Loading...
HomeMy WebLinkAbout20040119 Ver 1_Complete File_20040120 Qn- vG \ o -? Governor William G. Ross, Jr., Secretary Department of Environment and Natural Resources Gregory J. Thorpe, Ph.D. Acting Director Division of Water Quality DWQ Project No.: U'1 U 1/ 17 Applicant: N(- LJO;E Project Name: s k- 139 Date of Issuance of 40:1 Water Quality County: wa Tatla Q on: Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules,.and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional I, ?l.P/?F/L , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Bu r Rules, the approved :plans and specifications, and other suppo tin materials. Signature Registration No. Date N DEt'ii: Division of Water Quality 1650 Mail Service Center Raleigh, NC 27699-1650 Wetlands/401 Unit: (919) 733-1786 Fax: (919) 733-6893 ^?O \N A i EEO G T_ ? d Alan W. Klimek, P.E. Director Coieen H. Sullins, Deputy Director Division of Water Quality February 26, 2004 Watauga County DWQ Project No. 040119 APPROVAL of 401 Water Quality Certification with Additional Conditions SR 1347 (Big Hill Road) Mr. Mike Pettyjohn, P.E. Division Engineer N C Department of Transportation Post Office Box 250 North Wilkesboro, North Carolina 28659 Dear Mr. PettyJohn: Ei L! ZOO N.C. DEP T. Or TRANSPOnTATiON Do?iRICT ENGINEER You have our approval, in accordance with the attached conditions and those listed below, to impact 230 linear feet of fourteen (14) unnamed tributaries to the South Fork New River (80 feet of new pipe and 150 feet of riprap) and temporary dewatering of 70 linear feet of stream in order to improve SR 1347 (Big Hill Road) in Watauga County. The project must be constructed in accordance with your application dated January 14,. 2004 (received January 20, 2004), including the environmental commitments made in the application letter. After reviewing your application, we have decided that this fill is covered by General Water Quality Certification Nos. 3404 and 3366, corresponding to the U.S. Army Corps of Engineers Nationwide Permit Numbers 14 and 33. In addition, you must acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with the accompanying 404 Permit unless otherwise specified in the Water Quality Certification. This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify the- DWQ in writing and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. if total wetland fills for this project (now or in the future) exceed one acre, or of total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For.tlus approval to be ralid, you must follow the conditions listed in the attached certification and any additional conditions listed below. 1. Erosion and sediment corTtral practices must be in full compliance with all specifications governing the proper design, installation and gyration and maintenance of such Best Management Practices in 'order to protect surface water standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices. shall be maintained on all construction sites, borrow sites; and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. Any reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act: Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment nd Natural Resources 585 Waughton Street Winton-Salem, NC 27107 Telephone: 336x71-4600 Fax: 336/771-4633 Customer Service: 1-8771623-6748 WAT?4G Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources ;?'-- Alan W. Klimek, P.E. Director > Coleen H. Sullins, Deputy Director {] Division of Water Quality February 26, 2004 Watauga County DWQ Project No. 040119 SR 1347 (Big Hill Road) APPROVAL of 401 Water Quality Certification with Additional Conditions Mr. Mike Pettyjohn, P.E. ? :r?, v ??? TLP?i?nar f' *H, Division Engineer N C Department of Transportation MAR 9 2004 Post Office Box 250 North Wilkesboro, North Carolina 28659 Dear Mr. Pettyj ohn: . You have our approval, in accordance with the attached conditions and those listed below, to impact 230 linear feet of fourteen (14) unnamed tributaries to the South Fork New River (80 feet of new pipe and 150 feet of riprap) and temporary dewatering of 70 linear feet of stream . in order to improve SR 1347 (Big Hill Road) in Watauga County. The project must be constructed in accordance with your application dated January 14, 2004 (received January 20, 2004), including the environmental commitments made in'the application letter. After reviewing your application, we have decided that this fill is covered by General Water Quality Certification Nos. 3404 and 3366, corresponding to the U.S. Army Corps of Engineers Nationwide Permit Numbers 14 and 33. In addition, you must acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with the accompanying 404 Permit unless otherwise specified in the Water Quality Certification. This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify the DWQ in writing and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or of total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to be valid, you must follow the conditions listed in the attached certification and any additional conditions listed below. 1. