due to the COVID-19 pandemic, programs and events scheduled for the spring of 2020 were cancelled. 5 Count of people for whom the post entered their screen 6 Count of times a post entered a person's screen 7 Count of people who engaged with the post, including liking, comm enting, and sharing Town of Hillsborough Stormwater Management Program NPDES Phase II Annual Report Fiscal Year 2020 8 7.1.5 CWEP Media Statistics CWEP Statistics – FY20208 Town’s FY2020 Cost Share $2,302.00 Market Triangle Market Cinema Campaign 506,294 impressions Spectrum Digital Campaign 1,581,086 impressions Capitol Broadcasting Company Digital Campaign 11,478,556 impressions La Notica (Spanish Magazine) 1,172,500 impressions Social Media Campaign 847 engagements Website Performance 7,753 visitors9 Hillsborough’s Estimated Share 53,382 impressions 7.2 Public Involvement and Participation The objective of the Town’s public involvement and participation program is to strengthen citizen engagement in stormwater and environmental issues affecting the Town. Public Involvement and participation includes providing volunteer opportunities, exchanging information with citizens and elected officials, and providing public assistance on stormwater related issues. • Volunteer Opportunities Town Stormwater and Environmental Services Division staff coordinates volunteer opportunities to raise awareness of stormwater runoff pollution, engage citizens and ultimately reduce target pollutants. Volunteer opportunities regularly include trash/litter clean-ups, wetland/riparian vegetation planting, invasive species removal/monitoring, qualitative stream monitoring, and maintenance of the Town’s pollinator/rain gardens and stormwater wetland. • Public Meetings At a minimum, Town Stormwater and Environmental Services Division staff presents one update to Hillsborough’s elected Town Board of Commissioners regarding the stormwater program, annually. As part of the presentation, Town Commissioners can provide input on pertinent issues. Staff may also provide presentations to other Town advisory boards as requested. 8 Impressions listed for campaigns are totals for the entire market. Hillsborough’s mass media impressions are estimated based on the town’s population size. 9 CWEP website visitors during mass media campaign March-July. Town of Hillsborough Stormwater Management Program NPDES Phase II Annual Report Fiscal Year 2020 9 • Public Assistance Town Stormwater and Environmental Services staff provides assistance to citizens regarding stormwater pollution prevention, riparian buffer regulation, drainage issues and other related topics. This includes site visits and investigations as necessary. In addition to the items listed above, the Town maintains a website with pertinent stormwater information. This includes email and phone numbers of stormwater staff so that citizens can report concerns. Other than emails and calls received, Town Stormwater and Environmental Services staff does not report website statistics. FY2020 Summary statistics for the primary components of the Town’s Public Involvement and Participation Program are provided in the following sections. Please note that due to the COVID-19 pandemic, volunteer opportunities planned for the spring were canceled. 7.2.1 Volunteer Opportunity Statistics Litter/Trash Clean-ups – FY2020 Number of Events 4 Number of Volunteers 63 Miles Cleaned 3.0 Pounds Collected 588 Tree/Wetland Plantings - FY202010 Name/Location Participants Trees/ Plants Acres Public Works Restoration Project 35 60 0.2 Total 35 60 0.2 Volunteer Monitoring – FY202011 Number of Groups 1 Number of Monitoring Locations 2 Total Number of Volunteers 6 Number of Actions Completed as a result12 0 10 Spring volunteer planting events, including annual volunteer maintenance of the Town’s stormwater wetland at Gold Park were canceled due to the COVID-19 pandemic 11 Volunteer monitoring events that the Town typically organize in the spring did not occur due to the COVID - 19 pandemic. 