HomeMy WebLinkAbout510035_Compliance Evaluation Inspection_20201005A I l",
Facility Number - O DIvision of Soil and Water Conservation
O Other Agency
of Visit: Compl' a Inspection Operation Review O Structure Evaluation O Technical Assistance
m for Visit: outine O Complaint 0 Follow-up O Referral O Emergency O Other O Denied Access
Date of Visit: 0 -S- Arrival Time: 0 j I Departure Time: County: Region:
Farm Name _ ' -)-,I G , 5 Owner Email:
Owner Name:
Mailing Address:
Physical Address:
Facility Contact:
Title:
Phone:
Onsite Representative: J G Z'!54 U Integrator:
Certified Operator:
Back-up Operator:
Location of Farm:
Swine
Wean to Finish
W n"to Feeder
'Feeder to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
Other
Latitude:
Phone:
Certification Number:
Certification Number:
Design Current Design Current
Capacity Pop. Wet Poultry Capacity Pop.
Layer I I E]
Non -La er
Poults
Design Current
Longitude:
Design Current
Cattle Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
Discharees and Stream Impacts
1. Is any discharge observed from any part of the operation? ❑ Yes ONo ❑ NA ❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made? ❑ YesVN
❑ NA ❑ NE
b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes❑ NA ❑ NE
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes NA ❑ NE
2. Is there evidence of a past discharge from any part of the operation? ❑ Na Yes ❑ NA ❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ❑ No ❑ NA ❑ NE
of the State other than from a discharge?
Page I of 3 5/I212020 Continued
Facili Number: - _> Date of Inspection: /C -
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes
a. If yes, is waste level into the structural freeboard?
Structure I Structure 2 Structure 3 Structure 4
Identifier:
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in):
5. Are there any immediate threats to the integrity of any of the structures observed?
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
waste management or closure plan?
❑ Yes
Structure 5
No NA ❑ NE
_ o ❑ NA ❑ NE
Structure 6
❑ Yes `o ❑ NA ❑ NE
❑ Yes No ❑ NA ❑ NE
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental r "t, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ YesVNo
NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes N ❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure?Sludge into Bare Soil
❑ Outside of Acceptable Crop Window 0 Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes
N [3 NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
❑ Yes
❑ NA
❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
[:]Yes
No _NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes
❑ NA
gNo
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes
❑ NA
❑ NE
Re uired Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes
o ❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ YesjNo
❑ NA
❑ NE
the appropriate box.
❑ WUP ❑Checklists ❑ Design [:]Maps [:]Lease Agreements ❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes eNo ❑ NA ❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers Weather Code
❑ Rainfall ❑Stocking ❑ Crop Yield ❑ 120 Minute Inspections []Monthly and V Rainfall Inspectiowo"L
Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? [:]Yes ❑ NA ❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes []No ❑ NA ❑ NE
Page 2 of 3 511217020 Contirined
Facilit Number: - - Date of Inspection: O - S- )
14. Did the facility fail to calibrate waste application equipment as required by the permit? ]Yes No .❑ NA ❑ NE
M Is the facility out of compliance with permit conditions related to sludge? If yes, check [] Yes � ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes No NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
❑ Yes
❑ No
❑ NA
[] NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
❑ Yes
❑ No
❑ NA
❑ NE
permit? (i.e., discharge, freeboard problems, aver -application)
3 I. Do subsurface the drains exist at the facility? If yes, check the appropriate box below.
❑ Yes
❑ No
❑ NA
❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
❑ Yes
❑ No
❑ NA
❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
❑ Yes
❑ No
❑ NA
❑ NE
34. Does the facility require a follow-up visit by the same agency?
❑ Yes
❑ No
❑ NA
[] NE
Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations (use additional pates as necessary).
5 11 di e Sty- YVa (I K9
Reviewerlinspector Name:
9 r- q - 7-0
0 - 3.1
P- Z�-2- - 3q°�&
Phone: q 19 7q r 'lz00
Reviewer. -'Inspector Signature: I
Page 3 of 3
M.
Date:
511212020