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface water standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. Any reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 585 Waughton Street Winston-Salem, NC 27107 Telephone: 3361771-4600 Fax: 336/771-4633 Customer Service: 1-877/623-6748 t Mr. Mike Pettyjohn, P.E. February 26, 2004 Page Two 2. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Preconstruction Notice Application. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 3. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. 4. The South Fork New River and its tributaries are classified as C + waters. NCDOT shall use Best Management Practices for the Protection of Surface Waters (NCDOT March 1997) and Sedimentation and Erosion Control Guidelines for Sensitive Watersheds [15A NCAC 4B.0124 (a)-(e)]. 5. The "+" indicates that these streams are subject to special management conditions and drain to Outstanding Resource Waters according to the DWQ stream classification schedule. You will be required to contact WRC to determine what, if any, special management conditions apply to this location. 6. Instream work and land disturbance within the 25-foot wide buffer zone are prohibited from April 1 through June 30 to protect fish spawning and mussel propagation. 7. NCDOT is encouraged to use onsite vegetation and materials for streambank stabilization when practicable. 8. Riparian vegetation must be reestablished within the construction limits of the project by the end of the growing season following completion of construction. 9. Stormwater should be directed to vegetated buffer areas, grass lined ditches or other means appropriate to the site for the purpose of pre-treating stormwater runoff, and must not be routed directly into streams. Mowing of existing vegetated buffers is strongly discouraged, so that they may be utilized for stormwater sheet flow. 10. Where fish passage is present or where significant aquatic life may be present upstream (and where practicable), culverts should be oversized and buried to prevent perched culverts. If oversized piping cannot restore aquatic life passage by reconnecting the stream ecosystem, riprap installation should be accomplished in a manner to provide or restore water channels downstream to help facilitate aquatic life movement. 11. Where practicable, culverts that are less than 48-inch in diameter should be buried to a depth equal to or greater than 20% of their size to allow for aquatic life passage. Culverts that are 48-inch in diameter or larger should be buried at least 12 inches below the stream bottom to allow natural stream bottom material to become established in the culvert following installation and to provide aquatic life passage during periods of low flow. These measurements must be based on natural thalweg depths. This may require increasing the size of the culvert to meet flow conveyance requirements. If any of the existing pipes are perched, they shall be removed and replaced, and re-installed correctly, unless demonstrated that this is topographically unfeasible. All waters must flow through without freefalling or damming on either end of the culverts during low flow conditions, to maintain aquatic life and/or fish passage. 12. The dimension, pattern and profile of the stream, above and below the crossing, should not be modified by widening the stream channel or reducing the stream depth. Disturbed floodplains and streams should be restored to natural geomorphic conditions. 13. Any riprap used must not interfere with aquatic life passage during low flow conditions. 14. If concrete is used, work must be accomplished so the wet concrete does not contact the stream water. This will lessen the chance of altering the stream's water chemistry and causing a fish kill. 15. Heavy equipment must be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the likelihood of introducing other pollutants into the stream. 16. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. 17. The presence of equipment in the channels must be minimized. Under no circumstances must rock, sand or other materials be dredged from the wetted stream channel under authorization of this permit, except in the immediate vicinity of the culverts. 18. All work shall be performed during low flow conditions. 1 Mr. Mike Pettyjohn, P.E. February 26, 2004 Page Three 19. Upon completion of the project, the NCDOT shall complete and return the enclosed "Certificate of Completion" form to notify NCDWQ when all work included in the §401 Certification has been completed. The responsible party shall complete the attached form and return it to the 401/Wetlands Unit of the NC Division of Water Quality upon completion of the project NCDOT is strongly advised to send in photographs upstream and downstream of each structure to document correct installation. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Ms. Cynthia Van Der Wiele at 919.733.5715 or Mr. Mike Parker of the Asheville Regional Office at 828.251.6208. Sincerely, r 4k/? /---,/Alan W. Klimek, P.E. Attachment cc: Wilmington District Corps of Engineers Heath Slaughter, Division 11, DEO John Thomas, USACE Raleigh Field Office Wetlands/401 Unit Winston Salem Regional Office Mike Parker, NCDWQ Asheville Regional Office Central Files MEMORANDUM TO: John Dorney Regional Contact: _Michael R. Parker Non-Discharge Branch WO Supervisor: Steve Tedder Date: SUBJECT: WETLAND STAFF REPORT AND RECOMMENDATIONS Facility Name NCDOT - SR 1347 County WATAUGA Project Number 04 0119 County2 Recvd From DOT Region Asheville Received Date 1/20/04 Recvd By Region Project Type pave road Certificates Stream Stream Impacts (ft.) Permit Wetland Wetland Wetland Stream Class Acres Feet am Type Type Impact Score Index Prim. Supp. Basin Req. Req. ti' O N -1F-c -F + 50,701. F 230.00 F 190.00 40.00 14 Stream 77T__ F -1 F- o rte Mitigation Wetland MitigationType Type Acres Feet Is Wetland Rating Sheet Attached? 