12 Results of monitoring indicated no water quality issues, so no actions were taken. Town of Hillsborough Stormwater Management Program NPDES Phase II Annual Report Fiscal Year 2020 10 7.2.2 Public Meeting Statistics Stormwater Related Public Meetings FY2020 Number of Public Meetings 5 Number of Attendees 84 7.2.3 Public Assistance Statistics Public Assistance – FY2020 Number of Calls, Complaints, Issues 14 Number Resolved 13 7.3 Illicit Discharge Detection and Elimination The Town’s stormwater illicit discharge detection and elimination program (IDDE) is outlined in its Illicit Discharge Detection and Elimination Plan and is enforced through the Town code. This plan details measures that Town Stormwater and Environmental Services Division staff follows to find and eliminate illicit discharges and connections to the MS4. The primary components of this plan are described below: • MS4 Mapping The Town maintains a GIS map and database of the stormwater infrastructure within town limits. This includes pipes, ditches, swales catch basins, inlets, outlets and stormwater outfalls. The Town defines stormwater outfalls more broadly than EPA definitions. This conservative approach allows Town Stormwater and Environmental Services Division staff to evaluate outfalls as time allows and may eliminate some as stormwater outfalls, if appropriate. Currently, there are approximately 123 stormwater outfalls located within the Town’s jurisdiction. • High Priority Areas The Town’s Illicit Discharge Detection and Elimination Plan calls for the identification of high priority areas for IDDE screening investigations. The Town has designated four high priority areas: Downtown, Central Business District, West Hillsborough, and Meadowlands. These areas reflect a relatively high development density as well as a concentration of light industrial and commercial land use. • Illicit Discharge Investigation In general, this includes screening of high priority areas, dry weather inspections of stormwater outfalls and investigation of complaints/concerns submitted by citizens or by other town employees. Town of Hillsborough Stormwater Management Program NPDES Phase II Annual Report Fiscal Year 2020 11 • Sanitary Sewer Overflows While a sanitary sewer overflow (SSO) is ultimately the responsibility of the Town’s Utility Department, overflows can reach the stormwater system and/or receiving waters and are considered an illegal discharge. Therefore, statistics for SSO’s are included below. • Employee Cross-Training An important aspect of the town’s IDDE program is to provide training to other town employees in recognizing and reporting possible illicit discharges and connections. In FY2020, stormwater program training materials were updated by staff. Stormwater training now has three modules which include: Module 1 – Why Care about Stormwater? Provides an overview of stormwater runoff pollution, impacts to the environment, and the town’s stormwater program; module 1 is recommended for all town employees. Module 2 – Recognizing Illicit Discharges Specifically discusses the town’s IDDE program and how employees can recognize possible illicit discharges and report them to stormwater staff; module 2 is recommended for field employees in the Utilities, Public Works and Police departments. Module 3 – Stormwater Pollution Prevention Discusses the importance of good housekeeping and other best management practice measures at town owned facilities; while this training is good for all employees it is primarily geared towards employees that work at Fleet Maintenance, Water Treatment, Wastewater Treatment, and employees that repair and maintain town infrastructure such as sanitary sewers, water lines, stormwater infrastructure, streets, etc. FY2020 Summary statistics for the primary components of the Town’s IDDE Program are provided in the following sections. 7.3.1 Illicit Discharge Statistics Illicit Discharge Summary – FY2020 Illicit Discharge Screening & Inspection Screening Investigations conducted 11 Dry weather inspections conducted 11 Illicit discharges found 0 Illicit connections found 0 Illicit discharges/connections resolved 0 NOVs Issued 0 Town of Hillsborough Stormwater Management Program NPDES Phase II Annual Report Fiscal Year 2020 12 Illicit Discharge Summary – FY2020 (continued) Individual Complaints & Investigations Number of Complaints/Investigations 7 Investigations resolved 7 NOVs Issued 0 7.3.2 Sanitary Sewer Statistics SSO Summary – FY2020 Number of SSO’s 0 Reported to state 0 Causes identified n/a Sites repaired n/a Total Volume of SSO’s (gallons) 0 Volume reaching surface waters (gallons) 0 7.3.3 Cross-Training Statistics Employee Stormwater Training – FY2020 Module Number of Employees Module 1 – Why Care About Stormwater? 