HomeMy WebLinkAbout20041903 Ver 1_Complete File_20041129Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
Division of Water Quality
December 7, 2004
Wilkes County
DWQ Project No. 04-1903
SR 1935 (King Billings Rd)
APPROVAL of 401 Water Quality Certification
Mr. Mike Pettyjohn, P.E.
Division Engineer, Division 11
N C Department of Transportation
Post Office Box 250
North Wilkesboro, North Carolina 28659
?
DEC 2 0 D
2VoQ4
Dear Mr. Pettyj ohn: ?R - WAZER
ANDsT, AL/Ty
You have our approval, in accordance with the attached conditions and those listed. el cur the following impacts
in order to pave, increase lane width and improve traffic safety on SR 1935 (King Billings Rd) in Wilkes County.
• 111 linear feet of new piping impacts to two unnamed tributaries to Big Bugaboo Creek (81 feet of new pipe and 30
feet of rip-rap);
• Temporary dewatering impacts of approximately 0.006 acres at station 68+80.
The project shall be constructed in accordance with your application dated November 19, 2004 (received November 29,
2004). After reviewing your application, we have decided that this fill is covered by General Water Quality Certification
Nos. 3404 and 3366, corresponding to the U.S. Army Corps of Engineers Nationwide Permit Numbers 14 and 33. In
addition, you should acquire any other federal, state or local permits before you proceed with your project including (but
not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval
will expire with the accompanying 404 permit, unless otherwise specified in the Water Quality Certification.
This approval is valid solely for the purpose and design described in your application (unless modified below). Should
your project change, you must notify the Division of Water Quality (Division) and submit a new application. If the
property is sold, the new owner must be given a copy of this approval letter and certifications, and is thereby responsible
for complying with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or if
total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as
described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to remain valid, you must adhere to the conditions
listed in the attached certification and any additional conditions listed below.
1. All Best Management Practices for bridge removal shall be followed.
2. Erosion and sediment control practices must be in full compliance with all specifications governing the proper
design, installation and operation and maintenance of such Best Management Practices in order to protect surface
waters standards:
a. The erosion and sediment control measures for the project must be designed, installed, operated, and
maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control
Planning and Design Manual.
No One
hCarolina
!!t=lM1111lf
North Carolina Division of Water Quality 585 Waughtown Street Phone (336) 771-4600 Customer Service
Internet: h2o.enr.state.nc.us Winston-Salem, NC 27107 FAX (336) 771-4630 1-877-623-6748
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
Mr. Mike Pettyjohn, P.E.
December 7, 2004
DWQ# 04-1903
Page 2
b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be
such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina
Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow
sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the
project.
c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and
maintained in accordance with the most recent version of the North Carolina Surface Mining Manual.
d. The reclamation measures and implementation must comply with the reclamation in accordance with the
requirements of the Sedimentation Pollution Control Act.
3. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of
the impacts depicted in the Preconstruction Notice Application. All construction activities, including the design,
installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be
performed so that no violations of state water quality standards, statutes, or rules occur.
4. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent
practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they
shall be removed and the natural grade restored within six months of the completion of the project.
5. Riparian vegetation must be reestablished within the construction limits of the project by the end of the growing
season following completion of construction.
6. Stormwater should be directed to vegetated buffer areas, grass lined ditches or other means appropriate to the site
for the purpose of pre-treating stormwater runoff, and must not be routed directly into streams. Mowing of
existing vegetated buffers is strongly discouraged, so that they may be utilized for stormwater sheet flow.
7. Where practicable, culverts that are less than 48-inch in diameter should be buried to a depth equal to or greater
than 20% of their size to allow for aquatic life passage. Culverts that are 48-inch in diameter or larger should be
buried at least 12 inches below the stream bottom to allow natural stream bottom material to become established
in the culvert following installation and to provide aquatic life passage during periods of low flow. These
measurements must be based on natural thalweg depths. This may require increasing the size of the culvert to
meet flow conveyance requirements. If any of the existing. pipes are perched, they shall be removed and replaced,
and re-installed correctly, unless demonstrated that this is topographically unfeasible. All waters must flow
through without freefalling or damming on either end of the culverts during low flow conditions, to maintain
aquatic life and/or fish passage.
8. The double barrel culvert at station 68+80 should be installed so that one barrel is buried one foot into the
streambed and the second barrel is placed at the active floodplain bench elevation to receive stormwater flows.
The barrel receiving base flow should be located along the existing active stream alignment. Disturbed active
floodplain benches should be reconnected to the stormwater barrel.
9. The dimension, pattern and profile of the stream above and below the crossing should not be modified by
widening the stream channel or reducing the depth of the stream.
10. Disturbed floodplains and streams should be restored to natural geomorphic conditions.
11. Use of rip-rap for bank stabilization is to be minimized; rather, native vegetation is to be planted when practical.
If rip-rap is necessary, it must be limited to the stream bank below the high water mark, and vegetation must be
used for stabilization above high water. Any rip-rap used must not interfere with aquatic life passage during low
flow conditions.
12. If concrete is used, work must be accomplished so the wet concrete does not contact the stream water. This will
lessen the chance of altering the stream's water chemistry and causing a fish kill.
13. Heavy equipment must be operated from the banks rather than in the stream channel in order to minimize
sedimentation and reduce the likelihood of introducing other pollutants into the stream.
14. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent
contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials.
IT
Mr. Mike Pettyjohn, P.E.
December 7, 2004
DWQ# 04-1903
Page 3
15. The presence of equipment in the channels must be minimized. Under no circumstances must rock, sand or other
materials be dredged from the wetted stream channel under authorization of this permit, except in the immediate
vicinity of the culverts.
16. Temporary dewatering sites must be restored to preexisting conditions unless more natural geomorphic conditions
can be provided.
17. All work shall be performed during low flow conditions.
18. Upon completion of the project, the NCDOT shall complete and return the enclosed "Certification of Completion
Form" to notify DWQ when all work included in the 401 Certification has been completed. The responsible party
shall complete the attached form and return it to the 401/Wetlands Unit of the Division of Water Quality upon
completion of the project.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act
within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to
Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center,
Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have
any questions, please contact Sue Homewood at 336-771-4600 extension 287 or at Sue.Homewood@ncmail.net.
Sincerely,
Alan W. Klimek, P.E.
Attachment
cc: Wilmington District Corps of Engineers
John Thomas, USACE Raleigh Field Office
Heath Slaughter, Division 11, Division Environmental Officer
Winston Salem Regional Office
Central Files
r
Mr. Mike Pettyjohn, P.E.
December 7, 2004
DWQ# 04-1903
Page 4
DWQ Project No.: County:
Applicant:
Project Name:
Date of Issuance of 401 Water Quality Certification:
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any
subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina
Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621. This form may be returned to DWQ by
the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of
these.
Applicant's Certification
I, , hereby state that, to the best of my abilities, due care and diligence was
used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and
other supporting materials.
Signature:
Date:
Agent's Certification
I, , hereby state that, to the best of my abilities, due care and diligence was
used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and
other supporting materials.
Signature:
Date:
Engineer's Certification
Partial Final
I, , as a duly registered Professional Engineer in the State of North
Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the
Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the
construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water
Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature
Registration No.