0 Y 0 N Did you request more info? 0 Y 0 N Have Project Changes/Conditions Been Discussed With Applicant? 0 Y 0 N Is Mitigation required? 0 Y 0 N Recommendation: 0 Issue 0 Issue/Cond 0 Deny Provided by Region: Latitude (ddmmss) 36.2853 Longitude (ddmmss) 81.6166 cc: Regional Office Central Office Page Number 1 t IN. ?Ty q'AgFo hH d py? ?. STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY P. O. Box 25201, Raleigh, NC 276 1 1-5202 LYNDO TIPPETT GOVERNOR PHONE: 919-733-2520 SECRETARY January 14, 2004 Mr. John Thomas U. S. Army Corps of Engineers Raleigh Regulatory Field Office 6508 Falls of Neuse Road, Suite 120 04 Raleigh, NC 27615 Subject: Nationwide Permit #14 & #33 SR 1347 (Big Hill Road) Watauga County, North Carolina Project Number: 110.095023 (DWQ Permit Fee; Dear Mr. Thomas: The NC Department of Transportation is scheduled to grade, drain, base and pave SR 1347, Big Hill Road in Watauga County. Total project length is approximately 2.9 miles. The roadway width will not increase. Impervious surface area will not increase. This project will require the replacement of thirteen (13) wet cross lines and the relocation of one (1) wet cross line as shown below: Station Number Existing Pipe Size Proposed Pipe Size Riprap Impacts feet Total Impacts at this Station ft. 20+95 30'x 18" 30'x 18" 10 10 34+25 75'x 24" 75'x 36" 10 10 44+45 80'x 24" 80'x 24" 10 10 53+15 100'x 24" 100'x 36" 10 10 60+30 50'x 24" 50'x 24" w/ Junction Box 10 10 68+60 40'x 36" 50'x 36" 10 20 98+75 40'x 72" 50'x 72" w/ HW 20 30 111+00 40'x 24" 50'x 36" 10 20 117+70 40'x 18" 40'x 24" 10 10 136+50 40'x 24" 40'x 24" 10 10 152+00 30'x 18" 40'x 18" 10 20 153+26 40'x 18" 50'x 24" 10 20 160+00 30'x 18" 50'x 24" 10 30 *161+50 40'x 18" 50'x 18" 10 20 P. O. Box 250, N. WILKESBORO, NC 28659 PHONE (336) 667-9111 FAx (336) 667-4549 T Mr. John Thomas SR 1347, Big Hill Road, Watauga Page 2 January 14, 2004 * An unnamed tributary to the SFNR enters our ditch line at station 161+50 and flows to the existing 40'x 18" pipe at station 162+40. We plan to add a 50'x 18" pipe at station 161+50 and eliminate the existing pipe at station 162+40, thus preventing the small creek from traveling through the ditch line prior to entering the SFNR. This will result in an additional 10 feet of piping and 10 feet of riprap at this station. Miscellaneous riprap impacts will total 150 linear ft. or less. New stream impacts = 230 linear ft. The replacement of the deteriorating pipe at station 98+75 will require temporary dewatering. An impervious sandbag dike will be constructed approximately 20 feet upstream of the existing pipe to create a small pool. Clean water will temporarily be pumped around the construction area and will be discharged into a buffer area downstream. Any dirty water located inside the construction area will be pumped into a silt bag. The dewatered area at station 98+75 will total approximately 450 square feet or 0.01 acres. Once the new structure is in place, the impervious dike will be removed and preconstruction streambed elevations will be restored. Construction of this project will require impacts to waters of the United States in the New River Basin. Each of the above noted wet pipes carry different unnamed tributaries to the South Fork New River (Class: C+). This project was reviewed for the presence of threatened and endangered species on December 2, 2003. This project will have no effect on any federally listed endangered plant or animal species. The State Historic Preservation Office has reviewed this project and agreed with a "no adverse effect" finding provided that all of the proposed improvements near the Todd Historic District occur within the existing right-of-way. To that end, the last 700 feet of this project will be constructed within existing maintained limits (only the last 200 feet or so is visible from the Todd Historical District). The majority of the proposed project impacts are associated with riprap placement for inlet/outlet stabilization. These impacts are minor in nature and should not remove or degrade existing water quality uses. Pipe sizes used will be the minimum necessary to create a safe roadway. By utilizing the erosion control measures outlined in the attachments to this application, downstream water quality standards will be protected. All appropriate BMPs will be used during construction. Attached is a Preconstruction Notification Form, plan sheets with proposed erosion control measures, a marked county map, a marked topography map and photographs. By copy of this letter, it is requested that Mr. Ron Linville, Mountain Region Coordinator, with the North Carolina Wildlife Resources Commission comment directly to you concerning the 404 Nationwide