Loading...
HomeMy WebLinkAboutNCS000515_Post Construction After Storm Inspections_20201008China Grove Inspection Report Facility Name: Bojangles' Facility Address: 725 N. US 29 HWY Facility Description: Restaurant Site Contact: Stephen Parker Phone/Email: 704-940-8756 sparker2@bojangles.com Inspected Date: 03125/2020 Inspected Type: After -Storm Event Inspector Name: Overall Status: 3. Failed Permit Number: 6 Permit Date: 03/25/2020 Permit Type: NPDES SCM Type: Sand Filter Weather: Cloudy Last Rain: 04/13/2020 Water Received: 1 inch SWPPP, EROSION, SEDIMENT AND HOUSEKEEPING BMP's INFORMATION Pass/Fall 01. Is the SWPPP on site and accessible, or is the SWPPP location posted in an obvious place and reasonably accessible (in a Pass short time)? 02. Are erosion control, sediment control, buffer controls and good housekeeping BMP's installed on the site as shown in the Pass SWPPP? 03. Has the SWPPP been updated to reflect the current site conditions (modifications dated & initialed on site map, new BMPs on site map, discontinued BMPs crossed off site map, new BMP details &sec's in SWPPP, SWPPP amendment Log, etc.)? 04. Are on -site inspections being performed and recorded by a qualified person on a weekly or biweekly basis, reporting items required by permit? (Inspector name, qualifications and signature, weather, problems/repairs, corrective action, new BMPs, removed BMPs, discharges, etc. 05. Have all corrective action items from previous inspections been logged, addressed and documented within the time frame allotted? 06. Are SW flows entering and leaving the construction site controlled, managed, or diverted around the site? (e.g. buffer zones Pass perimeter controls, berms, silt fence, up gradient boundary diversion, down gradient boundary sediment control, etc. 07. Is there evidence of sediment discharge such as mud flows or soil deposits from the construction site in downstream locations? 08. Is there evidence of vehicles tracking soil off the construction site? 09. Is there soil, construction material, landscaping items, or other debris piled on impervious surfaces (roads, drives) that could be washed with SW to a storm drain or water body? 10. Is there a need to repair, maintain, or improve erosion control BMPs (temporary stabilization, erosion blankets, mulch, vegetated strips, rira , surface roughening, pipe slope drain, dust control, etc)? 11. Is there a need to repair, maintain, or improve sediment control BMPs (silt fence, check dams, fiber rolls, sediment traplbasin, inlet protection, waddles, strew bails, curb cut -back, etc? 12. Is there a need to repair, maintain, or improve good housekeeping controls (clean track out pad, sweeping, construction materials management, litter/trash control, portable toilet, staked down, fueling areas, concrete wash out area, proper curb ramps, spill prevention, etc)? 13. Are there disturbed areas that have not had construction activities for 14 to 21 days without stabilization? (except snow or frozen round)? 14. Are there places where BMPs are needed and should be Installed or not needed and should be removed? COMMENT'S AND CORRECTIVE ACTIONS FOR SWPPP COMPLIANCE Interior grass is mud. Water sitting to long around inlet. Fence failing. Erosion present on north side. Old silt fence present. Abundant weed growth. Inspector: Operator: Date 04/14/2020 Date Inspection Report Facility Name: Food Lion Permit Number: 4 Facility Address: 1408 N. Main Street Permit Date: 03/25/2020 Facility Description: Grocery Store Permit Type: NPDES Site Contact: Matt Yates SCM Type: Bio-retention Phone/Email: 704-310-4414 Inspected Date: 03/25/2020 Weather: Cloudy Inspection Type: After -Storm Event Last Rain: 03/24/2020 Inspected By: Franklin Gover Water Received: Inspection Status: 3. Failed SWPPP, EROSION, SEDIMENT AND HOUSEKEEPING BMP's INFORMATION Pass/Fall 01. Is the SWPPP on site and accessible, or is the SWPPP location posted in an obvious place and reasonably accessible (in a short time)? 02. Are erosion control, sediment control, buffer controls and good housekeeping BMP's installed on the site as shown in the SWPPP? 03. Has the SWPPP been updated to reflect the current site conditions (modifications dated & initialed on site map, new BMPs on site map, discontinued BMPs crossed off site map, new BMP details & s ec's in SWPPP, SWPPP amendment Log, etc.)? 04. Are on -site inspections being performed and recorded by a qualified person on a weekly or biweekly basis, reporting items required by permit? (Inspector name, qualifications and signature, weather, problems/repairs, corrective action, new BMPs, removed BMPs, discharges, etc. 05. Have all corrective action items from previous inspections been logged, addressed and documented within the time frame allotted? 05. Are SW flows entering and leaving the construction site controlled, managed, or diverted around the site? (e.g. buffer zones perimeter controls, berms, silt fence, up gradient boundary diversion, down gradient boundary sediment control, etc. 07. Is there evidence of sediment discharge such as mud flows or soil deposits from the construction site in downstream locations? 08. Is there evidence of vehicles tracking soil off the construction site? 09. Is there soil, construction material, landscaping items, or other debris piled on impervious surfaces (roads, drives) that could be washed with SW to a storm drain or water body? 10. Is there a need to repair, maintain, or improve erosion control BMPs (temporary stabilization, erosion blankets, mulch, vegetated strips, ri re , surface roughening, i e slope drain, dust control, etc)? 11. Is there a need to repair, maintain, or improve sediment control BMPs (silt fence, check dams, fiber rolls, sediment trap/basin, inlet protection, waddles, straw bails, curb cut -back, etc? 12. Is there a need to repair, maintain, or improve good housekeeping controls (clean track out pad, sweeping, construction materials management, litter/trash control, portable toilet, staked down, fueling areas, concrete wash out area, proper curb ramps, s ill prevention, etc)? 13. Are there disturbed areas that have not had construction activities for 14 to 21 days without stabilization? (except snow or frozen ground)? 14. Are there places where BMPs are needed and should be installed or not needed and should be removed? COMMENT'S AND CORRECTIVE ACTIONS FOR SWPPP COMPLIANCE Litter present. Standing water present. Gutters and catch basins dirty. Sediment present in inlet. Missing caps. Grass is missing on south slope allowing erosion. Grass on slope needs to be maintained. Erosion on northern slope. Inspector: [signature 11 Date Franklin Gover Operator: [signature 21 Date [Operator Name] 03/25/2020