Date
41
r
..swr.1\'N
STATE OF NORTH CAROLINA
91ftROMR0
NOV Z g 2004
wETwd s SAS QUALITY
WATER BRASH
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY P. O. Box 25201, Raleigh, NC 276 1 1-5202 LYNDO TIPPETT
GOVERNOR PHONE: 919-733-2520 SECRETARY
November 19, 2004
Mr. John Thomas
U. S. Army Corps of Engineers
Raleigh Regulatory Field Office
6508 Falls of Neuse Road, Suite 120
NC 27615 041903-
Raleigh, Subject: Nationwide Permit #14 & #33
SR 1935 (King Billings Road)
Wilkes County, North Carolina
Project Number: 11C.097081 (DWQ Permit Fee: $200)
Dear Mr. Thomas:
The NC Department of Transportation is scheduled to grade, drain, base and pave SR 1935, King
Billings Road in Wilkes County. Total project length is approximately 1.83 miles. The roadway
width will increase from 16' to 18' and be paved. Impervious surface area will increase by 0.44
acre. This project will require the replacement of one (1) wet pipe at station 32+89. Bridge
number 387, station 68+80, will also be replaced by two (2) pipes, one of which will be isolated
to carry stormwater only.
Station Number Existing Structure
Size Proposed Pipe
Size Riprap Impacts
feet Total Impacts at
this Station ft.
32+89 24'x36" 55'x36" 10 41
68+80* BRIDGE #387 50'x66"x51" (2) 20 70
Total Stream Impacts = 111 feet
* The wet pipes at station 68+80 will be skewed more than the drawing illustrates.
The installation of the wet pipes at station 68+80 will require temporary dewatering. An
impervious sandbag dike will be constructed approximately 20 feet upstream of the existing
structure to create a small pool. Clean water will temporarily be pumped around the construction
area and will be discharged into a buffer area downstream. Any dirty water located inside the
construction area will be pumped into a silt bag. The dewatered area at station 68+80 will total
P. O: Box 250, N. WILKESBORO, NC 28659
PHONE. (336) 667-9111 FAx (336) 6674549
y
Mr. John Thomas
SR 1935, King Billings Road, Wilkes
Page 2
November 19, 2004
approximately 0.006 acre. Once the new structure is in place, the impervious dikes will be
removed and preconstruction streambed elevations will be restored.
Construction of this project will require impacts to waters of the United States in the Yadkin
Basin. Wet pipes located at stations 32+89 and 68+80 carry different unnamed tributaries to Big
Bugaboo Creek (Class: C). This project was reviewed for the presence of threatened and
endangered species on November 19, 2004. This project will have no effect on any federally
listed endangered plant or animal species. Historic compliance work will be scheduled and
concurrence with the State Historic Preservation Office will be obtained if required.
The proposed project should not remove or degrade existing water quality uses. Pipe sizes used
will be the minimum necessary to create a safe roadway. By utilizing the erosion control measures
outlined in the attachments to this application, downstream water quality standards will be
protected. All appropriate BMPs will be used during construction.
Attached is a Preconstruction Notification Form, plan sheets with proposed erosion control
measures, a marked county map, a marked topography map and photographs.
By copy of this letter, it is requested that Mr. Ron Linville, Mountain Region Coordinator, with
the North Carolina Wildlife Resources Commission comment directly to you concerning the 404
Nationwide Permit application with a copy sent to me.
By copy of this letter, I am forwarding seven (7) copies of this application package to John
Hennessy, NCDENR, Division of Water Quality, 401/Wetlands Unit, for his review. It is
requested that any comments related to the 401 certification be forwarded directly to me with a
copy sent to the US Army Corps of Engineers.
We would like to begin construction as soon as possible. If further information is required, please
let me know. Your early review and consideration will be appreciated.
Sincerely,
Staci Hining
Division Environmental Specialist
Enclosures
cc: John Thomas, US Army Corps of Engineers (1 additional copy)
Ron Linville, Western Piedmont Region Coordinator, NCWRC
John Hennessy, Division of Water Quality (7 copies)
Sue Homewood, Division of Water Quality
t
Mr. John Thomas
SR 1935, King Billings Road, Wilkes
Page 3
November 19, 2004
Mike Pettyjohn, PE, Division Engineer
Doug Tetzlaff, District Engineer
Brian Hamby, County Maintenance Engineer
Heath Slaughter, Division Environmental Officer
Neil Trivette, Roadside Environmental Field Operations Engineer
Dennis Bennett, Bridge Maintenance Engineer
Office Use Only: Form Version April 2001
USACE Action ID No. DWQ 44-1903
If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than
leaving the space blank.
L Processing
1. Check all of the approval(s) requested for this project:
® Section 404 Permit
? Section 10 Permit
® 401 Water Quality Certification
? Riparian or Watershed Buffer Rules
2. Nationwide, Regional or General Permit Number(s) Requested: NW #14 & #33
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (see section VIII - Mitigation), check here: ?
II. Applicant Information
1. Owner/Applicant Information
Name: North Carolina Department of Transportation
Mailing Address: P. O. Box 250, North Wilkesboro NC 28659
Telephone Number: (336) 903-9203 Fax Number: (336) 667-4549
E-mail Address: sshininvadot state nc us
2. Agent Information (A signed and dated copy of the Agent Authorization letter must be
attached if the Agent has signatory authority for the owner/applicant.)
Name: Staci Hining Division Environmental Specialist
Company Affiliation: North Carolina Department of Transportation
Mailing Address: P O Box 250, North Wilkesboro. NC 28659
Telephone Number: (336) 903-9203 Fax Number: (336) 667-4549
E-mail Address: sshininvadot state ne us
Page 3 of 12
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: SR 1935, King Billings Road
2. T.I.P. Project Number (NCDOT Only): 11C.097081
3. Property Identification Number (Tax PIN): N/A
4. Location
County: Wilkes Nearest Town: Lomax
Subdivision name (include phase/lot number): N/A
Directions to site (include road numbers, landmarks, etc.): See attached SR map.
5. Site coordinates, if available (UfM or Lat/Long): 68+80 DD: 36.3086°N. 80.9923° W
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Describe the existing land use or condition of the site at the time of this application:
Forest/Residential/Farm
7. Property size (acres): Approximately 11.09 acres.
Nearest body of water (stream/river/sound/ocean/lake): UT's to Big Bugaboo Creek
(Class: C)
9. River Basin: Yadkin
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.)
10. Describe the purpose of the proposed work: Grade drain base and pave SR 1935.
Page 4 of 12
11. List the type of equipment to be used to construct the project: Trackhoe/backhoe, motor
grader and dump trucks.
12. Describe the land use in the vicinity of this project: Forest/Residential/Farm
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information- Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
V. Future Project Plans
Are any additional permit requests anticipated for this project in the future? If so, describe the
anticipated work, and provide justification for the exclusion of this work from the current
application: N/A
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
1. Wetland Impacts
Page 5 of 12
Wetland Impact
Site Number
indicate on ma
Type of Impact* Area of
Impact
acres Located within
100-year Floodplain**
es/no) Distance to
Nearest Stream
feet
Type of Wetland***
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at httD://wutiv.fema.gov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.)
List the total acreage (estimated) of existing wetlands on the property:
Total area of wetland impact proposed:
2. Stream Impacts, including all intermittent and perennial streams
Stream Impact Length of Average Perennial or
Site Number Type of Impact* _Impact Stream Name** Width of
Stream Before Intermittent?
(indicate on map) (linear feet) (please specify)
Impact
Station No. 32+89 Pipe replacement 31 feet UT #1 Big Bugaboo 2 feet Perennial
Creek
Station No. 68+80 Bridge to pipe 50 feet UT #2 to Big Bugaboo 3 feet Perennial
Creek
Miscellaneous
See attached rip-rap 30 feet UT's to Big Bugaboo 2-3 feet Perennial
cover letter placement for Creek .
stabilization
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
%vw.usgs.gov. Several Internet sites also allow direct download and printing of USGS maps (e.g., Nvwlv.topozone.conl,
wwAv.nun)lucst.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: 111 In. ft. of new permanent impacts.
