HomeMy WebLinkAbout20070421 Ver 1_More Info Letter_20070330~QF WATFR p Michael F. Easley, Governor
`Q G William G. Ross Jr., Secretary
U)~..- North Carolina Department of Environment and Natural Resources
~ ~
~ ..r Alan W. Klimek, P.E. Director
Division of Water Quality
March 30, 2007
DWQ Project # 2007-0421
Wake County
Page 1 of 2
CERTIFIED MAIL: RETURN RECEIPT REQUESTED
Mr. Paul Feldman
103 Kingussie Court
Cary, NC 27511
Subject Property: 103 Kingussie Court, Cary , NC
UT to Swift Creek [030402, 27-43-(1), WSIII, NSW]
REQUEST FOR MORE INFORMATION
Dear Mr. Feldman:
On March 9, 2007, the Division of Water Quality (DWQ) 401 Oversight/Express Permitting Unit
received your Minor Variance application dated March 5, 2007 regarding your request for a Minor
Variance from the Neuse Buffer Rules (15A NCAC 2B .0233) for the subject property. The Division of
Water Quality (DWQ) is required to prepare a "preliminary finding" /"finding of fact" as to whether the
variance request meets the requirements of 15A NCAC 02B .0233(9)(a). The DWQ may attach
conditions to a variance approval that support the purpose, spirit and intent of the riparian buffer
protection program. Conditions usually include stormwater management and buffer mitigation.
Additional information will be required before we can proceed with the review of your variance request.
Therefore, unless additional information is provided as described below, we will have to move toward
denial of your request per 15A NCAC 2B .0233 and will place this project on hold as incomplete until we
receive this additional information.
Additional Information Requested:
1. Site Plans
Please revise your site plan (revised plat dated July 7, 1999) to show Zones 1 and 2 of the
protected buffers.
2. Area of impact
In your application, you state that 6 feet of Zone 2 buffer will be impacted. Please revise your
plan sheet to state and show the area (in square feet) of buffer impact in Zone 2.
3. Stormwater Management
Stormwater management will be required as a condition if you choose to proceed with the Minor
Variance. Please provide a stormwater management plan depicting how you intend to treat the
stormwater running off the proposed impervious surfaces. One option you could use, is to show
that the stormwater gutter(s) on your home will be directed out of the buffers. Please show your
stormwater management devices on your plan sheet.
NorlhCarolina
401 OversightlExpress Review Permitting Unit JVatuCa!!y
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 /FAX 919-733-6893 / Internet: httn://h2o.enr.state.nc.us/ncwetlands
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
Paul Feldman
Page 2 of 2
March 30, 2007
Please respond in writing within three weeks of the date of this letter by sending a copy of this
information to me and to Lauren Cobb of the DWQ Raleigh Regional Office. If we do not hear from you
in writing within three weeks, we will assume that you no longer want to pursue your variance request
and we will consider the request as withdrawn. Please call Ms. Amy Chapman of this office at (919) 715-
6823 if you have any questions.
Sincerely,
G~'~Zr,~-rij~
(G y~~
!~ _
Cyndi Karoly, Supervisor
401 Oversight/Express Review Permitting Unit
CBK/asc
cc: Lauren Cobb, DWQ Raleigh Regional Office
File Copy
Central Files
Filename: 070421 Feldman 103 KingussieCourt(Wake)Min Var_On_Hold