Permit application with a copy sent to me. By copy of this letter, I am forwarding seven (7) copies of this application package to Cynthia Van Der Wiele, NCDENR, Division of Water Quality, 401 /Wetlands Unit, for her review. It is Mr. John Thomas SR 1347, Big Hill Road, Watauga Page 3 January 14, 2004 requested that any comments related to the 401 certification be forwarded directly to me with a copy sent to the US Army Corps of Engineers. We would like to begin construction as soon as possible. If further information is required, please let me know. Your early review and consideration will be appreciated. Sincerely, 7c, le4 ? - A7? Heath Slaughter Division Environmental Officer Enclosures cc: John Thomas, US Army Corps of Engineers (1 additional copy) Ron Linville, Western Piedmont Region Coordinator, NCWRC Cynthia Van Der Wiele, Division of Water Quality (7 copies) Mike Parker, Division of Water Quality Mike Pettyjohn, PE, Division Engineer Kipp Turner, PE, District Engineer Kevin Whittington, County Maintenance Engineer Heath Slaughter, Division Environmental Officer Neil Trivette, Roadside Environmental Field Operations Engineer Dennis Bennett, Bridge Maintenance Engineer r. Office Use Only: `040119 Form Version April 2001 USACE Action ID No. DWQ No. If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. 1. Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ? Section 10 Permit ® 401 Water Quality Certification ? Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: NW #14 & #33 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: ? II. Applicant Information 1. Owner/Applicant Information Name: North Carolina Department of Transportation Mailing Address: P O Box 250, North Wilkesboro NC 28659 Telephone Number: (336) 903-9236 Fax Number: (336) 903-9239 E-mail Address: hslau hg ter@dot.state.nc.us 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Heath Slaughter, Division Environmental Officer Company Affiliation: North Carolina Department of Transportation Mailing Address: P. O. Box 250, North Wilkesboro, NC 28659 Telephone Number: (336) 903-9236 Fax Number: (336) 903-9239 E-mail Address: hslaughter@.dot.state.nc.us Page 3 of 12 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: SR 1347, Big Hill Road 2. T.I.P. Project Number (NCDOT Only): 11C.095023 3. Property Identification Number (Tax PIN): N/A 4. Location County: Watauga Nearest Town: Todd Subdivision name (include phase/lot number): N/A Directions to site (include road numbers, landmarks, etc.): See attached SR map. 5. Site coordinates, if available (UTM or Lat/Long): 34+25 DD: 36.2853° N. 81.6166° W 68+60 E (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: Residential/Farm 7. Property size (acres): Approximately 17.9 acres. 8. Nearest body of water (stream/river/sound/ocean/lake): UTs to South Fork New River (Class: C+) 9. River Basin: New (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) Page 4 of 12 10. Describe the purpose of the proposed work: Grade drain base and pave SR 1347. 11. List the type of equipment to be used to construct the project: Trackhoe/backhoe, motor grader and dump trucks 12. Describe the land use in the vicinity of this project: Residential/Farm IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. V. Future Project Plans Are any additional permit requests anticipated for this project in the future? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: N/A VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Page 5 of 12 1. Wetland Impacts Wetland Impact Site Number indicate on ma Type of Impact* Area of Impact acres Located within 100-year Floodplain** es/no) . Distance to Nearest Stream feet Type of Wetland*** N/A * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at http://www.fema.aov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: Total area of wetland impact proposed: 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Length of Average Width of Perennial or Site Number Type of Impact* Impact Stream Name** Stream Before Intermittent? (indicate on map) (linear feet) Impact (please specify) Station No. 20+95 Pipe replacement 0 feet UT #1 to SFNR 1 foot Perennial Station No. 34+25 Pipe replacement 0 feet UT #2 to SFNR 6 feet Perennial Station No. 44+45 Pipe replacement 0 feet UT #3 to SFNR 1 foot Perennial Station No. 53+15 Pipe replacement 0 feet UT #4 to SFNR 1 foot Perennial Station No. 60+30 Pipe replacement 0 feet UT #5 to SFNR 3 feet Perennial Station No. 68+60 Pipe replacement 10 feet UT #6 to SFNR 1 foot Perennial Station No. 98+75 Pipe replacement 10 feet UT 97 to SFNR 5 feet Perennial Station No. Pipe replacement 10 feet UT #8 to SFNR 3 feet Perennial 111+00 Station No. Pipe replacement 0 feet UT 99 to SFNR 2 feet Perennial 117+70 Station No. pipe replacement 0 feet UT #10 to SFNR 2 feet Perennial 136+50 Station No. Pipe replacement 10 feet UT #11 to SFNR 1 foot Intermittent 152+00 Station No. Pipe replacement 10 feet UT #12 to SFNR 1 foot Intermittent 153+26 Station No. Pipe replacement 20 feet UT #13 to SFNR 2 feet Perennial 160+00 Page 6 of 12 i. V Station No. 161+50 Pipe relocation 10 feet UT #14 to SFNR 2 feet Intermittent Miscellaneous See attached rip-rap 150 feet UTs to SFNR 1-6 feet Perennial/ cover letter placement for Intermittent stabilization * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.usss.Qov. Several Internet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com, www.mMuest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 2301n. ft. of new permanent impacts. 