3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any
other Water of the U.S.
Open Water Impact Area of Name of Waterbody Type of Waterbody
Site Number Type of Impact* Impact (if applicable) (lake, pond, estuary, sound,
indicate on ma acres bay, ocean, etc.
Page 6 of 12
* List each impact separately and identity temporary impacts. Impacts include, but are not limited to: till, excavation, dredging,
flooding. drainage, bulkheads, etc.
4. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.): N/A
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
By utilizing the erosion control measures as shown in the attached drawings, adverse impacts to
streams in the area will be minimized. Since this is an existing roadway, the stream impacts
cannot be avoided. However, the replacement pipe lengths will be the minimum needed to
satgl?, co.lstruct the paved roadway. puropriate BMPs will be used during, construction.
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC:
'F Wf4t?-r OnAlity !:fir r.r :ia •tc ;:a;:?l; i?: - :-re?tar til'':1 'ter ,oiiwl ? : ::+:.-t:
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
.
stream.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
tl-a I'?r?er'] 1`?::ictar :j:l A,?»i; i1 L>, :7:10!! Ill:ila';ttt;i: t:-ai be :'cC?tl::'ed when
... .., V• ..,.,.,....« ,.. b• ....
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
...... ? .,....... «..« tj?;G ,.. f,...:?::, .. Sr»... «..« .«..,....... «..« ..,.«..... .«.«.. .,. .I:.. .. Iii«....:«
aquatic resource will be considered in determining acceptability of appropriate and practicable
11-6ti.w4t: ':1 ::c_.a r?t•Hi::nlac :;t*:aaia•;tir'11 t1:.t :.Ysi: y.- ??n?:r::»rist:? (::::?) t?r.?;•ti.-.,:h1- ::::•];?.-i3
but are not limited to: reducing the size of the project; establishing and maintaining wetland
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o.enr.state.ne.us/ncwetlands/strmgide.htmi.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
N/A
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that
you would like to pay into the NCWRP. Please note that payment into the NCWRP must be
reviewed and approved before it can be used to satisfy mitigation requirements. Applicants
will be notified early in the review process by the 401 /Wetlands Unit if payment into the
NCWRP is available as an option. For additional information regarding the application
process for the NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/,.vrv/index.htm. If
use of the NCWRP is proposed, please check the appropriate box on page three and provide
the following information:
Amount of stream mitigation requested (linear feet): N/A
Amount of buffer mitigation requested (square feet): N/A
Amount of Riparian wetland mitigation requested (acres): N/A
Amount of Non-riparian wetland mitigation requested (acres): N/A
Amount of Coastal wetland mitigation requested (acres): N/A
IX. Environmental Documentation (DWQ Only)
Does the project involve an expenditure of public funds or the use of public (federal/state/local)
land?
Yes ® No ?
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Page 8 of 12
•
Yes ? No ?
X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 213 .0233
(Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other. (please identify )?
Yes ? No ® If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone* Impact
(square feet Multiplier Required
Mitigation
1 3
2 1.5
Total
T Lone t extends out su feet perpendicular from near bank of-channel: Zone 2 extends an
additional 20 feet liom the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or.0260.
XI. Stormwater (DWQ Only)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
Impervious surface area will increase by 0.44 acres All appropriate best management practices
l'or sediment and erosion control will be implemented during construction
Page 9 of 12
a
r
XII.
XIII. Violations (DWQ Only)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application?
Yes ? No
XIV. Other Circumstances (Optional):
Sewage Disposal (DWQ Only)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control):
Applicant/Agent's Signature Date
(Agent's signature is valid only if an autho u tion letter from the applicant is provided.)
US Army Corps Of Engineers Field Offices and Count y Coverage
Asheville Regulatory Field Office Alexander Cherokee Iredell Mitchell Union
US Army Corps of Engineers Wilkes Clay Jackson Polk Watauga
151 Patton Avenue Buncombe Cleveland Lincoln Rowan Yancey
Room 208 Burke Gaston Macon Rutherford
Asheville, NC 28801-5006 Cabarrus Graham Madison Stanley
Telephone: (828) 271-4854 Caldwell Haywood McDowell Swain
Fax: (828) 271-4858 Catawba Henderson Mecklenburg Transylvania
Raleigh Regulatory Field Office Alamance Durham Johnston Rockingham Wilson
US Army Corps Of Engineers Alleghany Edgecombe Lee Stokes Yadkin
Page 10 of 12
A L L EI H A N Y
ly C p
GAP ? '•e?i' ELEY 3500 A,
7,mvd DM w j Y -L- r ?s C orb ? I
BLUE
R:OG'c 1 j peRPSS - - -
AARKWWA`.' - , SZ 193S
:RFf.TONAI
AREA
' noun" I ?.' V
r I ?
c
PARK \ 'F \( STONE ^_1 '
,; 1\t •, ? MOUNTAIN ,
1730 TP,
c 1,-?'4 y. ?iCC _ 1737 '1Y ?' . ?I 1 X21 l 1733
e •? A61rrr a 1? I
1900
v l 1oRw / Mon
6 ! •7 ? ,1730
e
IL 17 '
._._ ] 11' 1784
1782 1752 J 21
1 I " r Thurmond
•735 • ? ? 1786 1 I 10
1
i? r '-? o PP! i
1_3C `.^ L \.1736' , Breacr 0\ :{. i75i ,1 1c1, ? \ Iu 1970_ `w.
173, ?• 1' rt 1749
1737 11749 1 ? `•. 2146 19M _ 17961-
?Cy
`!'• 4'" e ` ? ? ?•191e',r 1753 248`- 1910 \ 1
1 ?? ,r'• 1783 y 1752
,
'Y' r 7v ' 1 191 ?\ ?11 -
?<°,-"_? _ O,yl r36 imonill __ , It
"•731 Siy _ ,.?;' .'!- 1 ^N' ?\ V
•' 1? 1712 . ' 1x40 1,49 79 2 sr 917 gLW
.•1002 '!' 2119 u 1916 ~-:1 19121•
'1'C N'oovey 8 1941 ?' ~i9 v . 7 NE.LLS KNOB 1913?? ..
.. i / a '.{. 1976 '? 191] EL_ V. 1810
1938.%.
1746 1]08 ?197a Q1S3 j 2112 - 1917 1915 f A{_ 2037 \.
730 ! ?
1983 r
- 1002 ± '1947
1. j ti^ 1? 207b, /twin . ? 1914 2117' 2129-% .", i 1736 "?? ?- 1752 1925 , s 2034 ?'-> r
`1747 1 •. .g 1971 9 2032 .' 2036
_ 1806 1946 19 4• 1937 too ??? " X2026 _ ^ 2C
4 1762 y`?}1 r2 -'` ` 1917 ` :0: ?` _ (I» ] t. -
:.cnar 1745 f,' ;''j' ' , i. 1475 :- 1 \ .• 1977 ^ „ =:•t, ?• U203^ f
2065 '. to j
'788 " - a' 1939 1 934 ' 2037
1002 1946 2150 'a % ,U • o ?`-? {V _
17
41 1918 , •2009 n !' ,1926-^u 1752 ° 2032 : L
\?'?'??_ 201„ 1
15' 1745 ` y94a \ 1845 s09 ` 2149 !a 1427 t e 2076 t a 7031\ ?y
771 \?v RIVER -y i ??y 20017 X1926 s ?' y IT57 ?,??.
2171
'1 _ 1730 17u " 1950 1-1919 \ _-_r '' / 2030
^.7951 2007 % 1979 1926 ly \,
1802 ?_ s \ 1985 ?, . 1985,: 1934 t I fisnnBm ?C
ale ' X7029 201^,
\1002 ) \ t 1 / ? ?S^ ? ?•? I-Fl -- 2119 .y i• 1928 ? I53C V '? ? ° ? •??
