HomeMy WebLinkAboutWQ0041789_Pump and Haul Report_20201009September 25, 2020 Water Quality Regional Operations Supervisor 450 West Hanes Mill Road Suite 300 Winston Salem, NC 27105 Envilonnementa l 4uallt Received Y OCT 05 2020 Winston-Salem Regional Office Subject: Permit No. WQ0041789 Wastewater Pump & Haul Permit Application Pilgrim's Staley Feed Mill and Hatchery Randolph County Wastewater was removed from the facility by Total Enviro Septic and Waste LLC on the following dates • June 12th-12,000 gallons to City of Asheboro Wastewater Treatment Facility and 8,000 gallons to Sanford Wastewater Treatment Facility; 7pm to 12am • June 13th — 9,000 gallons to City of Asheboro Wastewater Treatment Facility and 12,000 gallons to Sanford Wastewater Treatment Facility; 24 hours pumped • June 14th— 30,000 gallons to City of Asheboro Wastewater Treatment Facility and 25,000 gallons to Sanford Wastewater Treatment Facility; 24 hours pumped • June 15th—18,000 gallons to City of Asheboro Wastewater Treatment Facility and 16,000 gallons to Sanford Wastewater Treatment Facility; 24 hours pumped • June 161h— 32,000 gallons to City of Asheboro Wastewater Treatment Facility; 24 hours pumped • August 3rd—16,000 gallons to City of Asheboro Wastewater Treatment Facility; gam to 5pm • August 4th—16,000 gallons to City of Asheboro Wastewater Treatment Facility; 9am to 5pm Inspections, observations, and actions • June 12" 9am power was found to be out, system was turned back on, system looked good but pond was found to be under one foot of freeboard 0.8; noted that pond level did not match with free board; contacted state and began emergency pump and haul • June 131h 2pm foot valve was cleaned and we began spraying, pond levels had begun to drop and was at 0.9 • June 141h 11am drain cover was installed at old wash bay to eliminate stormwater getting into the system; irrigation occurred; pond level was 1.4 • June 15th 7am irrigation occurred; pond level was 1.8, foot valve was cleaned; secondary containment at feed mill was piped so that stormwater could go to wastewater or be discharged as stormwater • June 161h 7am irrigation occurred; pond level was 1.8; • June 22n1 10:00am contractor in to check pump, it was repaired and pressure improved; irrigation occurred; Total cleaned foot valve lift station —to be done monthly going forward • July 11t 11:30am Sanford Turf and Irrigation onsite to check rain bird; found to be in need of replacement; irrigation occurred • July 7th 11:30am Sanford Turf and Irrigation onsite to change controller; irrigation occurred • July 9th 8:00am Total Enviro Septic and Waste LLC jetted pipe between ponds • July 16th 9:00am surveying done on both lagoons to check freeboard markings • August 3td 11:30am no irrigation but everything looked good, begun pumping to prepare for large rainfall expected • August 4th 1:45pm lots of rain, influent 22,121 gallons, no irrigation • August 6th 5:00am bigger drain cover was installed at old wash bay; irrigation occurred • September 23rd 1pm irrigation occurred; found 3 locations at the hatchery to eliminate clean stormwater from getting into the system; parts are being ordered to make these changes If you have any questions or need any additional information please contact me at 919-895-3457 or at Tina. Ped levP Pi lri ms.com. Thank you Tina Pedley 484 Zimmerman Road • Sanford, NC • 27330 Telephone: (919) 774-7333 • Fax: (919) 718-0356