3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. Open Water Impact Site Number indicate on ma) Type of Impact* Area of Impact acres Name Waterbody ) (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. 98+75 Temporary Dewatering 0.01 UT # 7 to SFNR Stream * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: till, excavation, dredging, flooding, drainage, bulkheads, etc. 4. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): N/A Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,. local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: Page 7 of 12 VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. By utilizing the erosion control measures as shown in the attached drawings, adverse impacts to streams in the area will be minimized. Since this is an existing roadway, the stream impacts cannot be avoided. However, the replacement pipe lengths will be the minimum needed to safely construct the paved roadway. All appropriate BMPs will be used during construction. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/ncwetlands/strm.gide.html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. Page 8 of 12 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at hqp://h2o.enr.state.nc.us/wrp/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): N/A IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. .Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No ® If you answered "yes", provide the following information: Page 9 of 12 r. Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers.. Zone* Impact (square feet) Multiplier Required Mitigation 1 3 2 1.5 Total * Zone I extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0260. N/A XI. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. Impervious surface area will not increase. All appropriate best management practices for sediment and erosion control will be implemented during construction. XH. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A XIII. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No Page 10 of 12 r. XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits.. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). Applicant/Agent's Sig#ure . Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) US Army Corps Of Engineers Field Offices and County Coverage Asheville Regulatory Field Office Alexander Cherokee Iredell Mitchell US Army Corps of Engineers Avery Clay Jackson Polk 151 Patton Avenue Buncombe Cleveland Lincoln Rowan Room 208 Burke Gaston Macon Rutherford Asheville, NC 28801-5006 Cabarrus Graham Madison Stanley Telephone: (828) 271-4854 Caldwell Haywood McDowell Swain Fax: (828) 271-4858 Catawba Henderson Mecklenburg Transylvania Raleigh Regulatory Field Office Alamance Durham Johnston Rockingham US Army Corps Of Engineers Alleghany Edgecombe Lee Stokes ,6508 Falls of the Neuse Road Ashe Franklin Nash Surry Suite 120 Caswell Forsyth Northampton Vance Raleigh, NC 27615 Chatham Granville Orange Wake Telephone: (919) 876-8441 Davidson Guilford Person Warren Fax: (919) 876-5283 Davie Halifax Randolph Wilkes Washington Regulatory Field Office Beaufort Currituck Jones US Army Corps Of Engineers Bertie Dare Lenoir Post Office Box 1000 Camden Gates Martin Washington, NC 27889-1000 Carteret* Green Pamlico Telephone: (252) 975-1616 Chowan Hertford Pasquotank Fax: (252) 975-1399 Craven Hyde Perquimans Wilmington Regulatory Field Office Anson Duplin Onslow US Army Corps Of Engineers Bladen Harnett Pender Post Office Box 1890 Brunswick Hoke Richmond Wilmington, NC 28402-1890 Carteret Montgomery Robeson Telephone: (910) 251-4511 Columbus Moore Sampson Fax: (910) 251-4025 Cumberland New Hanover Scotland Pitt Tyrrell Washington Wayne Union Watauga Yancey Wilson Yadkin *Croatan National Forest Only Page 11 of 12 aw. li wu..?a? i.+? i ?a"5 aam awau?, ?? aanu?,a a..vuau?? Subject: Re: [Fwd: SR 1347 (Big Hill Road), Watauga County] Date: Tue, 13 Jan 2004 17:54:46 -0500 From: Nathan Kipp Turner <kturner@dot.state.nc.us> Organization: North Carolina Department of Transportation To: Heath Slaughter <hlluughter@dot.state.nc.us> CC: "Ivan H. Dishman" <idishman@dot.state.nc.us> YES! We were planning to construct this end on maintained limits anyway. It is wide enough to pave the existing without doing much else. We are showing the last 700' to be maintained limits which basically means no work beyond the existing ditch and shoulder point. We did not obtain any additional R/W in this section. Thanks, Kipp Heath Slaughter wrote: Hey Guys, Can we construct Big Hill Road within the existing ROW limits near Todd Historic District??? Also, please prioritize Watauga SRs that need Historic survey work and forward back to me. Heath Subject: SR 1347 (Big Hill Road), Watauga County Date: Mon, 12 Jan 2004 17:10:46 -0500 From: "Vanessa E. Patrick" <VEPatrick@dot.state.nc.us> Organization: North Carolina Department of Transportation To: Heath Slaughter <hlaaughter@dot.state.nc.us> Heath: I met with Renee earlier this afternoon to discuss the SR 