1 ?• 10e$ ? ? 1899 Iy ^ ? .t• : "'7-26 202° a _? mP,? 1 / 2129 2006 .B I 21 ^ ` b 1,2164 $ 235 •~7931
,1. \ 2010 \1932- .` .)'.
999 Ia 1yI `;Ifj+ '.2092 `?? \ ?
2004 1999'
/ ?'? \ t \ _ . J\?\ "' 2007 1531 2028
a 931 2138 UUU
1933 Y. _ 2091327a//
J 1 1 1 _ '.° ` -??_2
1 /'. j .• pc 2005 2011 ^ 4 'I': 1974 a 2021 `11 0201
\\ / \ 1 L 1999 ' . .6
237E '
10 2025 242, )
2012
- 1 1990'.
1990 20]2 n 2023 ° I "I ^. 2013 I. ;f t 2020 '
?4? \ 2002 1931 .'1021 G. 2018
• 1999 ?•
N.uiae•ry ?_ '? Y II, r!? t t \ / 1991 / 199E 2141921 n ' 2018
,7163 2014 1
70191
?.r? \?• ! -- ?? /? l? 1MMc I:c. /?' "?^^"?` 20C2 2001 ;. 1974 2011
1992 990 Olt ,. _ 2302 ' 11 30b.
2364 2391
G I `? \ 1989 e_n'V r 2076 `l 201s 1 \RONDA 1 . 0351 INNS /''2.1?.
• 1 '? \ \/ _ ?? `_.. X11 \\ >' ? \ __ - - i I _ I ' -y czee. S .t 'MAY ? `? p '.!
--
~? ',/-_ 1 ?i I e .n Il ? eZve' p ?714a 2305 I `237
4 v .`.
2303 0 27U4
, - • _ _ '` _ _ -
i 1 ..r uMr??` ; (/ \ ^ ~ ¢ .330 r ]2 4 r -, 1 2 _ =lT ?jD.lo
73/ 61
23
2732 50 0'
2376 }2728- 2311 C?
`2371 ^r\/ ?'? "1 7 _ t'2 2318 ?l t! '-.23138t
" b' •.k..
23 I • _ -?
233 < y'C 2396
.b 2321 - W' - S '
V I• ?- 2318
,'• ``` . ??
_ 'S. 2326 2720 [•
2318 230-
1 2303
2325 _ F Ch,gmon -2312
.2388 \? 23/C. ?---"•,I
,3,,Tht \c •• ^R '?' _ s 2318 2312 _
_ 1„ I t 2366 230^
e` WILKESBJ _ 2341 - 2324 2718
- 32'
`.\ /• . \ t ( 1 - - C •-? 2391
27• 2383
?:: _4_ \ l?? ??\ ' I ?• .a e a 2319 2303
235• `? 23/31 .23IC : _ 'x321 - 23n1
°?.? Pi l { ?. ?,.?'? ./?? r-'?? _J \ c 4201 !T`
End SR 1935
®rr-.%
00
t 4
}} ? ? ?i -?,,??- - _} ? ? Station 68+80
Station 32+00, not f ,.
being replaced
!,.Stony ridge-
Ch
141
Start SR1935 4 R
14
3S
Name: THURMOND Location- 036.3054018° N 080.9944585° W
Date: 11119/2004 Caption: SR 1935,1Gng Billings Road
Scale: 1 inch equals 1333 feet Pipes at station 32+00 will remain
Copyright (C) 1998, Maptech, Inc.
Top: Upstream view @ station 32+89 on SR 1935, Wilkes.
Bottom: Downstream view from Bridge # 387.
EROSION CONTROL SCHEDULE
tem erosion control measures will be installed before
('O All adequate PorarY
clearing and grubbing operations begin-
temporary and permanent erosion control
ction progresses, r, according to any special permit
(2) As constru
devices shall be installed in a tirnelY matte
uirements and or requirements set out in G. S-113A-?' V[iY
re I _ -, ,,,= t ?L2RING ACTT
3 rovisions for a omplished ground wicover-
1b
stbe a?thin
Pucsuantto C.S-113ArZ7 ( p ?etion of
suffcientto restrain erasion mufollowing comp
working days-daysc?ajendar days ?chever period is shorter, except
construction or`d?elopment,
as provided in 15A NCAC 48 -0024 (e)-
NSTT11? WA-_RSH?PS
DF-SIGN STANDARDS IN S? .
vi -ons fora ground cover
113Prti7 :(3) Pro
rovidedfor.any portion?fa .
Pursuar?tto G- S- ion mustbe p.. clays or 30
sicierrtto ?n 2}1QW zone within 15 working
cthA
ietion of.construction or
%an&disti, mgt!
calendar days followiing -oomp
develop, er?t, vvhicineYerperiod is shorter: -
contro! devices shall be properly maintained until no
(3) A[1 siltation and erosion
:longer needed. r equ will promptiY
octs rformed by D.0-71- V-aintenance Forces, a and
Roadside Environmental l3nitfor stag
(4) On proj.. pe
madeto the Division
be
permanent seeding- blished
vat of siltation devices wilt
ground cover of that area be bae°n the condition of esta
(S) Any remo the device is serving-
CONSTRUCTIDN SEQUENCE FOR INSTALLING ROADWAY CULVERTS
1- Clear only enough area and install the downstream measures such as sift check dams,
sift screens, and basins as noted on plans.
2 - Excavate the Z base tail ditch-3 Excavate and install the roadway culvert
4 -.install sediment control measures at inlet as noted on plans.
S-'install additional pipe outletprotEction and iriiet protection as noted.
EROSION CONTROL DETAILS AND
SPECIFICATIONS
STANDARD DESCREMON SYMBOL
462.01.(Ser..Uon).....Rip Rap Fill Slope Protection ........................
876.04 ....................Rip Rap Lined Ditch ................................... 1060.08:(5ectiQn).,.Mattina For Erosion Control .......................... .s M?
1605.01 .................. Temporary Silt Fence .................................
-}}}-
1606.01 .................. Special Sediment Control fence...................... -
1622.01 ..................Temporary Slope Drain.......................... l
1630.02 ...................Silt Basin Type B......................................
1630.03 ................... Temporary Silt Ditch .................................. -T S D-
1630.04 .......... ......Stil1in.-I Basin...............................
1630.05 .................. Temporary Diversion...................... -TD--
1632.01 ...................Rack Inlet Sediment Trap Type-A.................: ?R 1 a
1632.02 ...................Rock Inlet Sediment Trap Type-B...................... ?; aR ';1 B
.. j
1632.03..• ................Rock Inlet Sediment Trap Type-,C ....•.....•....... icy: DAL C-
1633-01 ...................Temporary Rock Silt Check Tvpe _A......_..._.... EM J
1633.02 ...................Temporary Rock Silt Check Type-B........... ....
1634.01 ................... Temporary Rock Sediment Dam Type-A..........
1634.02 .................... Temporary Rock Sediment Dam Type-B....
.....
1635.01.................... Rock Pipe Inlet Sediment Trap Type-A ............ .=.:.; .
1635.02 .................... Rock- Pipe Inlet Sediment Trap Type-B............g
1636.01 ....................Rock Silt Screen....................................... rl
Small Stream or Branch ...........................................................•- ... - -- -?
as
Pipe Outlet Energy Dissipater..........................................................
000
ssEE
w
SECTION 1049,
RIP RAP A_ T A1'E_.InLS
10-i2-f PLAIN RIP RAP.
