HomeMy WebLinkAboutNCS000010_Final Permit Cover Letter_20201009ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Acting Director
Mr. Brian Carruthers
Evonik Corp
2401 Doyle Street
Greensboro, NC 27406
Dear Mr. Carruthers:
NORTH CAROLINA
Environmental Quality
October 9, 2020
Subject: NPDES Stormwater Permit
Permit No. NCS000010
Evonik Corp
Guilford County
The Division of Energy, Mineral, and Land Resources' Stormwater Permitting Program
acknowledges receipt of your renewal application for coverage under NPDES Permit
No. NCS00010 on September 24, 2014. In response to your renewal application for
continued coverage under NPDES Permit No. NCS000010, the Division of Energy,
Mineral and Land Resources is forwarding herewith the subject state - NPDES permit.
This permit is issued pursuant to the requirements of North Carolina General Statute
143-215.1 and the Memorandum of Agreement between North Carolina and the U.S.
Environmental Protection Agency dated October 15, 2007 (or as subsequently
amended).
This final permit includes no other major changes from the draft permit sent to
you on September 9, 2019 other than Reporting Requirements.
Reporting Requirements have changed; signed and scanned Discharge
Monitoring Report (DMR) forms will now be submitted using the Digital
Submittal Form located at de4.nc.gov/SW-industrial. Then, original, signed DMRs
will be mailed to the applicable DEMLR Regional Office.
In addition, you will begin receiving notifications about the commencement of the
electronic DMR (eDMR) process. The Stormwater Program is planning for NPDES
Industrial Individual permits to begin electronic reporting on January 1, 2021.
E
Q7>
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
512 North Salisbury Street 1 1612 Mail Service Center I Raleigh. North Carolina 27699-1612
o:► r .r a �^w"N\ /` 919.707.9200
Mr. Brian Carruthers
October 9, 2020
Page 2 of 2
Subject: Final NPDES Stormwater Permit No. NCS000010
Please note that analytical and qualitative monitoring is required in this permit. Failure
to complete the monitoring as required is a violation of the permit and any permit
noncompliance constitutes a violation of the Clean Water Act. Reference Part III,
Section A, Item 2 "Duty to Comply", Item 9 "Penalties for Tampering" and Item 10
"Penalties for Falsification of Reports" of your permit for further information.
If any parts, measurement frequencies or sampling requirements contained in this
permit are unacceptable to you, you have the right to an adjudicatory hearing upon
written request within thirty (30) days following receipt of this letter. This request
must be in the form of a written petition, conforming to Chapter 150B of the North
Carolina General Statutes, and filed with the Office of Administrative Hearings, Post
Office Drawer 27447, Raleigh, North Carolina 27611-7447. Unless such demand is
made, this decision shall be final and binding.
Please take notice this permit is not transferable. Part III, B.2. addresses the
requirements to be followed in case of change in ownership or control of this discharge.
This permit does not affect the legal requirements to obtain other permits which may
be required by the Division of Energy, Mineral, and Land Resources, or permits
required by the Division of Water Resources, Coastal Area Management Act or any
other federal or local governmental permit that may be required.
If you have any questions or comments concerning this permit, please contact Aana
Gamble at (919) 707-3648, or via email at aana.gamble@ncdenr.gov.
Sincerely,
for Brian Wrenn, Acting Director
Division of Energy, Mineral and Land Resources
cc: Brian Carruthers, Evonik Corp
Tamera Eplin, Winston-Salem Regional Office, DEMLR Land Quality Section
Attachments:
NPDES Stormwater Permit No. NCS000010