1347 project at its juncture with the Todd (NR) historic district. She has agreed to a "no adverse effect" finding on the condition that the improvements occur within the existing right-of-way. Will that work? Let me know if you'd like a copy of the concurrence form for your files. The SHPO will be sending responses to your recent batch of SRs very soon. As expected, SHPO has requested an architectural survey for SR 1514 (Indian Grave Road) in Caldwell County. Ten (!) additional projects will also require survey, so can I ask you to prioritize the list and also provide me with permit areas once you have received the requests? The ten projects are: SR 1626 (Surry); SRs 1323, 13396, and 1541A (Watauga); SRs 1137,1151, 1205, 1373, 1511, and 1717 (Yadkin). As always, many thanks. Vanessa 1 of 2 1/14/04 10:05 AD SK /Jy / gig /-l;/l Koact WafaL(gcL C OwAy Meat Cc mf alud Qa/d MAN. TwsP. LeW9 t), : ?,9 11?? IE5 ,. r \ e ' O ti . • 1344 • ? \ c r ; 43 L \ \ 1 O C c \ \1 ? , . S ,340. \ 1341 •:, 1342 J 1 y 3 ` :/' .^.•\ • 2 , •,; ?....../ \ OLD -1E_D BALD , 4939 E \ 'u, . • ? / .. / • \ • a ' 1. ?' • \ 1340 J \ \ _ I i v ,243'.-. ..'6 ?,. \ 3170 /• •\ •\ , / ..^ 1 J ' C \ ••J ' •\ • 1729. 1231 • ° i S g?+yy? '\ 36 0. 6 1301 , _ "^F' 1 \ / •I73 ' '? z / / Y ? . SNAKE ELEV.5574• ELK KNOB \• \ E! Ev 5555 1 1 :;,KEYS KNOB \ . 1346 \ •.ELEV.4400 '.1,• .> • 4 I 1 .b • ' \ ' 576 i1 1' .> 0 1388 13?'• ` ' \ '•\ \ 9 •\ RICH IMTN. 1300 9A • 12281•; ?" \ • • \ GAP k ' \ \ 1340 ' S t2ro •2 6 ,303 'N . ? 4• RICH MTN. \ volley Cn, / R.g.IyTTLO MjN. O /? a F I / a .ELEV, 5372 '• •r 13% 9a O C, 1304 0 • ^ I \? 1369 ? ;t \ •• 1219 . I 365 1 • YZ 3 ;}? 26 O \ v b t` 1305.'/ 378 1376 '\ r340 r'"' I I \ T ' 3p5 '6 ?3.0 1233 1364 6 M,mc" \ 131 POTATO \ ? •\ , . . 121 t 1 • • HILL 1348 4 • 6 A- , Y art 6 m ,zi 2 1376 5'A ?1°^? • . iw_ \ 1, _. 7 '339 1 7 ••t• ?' ' / ' . - ' 6 ;? ^ • h 1383 1306 ' \. _ - •\ ° 1339' \ • 7 I 9 34] \ 1216 1233 •21394 •t;\ \ 3% 13 •\ ? 1215 130tl O ', 5 1 1.6 t7• ;}; 1338 ^ ' 1406 1306 m133S •\ • .111308 \ 27 \ ?;B 1233 8 1368 1364 .y 1337 r O m is '350 1352 ,396 1102 9 4 1 F 1 • •,? 1351 \. . 13 1 1309 1, . 336 35 1324 ?4'+b •9?' SUGARLOAF 1331 1' ° \ ? 1 i, l \ i `\ .I t 1•s MTN. (J .51 ? \? ' SMr.ead I 1312 1373 1 1395 • 1322 1323 ?. i \ 13.Y' 9 \ ° 421 P 6? 1\ 35 v o /C 1367 .6]\ 8 8 9 0 \ 1353 N _ A 81 1325 1 ,1311 . ° 321 ,. , ?' .. a 6 1325 , 1327 11@ . Y 1351 et. 333 \ > \, \ 312 ` O\ is 2 7355 NER \ •0 1359 N '\ 1321 1326 N 1331 .4 2 6• ? 1359 / • \ '0 1117. ' 1313 ° 360 1 • 13851 13V 1392 1354 n (\ ?m \ 1 Y?? 1311 . 1102 •-- < •7j 1405® 6 Sond. ,n 1353 __ ., . Bruq?, h 1375 -'\ •,i\ c:.1 1332, 7 NEB • 'f' \ Yi - • 1 h .1165 ?• P° 1407 _ 2? ,y ? 9a 117]' •>? / L-0 tOONE ? / \ \ 1353 .?• ^' r• ?. J p r ' \ • • ' 1142 - MF. 14.035 HOWARD KNOB -/rH 1331 2 ? I.- v ° 1566 \ 7 '\ 1 57 1117 O 1215 1 421 321 F Admen K p ELEV. 4445?v. I- 3 •81391 84 A '' m " 3 .7 f -tom h 1. I ] f ` I 1 °F ' _ > ^ 1 1 1402. 1355 1357 - ' ` 1389 1505 O.p (pp 2 11131 / 1141 1 . 1660^•' - - - - " , ` ?p 1506 ll( ^ 116 r.? 221 ,+i; : • , ,. m b • 421 ROCKY MTN. ' ` O / 1.4: 3 F \ 4: ?/OG 1508/: I•P •B 1113 1 , - E_EV. 4078 ® \ / • ` ? ( 2.7 i \ ' 1 e• 1505 1 •1 vww eum 72,4 Q ^ _ 1 ?_i i m \ \ '569 1 6 1160 R C 1135 1 J I PQ 32 6 1\ : v? 112 .- h / 15173 /• f' 1393 1 /? i- 1 1570 ?.3 1508 ' 1 6 N 1111 '.'( : - - '' •? u, s,4 .y-L1•- 111777 i634 • i \ _ .6, , • \ ` • 1136 6 l ' Dumb- • • 1508 , _ '. =' s /'' _ I 1 ? 7 1551 - - - / 1553 . C 1, 12 20 3 510 Tupiwl .? 1134 , 181 rNATIONAL- _: 3 1532 1550 IT IS A ?,' 16J \ 6' l 1 L / s •?••I y C ' t 1549 1523 1653 6 r 1645 e • 1 \ [\ y / • a 4 A, "" ; , a7 . e - 53z . .2 l.0 4 23 ` 1541 C 1511 . \ . . 1511 ? 1_If . pp . ?O ?l 1525 ,'/i?8 / ^..\ / 6 j 1 • • shol. Mug / • • /• / 11 /' ' _ 1136 ? 15_81 221 1 1538 321 ISIQ 1578 ?? '.: ?? 666 `1541 ` \? • \ II' : \. ^• 1 J /- 6 C1 1540 F 1617 ? ' J.. .C... 164] , 1 580 , ' ? M1 4 71 1531 Q' 15 I4 ' '^..^'•?• ' ..... ' . 1558 , :(..? .i.d b •'l`' ? ? Pwm v 154,E W - 2 16166.1 Aho 1 / 15_W STOP M T N. 659 v 4595 L ` i /.?,•/. \ \ .1637 '' •> l.• .., , ? - X MAST KNOB ,' a DUGGER MTN.* /•' l•• / 1560 1559 • ^ 2.7 4.6 '•?y 1530' / ST FORE '? BLOWING ROCK y y KK' 1,3]7 .1 - :7 T lsz q 7 •,607 y \ ? ROCKY KNOB J j ' + ,• P • ^ ? LITTLE v 1 G .R Y Pa m SAMPSON MTN. ry r, 0•, S '\ 1,5? DUGGER MTN. \O 559 \ \ , '? \ 529 '• ?n "? • ^ J BL?E ./'• / ; ` ,N ? ` _- ? .1654 '\ p«+,7 •• /•/ 1 A n 156, 1 BUS • /' ,\ ; 1526 • \ /'' ' P 1.2' y .9 ^ . 1563 u • \ ?? .?. 'I \.C ^. 't' .^.^.^.^.^.^?? .6 11 ,.529 . ?• to ' 19e\ ? Ce., `? c > } 3 30 3 E For 3035 ?r - q 1 a6 , _BM 2981 Todd "? r t S 01 h YO, 7 _- 166+7s \ . ?., ` u SR 1347 \ . l' tG7 98+75 \?<31 v p / 68+60 ` $t ne.. ce, 1 ( ( 1 / ?? O `) y---?_ _ >.1? ?1 _ - \x;•0,90 IT - IT -N ??\ ._. \\ Gem ??? ?r, ? `. - ,??` \.- ?•. `-- ov \ CL4 Pilot 31tn -Cem AA LJ ??, r= J L - ' 4ZZ r `-?.????^t j? _ _• \? 339C, `` :. /// .. --: 3295 C-' v Copyright (C) 1998, Maptech, Inc. Cut Slope Paved portion of SR 1347 over Bridge South Fork New River SR 1347 SR 1347 (C) WATAUGA COUNTY SR 1347 SIG HILL ROAD STA riON NEW PIPE SIZE EXISTING WET PIPE WET PIPE 16.1-75 18" x 40' NO 25 X65 18"x 50' NO 30*07 18"x 50' NO 34+25 36" x 75' 24" x 75' YES 37+50 18" x 50' NO 40-x60 18"x 50' NO 44•x45 24" x 80' 24"x 80' YES 49-1.10 18" x 50' NO *5; +40 24NX 8' NO 53-P15 36" x 100' 24"x 100' YES 55-1-00 18"x 50' NO 60+30 24"x 50' 24" x 50' YES 87-1-00 18"x 50' NO 68 *60 36"x 50' 36" x 40' YES 711-50 18"x 40' NO 78+00 18" x 50' NO 82+55 18" x 40' NO 94+25 18"x 50' NO 95.1-80 18" x 100' NO 98+75 72" x 50' 72" x 40' YES 10'.