31 Module 2 – Recognizing Illicit Discharges 27 Module 3 – Stormwater Pollution Prevention 27 7.4 Construction-Site Stormwater Runoff Control Orange County implements and enforces construction site stormwater runoff control for the Town of Hillsborough through its erosion control program. Orange County has local delegated authority from the state to implement an erosion control program. Legal agreements are in place allowing Orange County to enforce its sedimentation and erosion control ordinance within the Town’s jurisdiction except for publicly funded projects, which are subject to state jurisdiction. Active construction projects are inspected regularly by Orange County Erosion Control staff. Inspection reports, notice of violations (NOVs) and stop work orders are provided to Town Stormwater and Environmental Services staff. In addition, the Town is required to conduct periodic audits/inspections of active construction sites, including Town construction projects, to help ensure compliance. Generally, Town Stormwater and Environmental Services Division staff typically inspect active construction sites once a month and conduct brief site visits more frequently. Town of Hillsborough Stormwater Management Program NPDES Phase II Annual Report Fiscal Year 2020 13 FY2020 Summary statistics for the primary components of the Town’s Construction-Site Stormwater Runoff Control Program are provided in the following sections. 7.4.1 Erosion Control Projects Reviewed/Permitted FY2020 ECP Review Summary – FY2020 Project Name Tract Size (acres) Area Disturbed (acres) Daphine Drive Subdivision 4.85 1.35 Forest Ridge Phase 4 11.75 8.4 Hillsborough Commons Outparcel 1.13 0.75 Mavis Discount Tire 0.81 0.55 Waterstone MOB 4.75 3.37 Totals 23.29 14.42 7.4.2 Erosion Control Inspection Statistics Inspection Summary – FY2020 Active Projects Privately Owned 15 County Owned13 1 State Owned13 1 Town Owned Projects 1 Total 18 Inspection Summary – FY2020 (continued) Inspections Conducted OCEC Staff 167 Town Staff 59 Total 226 Enforcement Actions NOVs Issued 0 Stop Work Orders 0 Total 0 13 Orange County’s North Campus project and the state owned UNC Hospital expansion are subject to the Town’s post-construction stormwater management requirements, but are permitted by the state’s erosion control program. Town of Hillsborough Stormwater Management Program NPDES Phase II Annual Report Fiscal Year 2020 14 7.5 Post-Construction Stormwater Management The Town’s post-construction stormwater program includes two primary components: new development review/approval and stormwater control measure (SCM) inspection. • New Development Review Proposed development projects are reviewed to determine if the Town’s stormwater standards within the Unified Development Ordinance (UDO) are met. Projects meeting those requirements are issued a stormwater management plan approval. New development projects must currently meet both the NPDES Phase II post-construction stormwater requirements and the Falls Lake Rules nutrient loading requirements. Additionally, all SCMs must meet the state’s Minimum Design Criteria (MDCs). • SCM Inspection Program The Town is required to maintain an SCM inspection program pursuant to both the NPDES Phase II regulations and the Falls Lake rules. The Town requires the owner of each SCM to inspect at least annually and submit a report to the Stormwater and Environmental Services Division. Additionally, the Town is required to inspect (or what the Town staff now calls “audit”) SCMs approved through the UDO at least once every five years. There are also SCMs within the Town’s planning jurisdiction that were approved prior to the Town’s NPDES stormwater permit issued in 2005. In March of 2013, Stormwater and Environmental Services embarked on a program to bring all SCMs within the Town’s planning jurisdiction into compliance. This process includes conducting onsite audits of private SCMs by Town Stormwater and Environmental Services Division staff as time and resources allow. The intent is to exceed the audit/inspection interval required by the NPDES and Falls Lake regulations. The goal