SLone -DI' I)lain r71) rI?ll sli lI consisiof Iield sion;, or vnl]e .,n quarry,
SjDI:e. T ie stone shall be sol?nd, iol-)g1r), dense, I'esi52ar1t'o Lle :iii i -
Dn of air
and grater, and suitable in all Hiller respecis or the unl-pose iniended.
Mere broken concrete from den)ollshed siructures or vavemeni is .avail
able, itnlay be used in place of sione provided lli t such use meets with the
aDDrDVal of the noineer.:I30_ wever, iffie use of broke
aI) concrete ivllich
contains reinforcing- sieel VIII net be 1)2I7JTn] ed_
TI)e stone or broken concrete s haII he -iIlu io M,==
e ffl11o-wincr
?.
iequirernents=
1. For-Class 3 Rip Rap- Stoineshall vary Zn-.,Tejgn i f rDm 5to 200 pounds:
_ L bast .30.. per,cD_ni.-of ihe_ iotal weight, af. ila- rip rap. Si, 11.1 be 1n
1nd1?TlClllL? vllces We
]g111I]g-t771I31IiI7llIn OI 60 Z?OUi)dS ?:lcll_ Not rI]Ur?
ih2II 1 U percent o the total ''eight of i l) rid rain ii-ay Mein individ>sal
pieces wej?nln - I ess illan 15 po inn ds e? ch_ --
.`? , C ;s ) Hid; Pa.-r Slone srlall v:?ry in rdel`_ 'ZO=- 25 to 95n
pound. -A-.least, OO percent of the Lo.al weight of- therm ra-D shall bn in
Individiial 1)Ieces ZvelghIIlg 'a minim u-m- of 100 pounQS e?ch_ Not-more
shall T)L)'CLI)t UI tl]E.' tUf 1I weJ= OI Mlle r li) I2iD IIlaY 1)e in lI1Ci1V1CiI1=?1
?I sees e2; (_-,111ng 1 ms=s than 50 wounds each-
• U?l
HIGH QL' ALITY WATERS
1. Uncovered areas are limited at any riven time to a maximum total area of
20 acres.
2. Erosion and sedimentation conn-ol measures shall be designed to provide
protection from the 25-year stoi-ra.
3. Large Typr-A basins shall be designed and constructed with a settling
efficiency of at least 70% for the 40 micron soil particle size transported
by runoff from the 2 -year storm.
4. Newly constructed channels shall be constructed with side slopes no
steeper than 2:1, unless slopes are to be stabilized by methods other than
vegetation
5. Aground cover sufficient to restrain erosion must be provided for any
disturbed area.
Z? R Oslo -V-
1?j35
D'S-1 RIC I Nvli??= :.
?4J
NOT=.
SHALL BE P-'-kCED- A7 LOW ?DIKTT S
r D%I sipi N VL-=1\ .+i ?;\
INS ; .•41 1 4 i ON !S BEING FIERFDRMED.
3AsINs Ar` NC - sHDwN DN
GRAD= CHANGES IN rRJAD-W.-.Y.
• ^DCK: C:=.F:s AND BASINS A T n-
--Cr.= ni=-FA7? Cr: ?DVINC
?_A--=IOEPt . BASIN: A CRDSS_IKES
.kLL V?= -P LACE.
71- IVO a i H.AN DN= VVD?K
-==AN Ire= :?tJ,L. i?1c.
i?U?ac? rJ I cr i t - 0135S
^rux3x t_ -I /O
® J L 5 `i-E-7S
? ?K3 XZ Iuk3z L ?p1?C ?-
I
i
® lo>-j1CZ ®(O XJ>CZ
lux3I Z ®? ° XSx Z
to x3r Z
alt t n C 3?l ,
y j?
101nY5. L
r
0 IJX3
y
b® In X-?,,
100 XL A
Mw,
A
Q to
r
ro x3K Z
Of I x3 ><Z
l o Y's"
I
I
I
i
t
0
e
m ioXSkZ
y
I ox3xz
t?x3xi
I U? B
A
c OSION CON T t?OL PLAN (3 (u ?3x z ??__ Z ?
OF:
SR Ig3S ?uxaxZ ZS'x !s" cie*
cool Y s _ P1az
LOCAL NAME I;
n
WOR ' ORDER NO.
I?x3xt
lox KZ
1
x z lox3 >t•Z
j ®\OX3XZ
y
• I?x 3xz
2
? tiO
X3x
- lax) Z
- lox XZ
?1 T Ft A=a) K LDlhr?DIh iJ
n_DN:; 's I: F a-JC? Ap ZI? ; = 0.C= / J X L -
IfLJ 1 A114, .?iDN IS =-It3G isD?.I??.._D.: .
r - -
-_- 3r,?tft5 ,4?r'ND, SHDINR DN . - , ; . -
• ?• 14-4-45
aT -?I==- -LD:, Ai I D??!{?'V,4?Y7s= '-D ?-
Gi?,ADE CHANGES IN' RDA DMPVA:Y? la>? L
C i r- T(/p g
R0 K C: }M AND B., 4S IhS AFa i D
REWjDbED, == v-,= i -PA 7- Z) R R M n N 3
=
jtt`S ? Cry::SJR? Kok` Z
TD FahI 4%-' . .
?i J x3 z L
: ,=D' 3i a WORa i -i4N DICE kkr--?K ' l ox3X Z C
DAY D INS l AL BL -1
C
??..-n_ ?J 1 1=1 =_ A
i
la-3
,Z ? tox3x2
sTa• ? 1+?? ?? l I+ ?d
ZS ??( 15'
-
1^X?x
L IUX;XL csp-/
Cs P- p .^
" ? CC
®lox3xz-
`-,CS;ON CONTROL FL4N
s? 1 q 35
COLINTY LJ; r ?xS
LOCAL NAME
'WORK ORDER NO. • os
• S
0 •?nt"
llv iox3
IoX3xZ
= f I S= 3 c= LO
1uxz
?o
vo k,3 x7-
I?X7kZ
?jR R (
?,-'p ;(F- e-wp S1opt
STA., 2 %A So -2cP r4 Cc
lox3xz :50lX 16" cie-Typc 3
t?.x3Kz
to X3 ),Z-
1717-Al
- -- •
.
?
- O • e
;
?
!
? ?1 T =rte. ?.J:l?l I:JI\ 1Yt7'?'1? Y.????? ? ! ? ', S ?
.
GF4.= HI=.N IN,?DTOIV Y. ®
to?c3?
6r, C)
iD :.??rIp,
- A WET
DR=. J`-.
lux3x"L
lux3xZ
?ox31<Z
lax3 x Z.
I?x3x`
Dli IoX?Y_Z
I oz3xz
? 5-Ta . Zd-r 3?- (Zc p \ a c c
?` x 1, c o-,yB
JA
• - Ivn .?x ?
EZOS ON CON i rcOL PL4,N
ildlo
1 x K
S-CA.., 39+3 0 r
L
SR q 3S RAP`
COUNT( S 3S'x ?„
LOCAL NAME I k >< Z
WORK ORDER NO.
-
ND1= _
DL ?=t 3A.:::,lKlSATi4 H ROOK C: ?F?
A
??
?
`Z`' .DNG 101- i JNr??l!•
-?? ?'1h.J N` 1V V 1 ..`j?V Y'\ .?I?l •- i... .- BIG X.3}
?t Ah J_ _
7N , RD-r- DMAY.
? lc:,x3x
• . ?DCK C::= F.? fi1V*• ?.:?Ira :? ` ,?S ? i'-f.?-?
33-?SO
D?vr=JR?
?LAS-EME 1: BASINS AT
130'h E5?`
?