+QO 18" x 40' NO 111:1+50 18" x 60' NO 11 '' +00 36" x 50' 24" x 40' YES 11'-'+70 24" x 40' 18" x 40' YES lz..+90 18"x 40' NO 1$1`1+50 24" x 40' 24" x 40' YES 131',P+20 18"x 40' NO 14:"!+50 18"x40' NO 141:1+18 18" x 40' NO 151,490 18" x 40' NO 15;--.'+00 18" x 40' 18"x30' YES 15:=1+26 24" x 50' 18"x 40' YES 15!-,475 24" x 50' NO 15=1+00 18" x 50' NO 161"1+00 24" x 5Q' 18" x 30' YES 16' +50 18"X50, NO EXISTING PIPE YES 16;.!+40 ELIMINATE 1401 X /8 it YES 16'1+35 18" x 40' NO DOES NOT INCLUDE DRIVEWAY PIPE *EXTEND EXISTING 24" CONCRETE 8' ON LEFT WET DRIVEWAY PIPE 2C +95 30'x 18" 30'x 1.8" YES r. - - \orth Carolina Department of Transportation ' Erosion and Sedimentation Control Plan :Prti6cZ F71 y to iL L Road: 5 k /•3 z11-;7' County: ?G ?4 ? y 4 Prepared bF : li-ev, h /1, 4 1S - -n ? Date: zpproFed by~ //.? . " 1 Date: - CoWAy MatnlLaanr n Date: =??'%3T O 3 District Engineer Date: Roadside Eavironm=21 Engineer Std_ r Descr-iation SN'mbol 1630.03 Temporary Silt Ditch SD 1630.05 Temporw-TDiversion D TD 1605.01 TemDorw-v Silt Fence 1622.01 Temporary Slope Drain ?-- 1630.01 Silt Basin Type 1630.02 Silt Basin Tvvpe-P 163-3.01 Temporar yRockSilt CheckT-,pe _A 1633.02 Tempor ar y Pock Silt Cheep Tz pe-B 163.4-01 Tempos ai y Roer: Sediment Dam T?e _A Mr ?? \\ 16317.02 T empo; ary ROCii Sediment Dam Type-J { • 1635.01 Rocki ipe inlet Se. invent T:-ap T z'p° _A 1635.02 Rock 1- i p e Inlet Sediment T I: p Type-?. '= ?? ? = 1636.01 Rock Silt Screen 1630_0s S Bing Basin Rock Inlet Sediment Trap; ? 6x2.03 T.pe-Il '? fly or in 1632.02 Tt-De B MD, or 1632.03 Typpe-c C 4.? or Cl 868.01 Rh) Par) -t-Ipe Outlet Energy Disipntex ? . Dlten Liner Pipe outlet or inlet Stabilization ? '-OTF: Silt Basin Type B: 3'xYby 6' long unless otherwise noted by Engineer v W D! Q N m ? o Q* Q 2 L ? O V W 3 4i ? ? ? 3 O r U RZZ O m w ] ? ¢u w am o w m?Waa °azraawJ Z?"'(n =("1JJ J?r(nrQ Win'=?NOOta. ? w !,Z ? wJ r r ° o =5°awozao ONNmm C7 rra w to Z \ ^ 2 3 Z ¢ w¢ LLlN a r jF'amJ°Q2 °wrz-a3om raNh}>mww tV F- ? d r x o?wruF?a u° J ir a N x -wwou mw b a°a°aEr¢aa cc w Q U ac?mrFaRF3 JJ J JO w UIf Qa aama:3-- N H ? W 1 OB O'T 2: m Z 00 =m O ?W +62 N W w? O 00 ? M W p M m rr W /If / -Aw- SR /M I I Al I I I w J J W ?,r) N ? ZN W Q m W lop I. F ??---009 & +15 U) Q' N 1 W W Z M O Q W p O 0 + 5 ?9. H cr N tr) W Y r, lf) mLr) 1 0?mtn Ln HILL RD 5R 135f TOM '752101 MU" N O N F? W T W N H W O n- cy'M O CD W _ (? m ?O w N I- W CO cr c n 6 -- Ov J ? ? ? JO w r- a LD CD In c? C?: o Q? w > W ?(D Ycr h ZZ O w m ? LL. W = ?C Cn Q? Z _ Lc ?C +23 2f N ZW N LiJO Q J N 0::V W O l CO D 2:Ln 00 2: CL Z =m 00 MAT N ?e0 - N W) w x.90 R ? r a N LLJCD O?- c0 LLjIn XO w 20 N w CD OC (Y) CO w? LD co fr© w A?lAT N . w +30 w 0?¦® a on ?k U i $ 3 { W ? 4 B l/AT w ?i ti N H ww xM Lfl w? X© Ld coo In ZDIILLSIQ aN009 WON M229MR %V,3 £0:VT £OOZ/60/ZT N O lk- W pgta= N6, F- m W? r 04 2:co >- Co Jcr 27 tnnnn _JO mm N W CO CE: (') O 'r CD W CD co 0:: O W MAT f? ' N A H W J ? W ? W O r Z N Z 3 Q Q T N ti w Q 0 C7 CO Q ?r ? Rc L = ? CO Q +6 LL CO i ® Z Z Q O m li MAT N ft? - ??w- N I' tn ti W tn w N 6. H m W tD or_ 04 ?CO > CO -Jcr J O co co .34*WM MAT N +0 f N F- ?t W M O M 2: Co w Ltd A LO o Q?:O !um LL]]11 32foai)Q +7 A H W f RER ?L 16 a MAT INE i l w J? J f,D W i O r- ? Ln N Z Q m r O co l W 000 N O ti W ILJ 38 1.1 I.t Z Lo Q CD O (Y) Q , Q ?cr- J O 3m MAT H N A a J A N W E 7 ' MAT N 9 W W J ? J Qo W O ?Lp N Z Q m 0 co k r N O K. W tn- 43+00.010 Z LO C(o CD Cry rr(? a cD T-cr Jp 3m MATCH IN r. Y y A W w? J QO Z CD Q ? F- (n ? LL cr !.L O w m A W O H W w w RE L i ? -J CD w. (V Z Q co c m N W W MATCA IN -a?- go w x r <r a? m a m(r <1w Mor- .moo 5m a I be w Jv ZCO a ?-- 6 cnm LLm Li-Cr wo '3m too in ZOIHI,SIQ amoog 1000 VT6859Z9Z9 %Vd CO:tT COOZ/t0/ZT M W Lai H Z O ?n Uff) O J tU m Ln cc 4? J Hx ?w ? i 9 w r?4 Z LO Qw UO <1 =C{ CD 4 Jp 300 49tm h z Oh Ui a? JN m In QO co JJ 3 ?...? 10 J? ?+ z CD F- w U) U) LL LLO W af] 9001(] mI2 sia aNooH loam M2299999 %Vd WK 9009/t0/ZT 0 `O N MZ cr :art M ?V Y 1^ U '! a? J N CO LC) 2: Q? Q O J CD J 3 56 +J90M 55 MAT N h 21 ' 1 h W F. s AJ l . w MAT N W z LL ZD co Y U '?` Q, J C6 DD N in Q m J O J co 3 01/13/2004 10:52 FAX 8282655414 NCDOT BOONE DISTRICT 16004 E?. O Z W Z V) z ?Cr ULc <r- I I JC'i 00011 LC I .,CI JC[_I v? 0. w? y h i? ? `C3 is Q! ?Y Vt h. z cr m? Yf-- UL0 Q I J 00 mN In QO Jm V1/iV/GVVY LV.VV iGla VGVGVVVYIY 11%,MV1 DVVL\L L101111V1 WJVUJ M 41 L 1 a N o c? ? * ?L I+ w y W z(.0 W? W Ln OC6 LLIN ?,LD U) cn It LLJO 200 U w _V 67+00M c-X 90 mm i a. L' LO d ? LO a. O ~- ? 