is to complete at least a third of SCM on site audits annually. Town Stormwater and Environmental Services Division staff also tracks compliance with submittal of the required annual maintenance and inspection reports. The Town’s UDO requires all SCM owners to submit their annual inspection report by September first of each year. Stormwater and Environmental Services began a new program in FY2018 to recognize those SCM owners who have exceptional compliance records. Annually in the early spring, staff evaluates SCM owner compliance and selects a small subset of owners to be recognized. Winners are recognized via social media, town press release, and the Stormwater Almanac publication. They are also given a certificate signed by the mayor. FY2020 Summary statistics for the primary components of the Town’s Post- Construction Stormwater Management Program are provided in the following sections. Town of Hillsborough Stormwater Management Program NPDES Phase II Annual Report Fiscal Year 2020 15 7.5.1 New Development Review Statistics Development Summary of Approved Projects – FY2020 Development Name Type Site Acreage Impervious Acreage Number of SCMs Orange County Northern Campus Phase 1 Institutional 21.18 5.80 1 UNC Hospital Expansion Bed Tower II Institutional 8.97 3.04 2 Hillsborough CDJ+R Commercial 5.99 3.60 1 Mavis Tire Commercial 0.81 0.59 2 Waterstone Medical Office Building Commercial 4.57 1.31 1 Collins Ridge Phases 1&2 Residential 117.43 62.92 5 Total 158.95 77.26 12 SCMs Approved for Development Projects – FY2020 Stormwater BMP Type Quantity BayFilter 1 Filterra 2 Level Spreader and Filter Strip 1 Stormwater Wetland 1 Wet Pond with Floating Wetlands 2 Wet Pond 4 Underground Detention 1 7.5.2 SCM Inspections Statistics SCM Onsite Audit Summary – FY2020 Number of Mapped SCMs 122 Audits/Inspections Conducted 33 Maintenance Issues Identified 27 Maintenance Issues Resolved as a Result 8 Violations Noted 0 NOVs Issued 0 Town of Hillsborough Stormwater Management Program NPDES Phase II Annual Report Fiscal Year 2020 16 7.5.3 SCM Annual Maintenance Inspection Report Compliance Annual Inspection Reports Received – FY2020 Y ear No. of SCMs Compliant 2013 63 13% 2014 66 47% 2015 72 71% 2016 85 73% 2017 87 76% 2018 91 78% 2019 95 87% 2020 122 72% 7.6 Pollution Prevention/Good Housekeeping for Municipal Operations The Town’s pollution prevention/good housekeeping program includes five primary components: evaluate Town operations, corrective action, MS4 maintenance, employee training, and public awareness. • Pollution Prevention/Good Housekeeping Inspections Evaluating Town operations and taking corrective action are part of the pollution prevention/good housekeeping inspection process. Stormwater and Environmental Services staff conduct annual inspections of each town-owned facility. Facilities are given one of three ratings: compliant, compliant with conditions or non-compliant. Facilities rated compliant with conditions typically have just one or two minor issues that need corrected. Non-compliant facilities either have a major issue or numerous minor issues that need corrected. Once corrective actions are completed, follow-up inspections are conducted to ensure issues were rectified. • MS4 Maintenance The Town is responsible for maintaining the MS4 within Town street rights-of- way and Town owned properties. MS4 maintenance includes street sweeping on all curb and gutter streets, parking lot sweeping on town-owned property, maintaining and removing debris from catch basins within town streets, and maintaining ditches/swales along town-maintained streets. Maintenance not only ensures proper drainage, it also helps keep pollutants out of the MS4. Additionally, during the fall/winter months the Town removes leaves from streets, including those collected by citizens. This helps reduce excess nutrients—one of the Town’s target pollutants—reaching the MS4 and local waterways. Town of Hillsborough Stormwater Management Program NPDES Phase II Annual Report Fiscal Year 2020 17 • Employee Training An important aspect of the Town’s Pollution Prevention/Good Housekeeping program is to provide training that teaches town employees best practices in reducing stormwater runoff pollution. As noted in Section 7.3, stormwater program training materials were updated by staff in FY2020. The Town’s stormwater training now has three modules, one of which focuses on stormwater pollution prevention and god housekeeping for town owned facilities. • Public Awareness This aspect of the Pollution Prevention/Good Housekeeping program is handled through the Public Education and Outreach program described in Section 7.1. 