Jufi4lpt :
toX3
c
AU W=-i
i HUT Fa:!L3 ,= ]VID=a DIL 1q--;Rfi
': - i., = I0, :
!_I ?
I L s-TA
Io?3xZ ?p-pla.'„
13 ><3 x L zsl Y. IS"
I
U
®laX3zL
.Joe 0
1 • STP? . 3.7+01 V - ?e P ?czc L
• 45'x Z4" . P
- Types s .
®j IOX3XZ
Iv- •
J?
STA . 3S-E?'t?- Qc$la?
4S' x18.: esP-T? F
-?-? STA. 3 Z4- 00
PEP DFr?ra:s E r-miL`7'r
® ox3xZ
J s P-_ 30?7?_1Lc1b
QII?IoX3xL
cCS10N CONi tiQL FL4N 10 1 o Y3x -` _
® I O XSc
SR 101 3s
COUNTY W,% - ®1oX3?Z
LOCAL NAME h'^ a 1 l;? r {?_ 48+l I ICV
WORK ORDER NO. Ic7VY !
IoKZ
X
C-5 Q
l?Q jn
101011X IDX,3Yt_
x n?Y
r .
STS. d '1-+S? add
J. L
1oX3x Io 3Ki 3?'x IS''.. csr - Pl?;?
lox r, z
- ? - - lox3x2.
s ??_ 4s :sue- Pdd
DM iE 3AS11?S1A :?RD :K 0:=fG
.?0
j-ia 1 t r ?t qr,? '. ?V1t?Dlh _ •
N??LT =i1 =_1: :?T!-=RtG= ??? STc., 444 4
lh:? i•f?i i L.i tDR IS?t?r:? :-?--:.??.I????.: - -- ? - -`e?. :. .. _ -Qe,9t0,cr
i---?^S1r AFEW5 SHOW, ON rax3,z `:J So' X- IB ?, . e1 P
.P da
3o iC tS
IN RDA DMALA^:Y?
I l ox3 x 7-
• BOOK ?:.=:.1? thT? S :SIhS :? ` t?s S= _ ?.
-7-=- 1ri-sly.
AL L VIE
- -cr?t - T t = lok3+cz
t -, `..:? .= IJ:r` r --i%;t4 0.? 1N?..? ®1 nix
Q?lox3x T
• ?loxjx ? ®t?xZ.
' X10`? °?I?z3tit
'Rzp ace-
CS/P ®1 M3,, Z.
loo,
EFROSiON CON i ROL FLAN Ion i
5TA? Q ???•r
Z$•><154 A
Sri I q 3.S csp
COUN Y ?k1;n tox3 z -
LOCAL NAME 11;x, tL-
'WORK ORDER NO.
'i?x3 Z
?10?.3x<
®E loo.L
o -
A O o.
'
k Za
:55
Q?lox3 - Iox3xZ 7yee -6
lox3,,. _
_. .;. ." . I u x3
-.. ?
?
"
^ Z
-
..
J
?IRJ?1{f11:?7??C?C. L?a
+
• I7J?=1 3-
l
-L?tV JI=1 a-4? at?:?T! : =Rtw ur,3xi
• Al' 1 ?r. EID- ak IDI IMAYV:Azl,YDL=? ; ... ..,X
-
ti 7, Fa -D 11 i =a 1, ri 3 =a il L t,.' at C- it v-
: R K
D?-',Y7 M A I i-wJ `ASS
?
O
J :
:=1t A DLY 1=1 Bt cl. &
a
??o STa. SZ+30 -QeP1='-cc.
• lax3 X
Z Coo`X" C3P
3
??
lur
xt.
• tYpcl?
lox3x 1192 lJ
Add A - Iox3xZ
ox3 Z
C5p- pI a:.
. I®
104, 7-
c__
-#ErRZOSION CON i ROL PLAN ® lox3x Z-
J,[ 4-SO
xZ 1 OX-3x 2 Zo'k !S" c-w- p n,'..
s?
COUNTY ACA
LOCAL NAME
{S__ LL ?.__ r^•(o?+ g,?8r:c3
A fi S X387
'WORK ORDER NO. To [?E t?EPcAcEA
} Z Lt Nc 5 o,c 6G '??CS/ ??X SO ? CSC
®I u 7C?X
HEAOWA<<
lox3 ? -
4s' x I $ ,.
lox,3x IOX3x2, L'S P-T
DLL= i? 34 -s It6-s yV, :i RD" K Cr? -r lG
?? t t ?nn?c Arm A i > DVir?Dlh?i ?w? -
w-as/IYJ JL? . i J?w-ir?'?? ?ti ?•Y?? -
Ih.? ?.Ai i c.i {DN I??t3? :•?-;.,?.t?E?_ - - - -?ox7? - _ - - -
s A-11 ?Dl•'-. , _= ur.=?. ?A= arc rZDil)t?1:? . ? _ -
:.=14x1
D?%YiDWS A ,.,i- J =mss' i 10x3xz
AT DL7jj7=-=KD--
. . 1-1. - i M4
(e2-}- I0x3xL
act
toad { ox3k Z ®? 8B _
35`x is',
C3P-PL2,,. ,s? ST" c?? -to-??? c?
'?` AA *? gam' X3caM CS P -TyC'c iS
- - lox3xz
(tax3?ct
lOx3k2 RS JE
D
EROSION CON i ROL FLAN S-- - _ G=_L
l?x3xZ
to >:Z
SR (01?? ® it, xsxt
COUNTY (A. I
LOCAL NAME ? l;? L I t oe® S- A. -7 94
WORK ORDER NO. ?O ? S O . ?e? 1ac?
F? j ?Twx?x2 so'k/a,, csP •
ee- -6
»x3XZ
1 ? x3 r;-t .
l 013 '
?ox3, -Z
r; Iok3xZ
ND
laxjv
tv
-147 +lv5 = t??
• A T ?2 ? :.etil lL7?MYV=L,Y?..? I D LY` `= +? YoSS: v{y ba a'•ol? cz'.:`:n? p•6'C?
.?._. _ _ neap hi: e'CJh: •[ l?c?.?
GRADE CHIANT:;;ES IN' R-D;DVVAY?
• RDCfi D: ?::i 7? . IFS Ar` !?i l o X:PK2
i D FEE [Ir±il?.
AL INFE ZR-"' IhE R'-A::SL?EK T j
A- D!,7l =ham. 1 o x3 X Z
I?x? r:Z
® "
- c!n IoX3x.Z
_ ® toX3k Z
?.
lox3xz
EROSION CON RROL PLAN 10%3x-z.
?-G-?Q
Sri lg3S
_ I ?k3xZ
couN T Y
I oX3 ?
LoCALNAAtIE k/-C%13 i
'WORK ORDER NO.
1 ilo.y.3)C'L
IoX3 Z -
?Jo)(3xz
v
??ux3%Z_
1?x3.xL
.. ? 10? L lor.3xz-.
.. + o:p P o..hlc?' .n -ti.c
MoX3j
?=tnr t = ?i Avg?1DVi?aDIfia _ 0 loX3xZ
1 ??_ >1fL? A> rND t ..BHDWI\ DN
PLANS- 10 )(3--'k L
A r`T ?s =_? 'Da, k-1 I-) LW VAY VARY 1D .
10&3 x Z-
r, :..??r:?41?r.. _ ? ? to ,<Z
ALL ,,r ®tn?k?XL
1R= rr L?^CBzL lla?? A=B%-a i 1 r
i -i.? ? `'?_3i .= I?t:? _` i %??1?1 DtL 1NC•?K ? i ? ! S-T? ,
Y? Ir.? ?r rJ `??f'_i •e? $ Z-4 tc,? - Qe-p`acc
!'M- =tom. e ?G IM 1ox3x-L 40,x Igo c5p
t ? fi3 xz _ j y e-
1o x3xZ
00
>< L
`=?-?D
=
gCefi?o - EoP
Zee
+ SOX 1$
++
- ---- _-ltox3X7- [? Kk r lox
?xy
.. - _ I ST_ GS?3?- l
X.3 x L.
