Loading...
HomeMy WebLinkAbout20140090 Ver 7_Site 3 bypass restoration inspection_20201009 Wetland Inspection Report Project Num: 20140090 Version: 7 Status: Issued Project Name: NCDOT-US 158 (U-2579B) Project Type: Road County• Forsyth intena c /repair/improveme Region: nston- ayem Location: NCDOT-US 158 (U-2579B) Latitude: +360 07' Longitude: -80' 07' 55" SW Plan Location: Site Owner Name: NC DOT PDEA Inspection Date: 10/1/2020 Reason for Inspection: Routine Inspection Type: Site Inspection(DOT) Inspection Contact Person: Title: Phone: On-Site Representative(s): Primary Inspector: Dave Wanucha Phone: 336-776-9703 Secondary Inspector(s): Facility Compliance Status: 0 Compliant ❑ Not Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: Permit(401 WQC) Inspection Summary: page 1 Site Number: 20140090 Owner: Thorpe,Greizory Inspection Date: 10/1/2020 Inspection Type: Site Inspection(DOT) Reason for Visit: Routine Permit(401 WOO Yes No NA NE Does the impact(s)match what was approved in the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Are the culverts and/or filled areas installed properly? 0 ❑ ❑ ❑ Is the site compliant with additional conditions of the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Comment: This was a follow-up inspection at Site 3 for the restoration of a stream segment related to a temporary bypass. DOT and the Corps were present to review its condition. The channel looked good and much improved from original condition prior to installation of bypass. This is not for mitigation credit but is inspected and monitored. page 2