00 `I _I / r 9 ti Z in Y Ltd U ? _D m N Li3 2: a Qo J CO J 3 74 N M o z N a? CD Lo Q? ?co N ?? >-- LC) ?n, W W O W N m m 7 3?0?4?0i0 w U J J J LD a F- z? Lt1 00 M (jo >- 0? LLI 0 JM H r a 74 +QflM LLJ z0 L. Jr- WT) 0c? L1JN ,LC) Lr)r,r LLJ0 F CO U a W ti Y Q 0 co O U L LI °D J co J LO Q Cc: O Z M Lt1 LLJ cr O z m? ?Lo U, aCO J N M Ln ?rr a0 J ? J 3 N O ti W h Z N (D Lo Q I rr m N >- LO F- F- rr, LLJ 0 mm ZZ +0040 W W W h C W ti Y a 0 o co. ? U W ? J LO J Q ? O Z CO LU LU Ir (D BOMOO LLJLC) Z LD W N Z rr >- o W -C : t N N n LO i a'' nnnn L+ N Lo Z N CC Q? O LD m Q i CC 00 N >- Lo F- F- C[: N W O I- C0 m LC) 00 N Lo Q-- 0 m v A A A 1 r D 000 Q (Y W LD C' r- Q LO J CC J O 3 CO Lai a W v K Q C- O CO U ?t W 00 J CO W ? J t; Q O ? z CO W W N m W = p F- N ?N 10 U00 0 N- W Cn Qm 00 Z V 1 00 I^` aco N CD CD co W 0 d c CD w Z H ? n W O Z >-- O 3 co a SARAH GLEASON BOR 685-272 -1 0 CO Q? -q- CD i a in J Cr -10 3 00 rr W' Z LO >-Lo 1 --LO WN Z >-CE-l Co 3 co :LIII N pq O tt. W T tn 93f0?0?0?0 rlr w U d- ? N r N U ? U) 00 Qm O S i- W x x00 O cY Z (Y) (J)07' W 6' J <r Q O 2 m U In ks W w r Ir Ld 2 ?N ?N UO 00 U) CC) < EM O© z w x 4 y 1y woo o(n Z Q' tl7Q' W Jcl: 0CO Qm 2 U C.5 Q1 ti W N rr W (_p _ ? U G) ? i cc'- C*7 U 114- Q? O O in J CD THOMAS CRITC DB 88-224 104f00M MAT r r W 103f00j00 102t00.W X , 11 x x X J 'IL _ X HER x MA N N W CO 0 ('7 O Z s ? U) 6 W -i CC cr- O Cm u 0 W tn oN Z ? 0@ I Q m Z O Opp O fO -- m w t0 =? U @ f-- Y M(n L ),q- <1 m ? O Om J O 109ftX MAT H N los+nnnn A lQ7 Y /06+OOM ?I r 105+00.W h 104+00.00 MAT r g V Ir W cr m O m Z mi ^ Vm V J V W J m O am u x N w w ?!w M - N W In cl? rr O zu- O WZ J W J r+? ? ? mmwm?- U ? N O C6 Z O CD O (Y) J Q rr ZO Om O ? MAT N +75 ? r fl-T+OOM A V+00.00 N+OODO R E / ee¦ ti h a- ~ ?J 11 1 / MAT N 9 W Lr) cr- O Z LL O W Z J 1) W J A Ilgt= N +0? O J J O N 0:: N Q (jo U(\J W W 2 (? 1- M ??Q 1M nn W V' SLiLtiBLiCrL.. co rr Q O IV m W U) rr C O zo W z J w t/6tf1?1?0 J t O CD O C') Z . O 0-1 W N ?L zO W CO f MAT H JNE f f: ! t` W W 5 + W A ? +7 A MAT N +00 a J J O ? 0?: <r QO UN i ? M W? mrr Q O NCO J W j e O H W ti W U) CEI- O zLL W 0 Z J W J x . ti N O N kf Kl lk. tai W 123 Lf) rlr O LL Z n W_ Z J W I 1ZLQpno ' FU68.6 i MAT N r N W v 40' 1 I 1 1 1 r r MAT IN U t u J l h rti W ? O ?'- Z LL l UJ Z r J W J 1 4 N M Q N ti W N 128+00M LD F- ? F- N Q = N d- > w O CO r,r r °zo 125 Z W J W J MAT v IN I. V r +00 + 0 MAT IN Lo F- N Q? J :N lt- Q Cc: W0 m h W rf, O Z L.L 0 W Z J C!) W J ` 134+00.00 MATCH Ml A C N _ ?p.d I w 132 in I- N Q r (\,J d- Q Wm 131 +nt)nn vp b v, / J r. r N W E. ti I- ? ? N Q ? = N W Q d W O w OD iw 25 N W ti W / MATUR 1 1 1 1 J/NE N M O ai. ? N ti W Z I- O ? CD N O 5 ILJ- H LD F - N <r S N Q > rr W O co 39fUUlaQ MATCH N +5 + I w N W W O W Z ? ? N ??. R 1. c' W/ W W W f36 a ? J +90 ~ N ® Q ? S N Q > c W O m 34+OOM MAT N F 8?- W?lo" I w - /44 N b- N W /43f0i0,0i0 1 f / I, H 'ZM Wr, i O 4- Zd ON >-m QO rf, IZTi'fTcVfj tilAT JNE i ® ?? r y W J r r W Lt 4 44 E / f MAT N 00 I ~ M 2:00 V O? Z O N 2: co >- a C'y MILD[ BOR 0 N ti W I ai ; u a L C_ u c F49+OO,M MATCH N IED FLYNN MIL 588-882 Bi +39 + 3 f r I i :CC) CO W )h •N ? w :C 0 E :m r 1 W f r 144 MAT N DRED FLYNN )R 588-882 W Di ?co ?00 C!? U ? N Ln C: CC 2:o 0M F-- Is W /4 O `? s 4 W /53+00.00 Q? X00 UI Q- _IO" co ZO =m O 152 gLi Z O 000 cn Ln J I ?-, CO 3 ? >- m Q O Y co 1 Z Z N >- 00 J O LL I 00 O 00 LtJ LO m m oO J co A MAT N +65 ?? + 5 4 ? w Q ti ?? O Jm m 2 O O D O W ? 8 ?E - * - E i o O co U) LO J i W 3 ?' >- m Q O ti Y m 00 ? W Z N Z >- CO J 00 LL 0 00 W LO O m O J W ? MAT N -&- N O M ti W to / W O? Co? u ,i ? mot' IN J wpb YO W Q S /57+MM rr WOO W g- i' LD Q J m J O W N ?nnm _ 154 MATH IN r. r y w W L E f O? Or" Ur- J t; N J N v ~+ Y O 2 +00 s + 0 W h ? C l L E / a Wpp w W cr-? O Q m W J WO N r? MAT N ft? W w@ wN ?? <L i O? Cn ? ? W O mm a WN Q i oCt ---y. M Co ~ w O M m - - --+? - --- -IW I w ?r Jwn ? Jc? ycnm UN Q gy = m %I_ I_/ ,a- wr- LLJ QUm N M: X: m O 9000 imaiSIQ amoa ioom M9999999 Yv3 CO:TT COOZ/60/ZT .?. ?. , ---- ----- -- - ---------- I I . ? ?' ? o ? ?? aDA wp F 1 ' m C1 r m C) -q -C z m wl?r ¦•? A -4 oo Ic ® art 00 ? ? 8 0;? oo v ? cn a a v .? a N r" 11-4 Y z r a v a m ? G ? 4 I ( Ull O --i Qp Z w co IF m ° ° F F + Y cn F?F FF ' ? v m 04 rti .d W i\ A r. ?? I(A .4 O -A ? c? ? cn rr,gy? w cn ='' - tttt?? ?I 2 O C) Q ' + I'F? 0 0 ?i Cal rrl o? o z 0 ro 0 w I O ? :h :h O + 2 ? I O O . O Q 0 S 50 . N 7 7 N o n e , Ul (A All - + U, 1'? O r O 9c)0 0 ro 0 w . O O ? y O IU N 1 ~ O ? RZ O ? . . o ?v a a 0 0 ° z C CO z ?. W m D CO) D D v w c av r N O to °' _ < a D W C m 1 V N 0 .. C) ° w CA P N ~ ?i CA! 00 00 = 0 N r z r m W r N m D a a v m A ... x z -a ? -c -o c? a r ? a N n n ? m m .-. r o a Z m m x Cl) N '? 2 c p m Z o C C3 r m a N > 0 7° m D C C 0 j r m c N =N O v ° CO ou m v a «'' 0 n m C M n C- z v a m -1 m D i z m W D D .. o z D CO) N OD X 1 Ca o m 70 Fo 00 ? = ' • 00 H ° CO Co CA 01 = .O N o H a Ca OD r z m- 0 z ... r ? ? N a N .? ? to 'O C7 m D r o On A m m D z -a < m 0 0 N .c .? i i i 91 r D z m cn m Ca j O C. D _ r v a G) H t0 N o N m G) O CC) < m 0 a n 0o CA .? 7D °D m m F i m !7 m r -v D Co z r D ° -? r m " o C ?o x H x s ? O CA ? w m 040119 2. 3 4 \ ' Via, i. y" ate': ¢ f . +zJ t 4. sz? j 5 Photo #1 - Downstream view from station 34+25 on SR 1347, Watauga. Photo #2 - Upstream view from station 44+45 on SR 1347, Watauga. 43 Photo #3 - Outlet view of wet pipe at station 98+75 on SR 1347, Watauga. Photo #4 - Downstream view from station 98+75 on SR 1347, Watauga. Photo #5 - Stream running through ditch line from stations 161+50 - 162+40 on SR 1347, Watauga. Photo #6 - Todd Historical District taken near the EOP adjacent to station 165+50 on SR 1347.