IfL? (P1JA IS ?13? sir}?.i?E?. ' - A - ®F+?X3x 2
T-- 3„SIt AFS
N? $'J1Mt Dhl . f oK3
=-a,k--_ I ox 3 x Z ® ,? ?? vc
DLL _= v-.= rs? r''.?.= L?=c r'ZDJIW - -
?
?.
.: ?Itl 1 ?J 1 1?1 Eh .0.
i
I0X3K Z
z
T + 4? _ Qcp;ac`
?ox?xz .
A _ 4 o, x ? $? cse
?IoX3x2- "?y?? ?
Iak3xZ
70;j,
-??? - - - ®t d X3 x ?
E?OSION CON i ROL FLAN
Sri Ig3S
COUNT`(
LOCAL NAME
WORK ORDER NO.
DITCHLINER REQUIREMENTS
Wilkes County
SR 1935
STATION TO STATION
1+45 1+60
9+00 13+00
9+00 16+00
16+00 18+80
17+00 19+50
19+75 31+20
34+80 37+90
37+90 40+80
37+90 41+10
42+00 43+00
42+00 43+00
43+00 44+90
43+00 44+00
45+75 47+50
47+85 49+00
46+00 48+80
50+50 52+30
55+00 57+50
57+50 59+35
59+60 63+20
64+50 68+00
68+00 68+75
69+70 85+00
82+60 88+00
85+80 88+00
88+00 89+80
88+00 89+80
90+20 93+80
94+70 95+30
95+30 96+20
95+50 96+20
3/2/04
LT/RT TYPE
LT ROVING
RT RIP RAP
LT RIP RAP
LT ROVING
RT ROVING
RT RIP RAP
LT ROVING
LT RIP RAP
RT RIP RAP
LT ROVING
RT ROVING
LT RIP RAP
RT RIP RAP
RT RIP RAP
RT ROVING
LT RIP RAP
LT ROVING
LT RIP RAP
LT ROVING
LT RIP RAP
LT ROVING
LT RIP RAP
RT RIP RAP
LT RIP RAP
RT RIP RAP
RT ROVING
LT ROVING
LT ROVING
LT ROVING
LT RIP RAP
RT RIP RAP
s fL t q 3 s - (A-)! { kes C'r, „.4 - 3 - z-Zoe
0 pipF- I STATION SIT CLASS REMARKS
o o+?s I - CsP
o q+? 1 5' x" n- P 1 - P
o C I ' x Is" l
o I +-7 I z s, is-' I t,. - C-sp
0 E i 14-44S o' Z4 " - C.SP
0 F Iq-?so fx -.r I ??? ?I- c5
0 o ( u 1
0 Z 1 04-7 0' x is"
?? ?; n
- CS P
0 Z-1- o
DtNNIS pip
0 I +o°i 55'x 36 '' Rap) acc - (?5,0
0 L I -3 D'Y- I51' I Q
0 A +SO -s' x
4 I '' -
0 l?!• I ' X "
74 C-5
I
o q 3v s' x isI Ia;? kr-D I _ c's
o p I 9 eS' 15'' 4-c5p
0 I D o O'XI I IQln P ne-CSP
0 2 44 3 15" old - cs
0 S 44 -?-q o ? 8'' I cc - s P
o -r- I d s` k l I a - cSP
F0 4-7450 s' X 15 AA _ C-sto
0 1 Q + zo ' ! " 1 PI ox I A - c3
0 \Aj 1 Zo s' x IS" II - sP
0 3' I 600'Y
4-01
0 9 + 1 5' 15" 0. 1? -
o A I 14- 70 I ' Y I1 13 p
0 I Z+00 1 35 Is A - C5,10
o c I qq i qs' P tior - cs to
o I q I o'x -,' i ;,. A-CSP
0 E - I 4 '? I I d- csP
0- F I 8o IO' k l ?? 1 _ P
0 --woo I 40'x 1211
0 I °I 1-?-4? 1 4 0 k 1 ?' I I k e I"- c
0 20, I ?? IQ.,, as - ?s
0 K ( °i =r ,v I i I 1 ?, - P
0 L L 69+80 I z so ' x 6 "acs,., I w/ NEA w?? (Rpi6&e Pipe)
0
0
0 1 i
0
s
Datt
Existing Road
New Road
I
Proposed RAY - - - I - - -
' I &, tz
Existing Pipe ?- - - - I - - -
'yew PiDe
Center Line
h1D N m = :Tk . Cie. Cc ss _ _: :
I I l i t l l I I I-I I'i-t 1 1 1 1 1 1 1 I i I I I 1 I 1 1 1 I I I 1 1 1! i I 1 ! 1 1 1 1 1 1 1 1 1 1 1 l i l 1 1 1 1 1 1 I :I 1 1-I 1 1 1 1 F.1?1 1
1111111111Ith1.-1111111 1111IIillllllli!1r:1111111111 t11111i11 111' II11 1111'111
!! 1 1!! 1! 1! I a? 7 ! !_? I I I! I 1 1!! I!! I 11! I I! I I( l l l( l l l( l l l l l l+ 1
! t l l t l l l l l l l l l l l l l l l l l t l t l l t l l t t l , I I I I i l 1' 1 1 1{ t it i i,
i t I t t t, t t-t t l l l t i t t i t l l t l l I I I L _ -,' I l l i
t I i 1 1 1 1 1 1 1 1 i: t
1
?II1i1111111116111!!111 III (lllllli !1!11
tl 1
1111 !i11?Ilillll 1 1 1 1 1 I t
-II11111111111111111 I!1 Illllllillllllllllll!111 li
!111111 1 l11111?!
?llllillllllillll 1 111,11111 IIIIIIIIIt11161
1111 11111111
I lilt!! 1111 IIIIIii
_Ililllll i ! 1111111111111-1llll
llll 11 I
l lt'itl•11!1
?_IL;!iilll.ll I Illlllllfflliilil! lillllIfI 111! I II'111I1i
- 1 1 1 1! I l i l l l l l l; l l l l ! t ? i 1 1 1
1 1 1 1 11 111
! 1 I I l l i l l l l 111111111
111!:lilltlllllill!Ililtli!II Sl:iilillll t
t ? 1 1 1 1 1 1?
I l t! i l l!! I I i 1 6 1 1 l l f 1 1! 1!! I I P i t{ I r l{ I I! I I i l ! I!
I ? I 1
I l l i l l: i l l l l l l l l i l l 1 1 1 1 1 1 1 1
I l l
I I i 1 1 I t I 1 I 1 1! I I 1 i! I 1 1 I i! 1 I: i i I; t i l! i l l l i l t t l
I I! I
I I! I l l l i l t I I I
I I 1 1 1 1 1 I I I I 1 1 1 1: i I: I i l l:!! I I! I I I; i t 1 1 1 1 1 1 1 1 1 i
l i ' l l I. I l t' l l l
I l l i t l i l l l l
l i l l l! f l l l t l l l t{ i i: I! I:! i l i l l l i i: i l:! I I it I I t I .
l i I I l i; i l l l l l l l l i l l l
1 1 1 1 S l
: i( t l l l l l
! I S ! 1! 1 1 1 1 1 t i I l l l l t l; l: i !, l i l l l l l I! 11 1! I I i
I I I S l
l t i l l l l l i I t l
1 1 I t I I i l 1 1 1 I i l l l l i l
! I I ,! t t! i t i t l i t l i t: 17i
t i, i + • i i i t t t, l i 1 1 1 1
l i,+ t i ! l i: . I! 1 1 1 1 1
I I I: I I i i 1 1; 1 t 1 i 1 1 1 1 1;'{ I- I? t? i l 1 1! i I 1 1 i l 1 I l i! 1
!