7.6.1 Pollution Prevention Inspection Results Stormwater staff conduct the highest priority pollution prevention inspections at the beginning of the fiscal year. These include the Wastewater Treatment Plant (WWTP), Water Treatment Plant (WTP), the Utility Collections and Distributions yard, the Public Works yard, and the Fleet Maintenance facility. The remaining inspections are conducted in May and June of each year. This timeframe allows a better assessment of the vegetative components of town-owned SCMs, lawn and other landscape or open space areas associated with town properties. However, due to restrictions resulting from the COVID-19 pandemic, staff did not have adequate time to inspect all town-owned properties as scheduled in May and June. In fact, stormwater staff received an unusual number of time-sensitive customer requests in May and June, including citizen concerns, site visit requests from new development projects, and assisting the Town’s Utility Department in permitting riparian buffer and stream impacts for emergency repair of an exposed sewer main. As a result, eleven town-owned facilities were inspected in FY2020. Of those, five were compliant and 6 were compliant with conditions. For the facilities that were compliant with conditions, corrective actions were either completed or are in progress. Follow up inspections of the compliant with conditions facilities will be conducted during the next fiscal year. Likewise, pollution prevention inspections of the facilities not inspected in FY2020 will be conducted in following fiscal year. In preparing this year’s annual report, staff realized that the Town’s Good Housekeeping/Pollution Prevention Plan needs to be reviewed and updated to prioritize properties based on stormwater pollution potential and exposure risk. This will help improve efficiency, especially when faced with constraints as noted in FY2020. Staff plans to review and update the plan in FY2021. Town of Hillsborough Stormwater Management Program NPDES Phase II Annual Report Fiscal Year 2020 18 Good Housekeeping Inspections – FY2020 Facility Status 1. Cemetery Compliant w/conditions 2. Cates Creek Park Compliant 3. Fairview Community Policing Center not inspected in FY2020 4. Fleet Maintenance Compliant 5. Gold Park Compliant w/conditions 6. Kings Highway Park not inspected in FY2020 7. Murry Street Park not inspected in FY2020 8. Museum not inspected in FY2020 9. Old Landfill Compliant 10. Police Department not inspected in FY2020 11. Public Parking not inspected in FY2020 12. Public Works Compliant 13. Riverwalk Compliant w/conditions 14. Town Hall not inspected in FY2020 15. Town Hall Annex not inspected in FY2020 16. Turnip Patch Park not inspected in FY2020 17. Wastewater Treatment Plant Compliant w/conditions 18. Water Distribution Compliant w/conditions 19. Water Tower (UNC Hospital) Compliant 20. Water Treatment Plant Compliant w/conditions 7.6.2 MS4 Maintenance Statistics MS4 Maintenance/Cleaning – FY2020 Number of Regular Roads/Parking Lot Cleanings 16 Percentage of Storm Drains/Catch Basins Cleaned14 38% Amount of Trash/Debris/Sediment Removed 2,500 lbs. Linear Feet of Ditches/Swales Maintained15 2,123 feet Amount of Leaves Collected/Mulched 660 tons 14 This represents cleaning of loose debris and not accumulated sediment. Note that d ue to staff resource constraints, repairs on ditches and swales were prioritized over storm drain and catch basin cleaning. 15 This may include removal of debris, removal of accumulated sediment, reshaping, revegetating, etc. Town of Hillsborough Stormwater Management Program NPDES Phase II Annual Report Fiscal Year 2020 19 7.6.3 Employee Training Statistics FY2020 employee training statistics are provided in Section 7.3.3. A total of 27 town employees were trained in stormwater pollution prevention. Additionally, Stormwater and Environmental Services staff attended one stormwater SCM training event in FY2020.