(! ?+ i + I t l l l l l i ;1 1 1 1 1 ' 1 1 1 , i : t l l: l l l l
I I I 1 11
. 1 1 1 1!
1 1 1 1 I l l t l l
t i t ! ! I l i i!! I 1 1 1 1 ; i! + I l t ! ; I 1 S I F!
! 1 I I I I I I i i i i
! I I I l i l l 1
I t +. ! I I i l l! I f i i i 1 1 1 I I! i l! I I t j l I l l l i l l l
l l '!: ! 1 1 1 1 1 1 1 1 1 1
1 1 1! 1 1
! 1 1! t
i
! i t
l i l l t 1
l i t , l i l i;; t i l ! I; 1 I I I ! I . + 1 i! 1 1
1 T-1 l
t I I I
! I? t I S!! !
1 1 1
_' , 1 t 1 1 1 i,' l l I I I I ! i 11 t: I t I!' 1 ! I l t! i l: l l! i l! I i l l l l i!
!: I I : I l i l l i If I 1! ; I I I I I I I I
! ! t l 1 1 1 t I l t! ! i l! l
i 1 I t l i l 11-! i l l i l l l l
I T -T
t l +! I ! I I I I! I l t l l l l t
I I I!-I I i '' I l ;' I l i ! !
I l
1 I! i l l l I
t! I t I l I 1 1 1 1 1 1 11 11 + 1 I l i!! i ! ;
f! I l l
1 i. t l ? l l l l l t! i
I i ! t! I I I I I 11 I! I I i I l l i' i
? ! ! I ' i 1 I' t l t ! I I 1!! 1 1 1 1
i l l ! i I 1 I I 1 1 1 1: 1 1
t!!: !: I I i t I l i 7 ; t i
' I I! t : 1 t i+ l
! i l I
1 I l l t l d I?
! 1 1 i I I t!? 1
i 1 I i i
I I l i 1
I t l l l l l
t i l i i l f l l l l l '..i
1 1 ,
! I I I! I I i l! i t i I I t 1' i t
!!! I I1• ! I i l
l i l i
i 11 I !
I J t i l i;
I , I +.1 I I!! ! I I 1; i ! I I I ? ! ! I I I!
i I+ 1 1 1 1: 1 1 1 ! 1
I l l i l
i l i l t l
!+ 1;: 1 1 1 I t
i
+ 1 1 1 1 I i 1 1 1 I 1 1 t t !
I. !
i 1 I
1 1 1 1 1' 1 1
i t l t :? I+ I :/ i l ? ? ? i i
!! I I'+ 1 1 1' 1 I I •1 I
I ! t
T I
t I I I I I I 1 t 1 I I I I t t 1 I 1 1 1 I I I
I f t !
' I t t i I i I I 1
? 1 1,
I' I I I I I i l l
?+ !! 11
l l I II t
I 1 i
t! 1
' I ' ! ? I i 1 I ' i i 1
: 1 1,•: 1 1 1 1 .
1! 1 1 1'
1 j : 1 1 1 1
I I I ' 1 1 I I 11 1 i - !' I I ; I ! I ! j ! ,
• i I: i ! t i I ? I I i ? i 1 1
?? I i I :; 1; 1! 1 1
f i I i i I I 1 1 ' I I I 1 I! i l i -h I t l l
. 1! t I! I l l s 1
1
`oTe:
-:r=ora :msion con-; of
..:N•ic:s not snovr_, but -will
c1llQ: t:-at)o:-?y Silt S. ..:^,
oci; ch=k dz-s and silt
:gins, as n::.4:d.
y 6-Z4--oA-
iN;
Condlscted B ree
D-a?-n By D4
?'r
J
J_ ¦
In ¦
l 1 ¦
F-
U W J Q 0
¦ _
_j LLI 1 1 ¦
• ' F-
F- 0
ON :D O Q 4W ¦ ¦ Z
LL 4VI
O ? j
IL Y + +
Z
? ¦ ¦ co
Q F- p 1 ¦ 1 !
OmW F- ¦ 1
X _j F!
LLB ZN ? 1 1¦ _O LL
Q # ¦ 1 1 ¦ F_
_j W ¦?'? 1 1¦ Q P_
Ld Q it t F_ W
X
Q O
a
W Q
F-
O Q
Z T_
Q
U
Z
w
F-
ko 3t
W
-------------
x 10 < (D
O Q Q
O w O O
m 0 ? ? •• 1 J
O Z m Z w • `L??
m O V) ? • j 1 ¦
O ? • - ¦
(_, Q Z X d • 1 i
s
Fn U F- W at
*I ?o
F_ x IN
LLI F- C0
Z
J 1• W W O
0 lk ?4
•. ? F- Ln Q J v
Q U ? •
LLI rn C) C)
C) (3-1 u
0 C3
LLI
66 _j
010.011111,410* ik • 0
U m
F-
F- Q ? IL V) O
? • C/) W F- 03
W W O Q ~O
Z ? ??- ? O Z
0 CD
0 x cf)
OZ Q [? v
N
OD
a ? ++f
Q W
J J L?
? W O ?
N
• U
O
I
I X I
I
I = I
' I X I
• I ? I
Q
W
N Z
_
# J #
W N W
?°
# o o
Q
Y
w
V K ? vvc iv ryrZ
a
Lri
H
0 -R
3
cc_
F-
W
w
M Q
~ °' CC
N N ?
o Q ?
F-
W Ld
U v
O LL. _
U Q F-
CC)
oD to O O
N N
tD W W N
4 O
o F- F-
< ° = a F- F-
Q 3 Z W N
~ W
N CL >> O
N O
a a a
L) a
ti O O
? W W ? t!7 It O J
M m J .
W N _N
O W X O LL.
Z Q OU-) J O LL
W W 3: O \ QUO
m W X N cr
(, F- fLLI - Z
O N >
W
m Q N
W Q
J
Z N
N
Y
W
W
V
v
2 Obi O
F- - m U x
om Q z
z N = o_
O m F- X
F- Q
C) n V W
CL Pr) W m
m N aW =m v g o
p v) d F- Q J
a od cr LL- w W
J Q O N c ir- m
ca U J W Z N F- = 0
F- W u CO O N om
W F- Q W Q
Q W F- -J Q
CL F- Q W
LLI
Z ti d
O FL N
Z
a.
N
O
co
v
CV)
0
O
qqr
0
c '
rn
ui
O
CL
rl-
CC)
M
C
0)
m
?T
^V
J
D
r
0
m
0
O
/z
VJ
Q
(Q
O
N
N
0
A
O
w
cu
00
W
a
N
C
r-
0
m
m
,W
IN
-t
n
rD, °
N N
M
0 I
m
D
c
m
r
m r
N
m
D
m ?
N fn
r
D
z
m
N
S
O
r a
O
m
0
?a
n
2
0o
4 -{
7o n
O
p
m m
r)
C-
z
v
n o
<a m
n -i
-<
z
m -4
Mc -1 .. D
m
v U_
)
z
D
Cl)
=
_ H
Z
N
m m W
o
z c
?
_
`i J
? h T
p Z ?
0
.?
r'1
D ? ? V
m
N D r
`J)
sn
o
?n
M
0
C m
0 ?
c?
z -O
n
m r-i
x m D
n
m
l J
H
0
z
-i
m
N
N
V